Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.6 LAccepted-AOC | ₹32.6 L | L1 | Accepted-AOC L1 executed agreement. |
| 2 | L2₹34.1 LRejected-AOC | ₹34.1 L | L2 | Rejected-AOC L1 executed agreement. |
| 3 | Rejected-Technical | - | - | Rejected-Technical L1 L2 Accepted |
| 4 | Rejected-Technical | - | - | Rejected-Technical L1 L2 Accepted |
| 5 | Rejected-Technical | - | - | Rejected-Technical L1 L2 Accepted |
| Sl No | Description | Qty | Unit | PURUSHOTHAMAN P. L5 | M P MUSHTHAK L7 | PMR ENTERPRISES PVT LTD L1 | KABEER P M L2 | SHAHUL HAMEED V L6 | V RAJAKUMARAN L3 | ABDUL RAMSHEEQ AK L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Dar | ||||||||||
| 1.01 | 60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 790 | cum | 2,890 ₹22.8 L | 3,150 ₹24.9 L | 2,300 ₹18.2 L | 2,550 ₹20.1 L | 2,968.8 ₹23.5 L | 2,806 ₹22.2 L | 2,835.18 ₹22.4 L |
| 1.02 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 490 | cum | 150 ₹73,500 | 93 ₹45,570 | 172.5 ₹84,525 | 210 ₹1.0 L | 182 ₹89,180 | 160 ₹78,400 | 173.78 ₹85,150.04 |
| 1.03 | od3045/2021_2022 : Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by smooth wheeled roller, etc complete for improving the CBR value of subgrade | 150 | cum | 1,100 ₹1.6 L | - | 977.5 ₹1.5 L | 1,200 ₹1.8 L | 764.7 ₹1.1 L | 1,000 ₹1.5 L | 1,035.64 ₹1.6 L |
| 2.00MoRD | ||||||||||
| 2.01 | 11.4.1.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
I.P.C.C grade M 10
(i)Nominal mix 1:3:6 | 31 | cum | 6,200 ₹1.9 L | 7,841.67 ₹2.4 L | 6,785 ₹2.1 L | 6,000 ₹1.9 L | 6,927.4 ₹2.1 L | 6,000 ₹1.9 L | 6,327.21 ₹2.0 L |
| 2.02 | 11.4.3.1 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203III.P.C.C. grade M 20
(i)Nominal mix (1:2:4) | 91 | cum | 6,700 ₹6.1 L | 8,323.43 ₹7.6 L | 7,762.5 ₹7.1 L | 7,300 ₹6.6 L | 7,353 ₹6.7 L | 6,500 ₹5.9 L | 6,715.93 ₹6.1 L |
| 2.03 | 11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 3 | tonne | 70,000 ₹2.1 L | 88,532.76 ₹2.7 L | 97,750 ₹2.9 L | 86,000 ₹2.6 L | 74,810.2 ₹2.2 L | 80,000 ₹2.4 L | 71,434.43 ₹2.1 L |
Tender Value
₹43.4 L
EMD Value
₹50,000
Closing Date
27 Jun 2022, 6:00 pmClosed
Executive Engineer
Office of the Executive Engineer Harbour Engineering Division Malappuram Ponnani
Side protection of Concrete road
2022_HED_495282_1
14/HED/EEM/2022-23
Open Tender
Civil Works - Roads
180 days
Purathur
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,760
Yes
₹50,000
Yes
20 Feb 2026
17 Jun 2022
29 Jun 2022
20 Jun 2022
27 Jun 2022
20 Jun 2022
17 Jun 2022 - 20 Jun 2022
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_710681.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid