Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 3 56 MELA STREET SANNASIPATTI POOLANKULATHUPATTI TRICHY 620009 | TIRUCHIRAPPALLI | TAMIL NADU | 620009 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹26.6 L
EMD Value
₹27,000
Closing Date
21 Jan 2025, 4:00 pmClosed
Block Development Officer (BP) ,Manikandam
Block Development Officer (BP) ,Manikandam
Strengthening the BT road at Kuttapattu to Rajeswari Nagar and Anbu Nagar Road in N.Kuttapttu Panchayat in Manikandam Block in Trichy District Under in Pooled Assigned Revenue 2023-24
2025_RDTN_518492_1
A2/35/2025-26 - Dt 06.01.2025
Open Tender
Civil Works - Roads
Item Rate
90 days
Manikandam
Refer Tender Notice
5 documents required · 5 mandatory
₹0
₹27,000
Yes
23 Jan 2025
13 Jan 2025
21 Jan 2025
13 Jan 2025
21 Jan 2025
13 Jan 2025
Amount
Strengthening the BT road @ Kuttapattu to Rajeswari Nagar & Anbu Nagar Road in N.Kuttapttu Panchayat in Manikandam Block in Trichy District Under in Pooled Assigned Revenue 2023-24 Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Collection And Supply of US gravel including Cost & conveyance of U,S Gravel and Stacking them on road side to dept guage for taking pre measurment etc.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying Primer Coat over the WMM surface using 7.00 Kg of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.50 Kg of bitumen emulsion RS-1 of bitumen as binder for 10 Sqm. area including cost and conveyance of bitumen which will of the same which will be recovered from the contractor's bill at the rates specified in the special condition appended herewith including conveyance of bitumen from 'section stores to worksite handling charges of bitumen from section stores to worksite handling charges of bitumen at both ends and including all labour charges bitumen to the required temperature including labour charges for applying tack coat uniformly including hire charges of bitumen sprayer (with self heating and pumping arrangement) and all other tools and plants employed and also as as per clause 505 of most specifications.
BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Providing for Hectametre Stone
Providing for Name Board painting & Lettering charges etc.,
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHINNAIYAN SUBRAMANIAN (BID ID -1234565)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .