| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC SANEKPUR STATION PARA P O SANEKPUR P S GOPALNAGAR NORTH 24 PARGANAS | NORTH 24 PARGANAS | NORTH 24 PARGANAS | WEST BENGAL | ₹9.3 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹9.4 LRejected-Finance PALPARA STATION MARKET P O P S CHAKDAH DIST NADIA PIN 741222 | CHAKDAH | NADIA | WEST BENGAL | 741222 | ₹9.4 L | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹9.5 LRejected-Finance | ₹9.5 L | L3 | Rejected-Finance L3 Bidder |
Tender Value
₹9.3 L
EMD Value
₹18,700
Closing Date
23 Feb 2026, 1:00 pmClosed
Refer NIeT
Refer NIeT
Laying of pipe line at damaged portion refitting work due to transmission main and construction of drain at Noada Mouza Bardhanberia Mouza by Bairampur GP at Bongaon Block under Khamarkalla W/S. Scheme (Zone-I) within the jurisdiction of North 24
2026_PHED_998641_3
WBPHED/13e/EE/NWSD1/25-26
Open Tender
CIVIL WORKS
30 days
Refer NIeT
Please refer Tender documents.
2 documents required · 2 mandatory
₹18,700
15 May 2026
3 Feb 2026
25 Feb 2026
3 Feb 2026
23 Feb 2026
3 Feb 2026
Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to IS:4985-2000 with latest revision and amendments, if any, withnecessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S. specification including labour charges for earth work in excavation in any kind of soil including mixed soil with boulder ,road sub-grade and its flanks but excluding moorum and laterite or sand stonehard arock including cutting of brick payment without damaging the existing telephone/electrical cable line etc.(in case of damage of any type of cable line during excavation, necessary damaged charges as applicable by the respaective authority will be borne by the agency in his own cost. Loading, unloading, carrying of pipes, specials, valves from the local store to work site and lowering laying of pipes specials valves carefully in trenches maintaining proper levels and alignment ,jointing the pipe and specials including supplying of good quality/approved brand solvent cement (as per IS:14182-1994 including cost of all fabricated PVC fitting i.e. tees,bend, reducers, adopter etc.as per IS:101- 1988 and making flange joints including supplying required quantity of nuts, bolts and rubber insertion (CIDF sluice valves will be supplied by the department free of cost) as required at site by adopting suitable method so as to facilate the maintenance of pipe line locally as per conventional method including back filling the trenches with good earth obtained from excavation of trenches including consolidation with watering in layer not exceeding 150mm thk. with maintaining an average depth of cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v) UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi) Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. Pressure Rating : Class - III Laying of pipe line including cost of pipe & fittings/specials & excluding cost of valve. (ii) 90 mm dia (OD) UPVC
(iv) 140 mm dia (OD) UPVC
(vii) 160 mm dia (OD) UPVC
Filling the pipe line with water, testing hydraulically as per I.S 3114-1965 (Article-6) in section of a length not exceeding 500mtr. for head of pressure as per specification including supplying installing and fixing all equipments such as diesel pump set, blank flange, pressure gauge, valve, pressure pump and all other tools and plants including drilling topping and plugging of necessary holes to pipes, blocking ends providing temporary thrust block and subsequent blocking of holes and other jointing materials and dismantling and removal of the same including disposal of water etc. all complete as per specification and direction of EIC. The rate is inclusive of cost of requisite water to be arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if contractor used water from deptt. source). For UPVC Pipe (ii) 90 mm dia (OD) UPVC
(iv) 140 mm dia (OD) UPVC
(vii) 160 mm dia (OD) UPVC
Cleaning thoroughly the inner surface of pipe line including specials and valves by flushing with water and subsequently disinfection of the same pipe line by flushing again with water containing bleaching powder resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such filling including laboratory testing of water samples obtain from the disinfested pipe line and disposal of water from the pipe line after completion of the work. The rates including of cost of requisite water to be arranged by the contractor) (The rate of water @Rs. 10/m3 may be recovered, if the contractor used water from deptt. source). For UPVC Pipe (ii) 90 mm dia (OD) UPVC
(iv) 140 mm dia (OD) UPVC
(vii) 160 mm dia (OD) UPVC
For exixting FHTC: For exixting FHTC with ferrule connection, Reflexing of exixting ferrule with fitting in the proposed distribution pipe line and supply, fitting & fixing of all other accerorise like saddle picec of required size to fit proposed pipeline specials nut & bolt rubber sheet, washer etc. including cutting trenches in all sorts of soil and filling up trenches as per direction of the EIC.
Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)
Labour for boring (horizontal) through any kind of soil for road crossing LDS including hire charges & labour for supply of suitable dia. crossing upto full width road with necessary tools, tackeles including necessary arrangment for boring & pushing required including fixing, jointing, pumping out accumulated water, lighting arrangment, sealing of two casting ends by B/W (1:4) etc. as per direction of EIC. (B/W to be giving seperately) 100 mm. dia.
Supply of G. I. pipes of TATA make including necessary sockets. 100 mm dia. (ii) Heavy quality
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_2445541.xls
BOQ • 0.39 MB
ANNEXURE.rar
Tender Documents • 0.49 MB
Download all tender documents and submit your bid