| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.5 LAdmitted-Finance JHIWAREDI KARBARI DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹49.5 L | L1 | Admitted-Finance |
| 2 | L2₹51.7 LAdmitted-Finance 221 VIJAY PARK EXTENSION LANE NO 11 DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹51.7 L | L2 | Admitted-Finance |
| 3 | L3₹52.7 LAdmitted-Finance LAXMANPUR CHOWK VIKASNAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹52.7 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | national engineers and associates L2 | Shashi Enterprises L1 | garg enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00Material | ||||||
| 2.00 | Supply of 11/0.433 KV 400 KVA Compact Secondary Substation | 1 | Nos. | 42,50,000 ₹42.5 L | 41,75,000 ₹41.8 L | 42,90,000 ₹42.9 L |
| 3.00 | Dead End clamp with I hook AB Cable SP-21 | 5 | Nos. | 300 ₹1,500 | 300 ₹1,500 | 310 ₹1,550 |
| 4.00 | PP & Clamp with N&B ST Pole SP-23 | 10 | Nos. | 350 ₹3,500 | 325 ₹3,250 | 360 ₹3,600 |
| 5.00 | Suspension Clamp with Eye Hook AB Cable for SP-21 | 10 | Nos. | 300 ₹3,000 | 300 ₹3,000 | 310 ₹3,100 |
| 6.00 | GI Pipe 4" Dia | 10 | Mtr. | 2,400 ₹24,000 | 2,200 ₹22,000 | 2,500 ₹25,000 |
| 7.00 | LT Distribution Box | 15 | Nos. | 2,500 ₹37,500 | 2,800 ₹42,000 | 3,000 ₹45,000 |
| 8.00 | Distribution Box clamp | 30 | Nos. | 300 ₹9,000 | 300 ₹9,000 | 310 ₹9,300 |
| 9.00 | LT AB Cable 3x120+1x95+1x16 sq.mm | 300 | Mtr. | 400 ₹1.2 L | 390 ₹1.2 L | 400 ₹1.2 L |
| 10.00 | Al. Crimping type lugs 120 sq.mm | 32 | Nos. | 110 ₹3,520 | 125 ₹4,000 | 130 ₹4,160 |
Tender Value
₹49.5 L
EMD Value
₹99,000
Closing Date
22 Dec 2025, 12:00 pmClosed
SE EDC Srinagar Garhwal
SE EDC Srinagar Garhwal
Replacement of 250 KVA Transformer to 400 KVA CSS in Neelkanth under 33/11 KV Bijnibadi under EDD Kotdwar on Semi-Turnkey Basis
2025_UPCL4_89719_1
Tender no. 30/EDC(s)/2025-26
Open Tender
Electrical Works
180 days
Srinagar
Replacement of 250 KVA
Transformer to 400 KVA CSS
in Neelkanth under 33/11 KV
Bijnibadi under EDD Kotdwar
on Semi-Turnkey Basis
3 documents required · 3 mandatory
₹2,360
EE ETD Srinagar Garhwal
₹99,000
6 Jan 2026
10 Dec 2025
23 Dec 2025
10 Dec 2025
22 Dec 2025
10 Dec 2025
Amount
Material
Supply of 11/0.433 KV 400 KVA Compact Secondary Substation
Dead End clamp with I hook AB Cable SP-21
PP & Clamp with N&B ST Pole SP-23
Suspension Clamp with Eye Hook AB Cable for SP-21
GI Pipe 4" Dia
LT Distribution Box
Distribution Box clamp
LT AB Cable 3x120+1x95+1x16 sq.mm
Al. Crimping type lugs 120 sq.mm
Al. Crimping type lugs 400 sq.mm
Al. Crimping type lugs 240 sq.mm
Labour
Construction of Returning wall & Plinth
Making foundation of CSS with all work
Chemical Earthing
Fabrication of steel
Fixing of Pipe
Excavation of pit for pole
Erection of Single SP-21 Pole
Grouting of Pole
Dismantling of 250 Kva DTR
Cement concreting work DTR plinth
Laying of AB Cable of Size 120 sq.mm
Cartage of petty material, 71-100 Km.
Head Load cartage of material (0-1 Km.)
Hipot cable testing before energizing
Providing and Fixing of fencing for CSS
Erection & Commissioning of 400 KVA CSS
Installation of 120 sq.mm LT Al. Lugs
Erection of earth strip 50x6 mm
Laying of 1x120 sq.mm XLPE Cable
Fixing of Distribution clamp
national engineers and associates (BID ID -410938)
garg enterprises (BID ID -411060)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.86 MB
Tendernotice_2.pdf
PDF • 2.24 MB
PQR30.pdf
Other Document • 0.85 MB
Tenderdocuments30.pdf
Tender Documents • 2.23 MB
BOQ_106361.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid