Loading…
Loading…
Tender Value
₹6.0 Cr
EMD Value
₹12.0 L
Closing Date
18 Jun 2026, 4:00 pm
Executive Engineer HIMUDA
HIMUDA Division Dharamshala
Construction works
2026_HIMUD_136074_1
HIMUDA/DD/2025-2661-70
Open Tender
Civil Works
365 days
Nagrota Bagwan
Please refer Tender documents.
10 documents required · 10 mandatory
₹5,900
Yes
₹12.0 L
Yes
Rakkar Dharamshala
8 Jun 2026
8 Jun 2026
19 Jun 2026
9 Jun 2026
18 Jun 2026
9 Jun 2026
9 Jun 2026 - 18 Jun 2026
11 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work in all heights/depths in all kinds of soil such as kankar, moorum, single and decomposed or soft rock, hard rock i.e. their intermediate classifications and chiselling/wedging out of rock where blasting is prohibited including saturated soils & filling embankments etc.where necessary & disposal of exacavated unserviceable material through mechnically transporation, the disposal of same will be done by contractor up to all leads & lifts and nothing extra on this account will be paid upto any extent/ reasons what so ever. Any damage to the private/public property during execution will be restored by the contractor what so ever the nature of the same may be. The serviceable material will be stacked in specified dimensions in all leads & lifts as per the direction of the Engineer-in-charge | 2,230.2 | Cum | 528 | ₹11,77,545.6 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, upto all leads & lifts as directed by the Engineer-in- charge. (a) All kinds of soil. | 1,120.2 | Cum | 238.7 | ₹2,67,391.74 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of surplus excavated soil as directed, upto all leads & lifts as directed by the Engineer-in- charge.All kinds of soil | 421.2 | Cum | 173.4 | ₹73,036.08 |
| 4 | Providing and laying hand packed stone filling under floors including watering, ramming, consolidating and dressing complete including carriage of material in all lead & lifts. | 404.86 | Cum | 1,478.2 | ₹5,98,464.05 |
| 5Centering and shuttering including strutting, propping etc. and removal of form for including carriage of material in all leads and lifts. | |||||
| 5.01 | Foundations, footings, bases of columns, etc. for mass concrete | 58 | Sqm | 287.6 | ₹16,680.8 |
| 5.02 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses,plinth and string courses and the like. | 75.6 | Sqm | 482.3 | ₹36,461.88 |
| 5.03 | Columns, Pillars, Piers, Abutments, Posts and Struts. | 507.97 | Sqm | 717.5 | ₹3,64,468.48 |
| 5.04 | Lintels, beams, plinth beams, girders, bressumers and cantilevers | 1,575.32 | Sqm | 459.3 | ₹7,23,544.48 |
| 5.05 | Suspended floors, roofs, landings, balconies and access platform. | 848.35 | Sqm | 643 | ₹5,45,489.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.52 MB
BOQ_201431.xls
BOQ • 0.47 MB
ar6820cr.pdf
Tender Documents • 2.14 MB
UNDERTAKINGTender.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid