| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.8 L+₹11,057.23 (4.13%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | 3₹2.9 L+₹19,645.39 (7.35%)Rejected-Finance | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Sinoj M George L2 | M J KURIAN L3 | DILIPKUMAR T P L1 |
|---|---|---|---|---|---|---|
| 1.00Compound wall | ||||||
| 1.00 | 15.7.1:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In mud mortar | 8.18 | cum | 640.3 ₹5,237.65 | 660.47 ₹5,402.64 | 614.87 ₹5,029.64 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 8.13 | cum | 316.07 ₹2,569.33 | 325.89 ₹2,649.16 | 303.31 ₹2,465.61 Lowest |
| 1.00 | OD203342/2025-2026: DPT Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 4.09 | cum | 3,228.72 ₹13,205.46 | 3,332.27 ₹13,628.98 | 3,100.48 ₹12,680.96 Lowest |
| 1.00 | OD203343/2025-2026:Laterate masonry with neatly dressed laterate stone of size 35x20x20cm or nearest
size in cement mortar 1:6 for foundation and basement including all cost of materials, labour charges etc. | 22.4 | cum | 5,340.91 ₹1,19,636.38 | 5,513.29 ₹1,23,497.7 | 5,128.76 ₹1,14,884.22 Lowest |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.09 | cum | 9,215.98 ₹37,739.44 | 9,513.76 ₹38,958.85 | 8,849.91 ₹36,240.38 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 23.4 | sqm | 339.29 ₹7,939.39 | 350 ₹8,190 | 325.82 ₹7,624.19 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 307.12 | kilogram | 98.77 ₹30,334.74 | 101.24 ₹31,093.34 | 94.86 ₹29,133.88 Lowest |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 96.1 | sqm | 324.89 ₹31,221.93 | 334.57 ₹32,152.18 | 311.99 ₹29,982.24 Lowest |
| 1.01 | 13.37.1:White washing with lime to give an even shade:New work (three or more coats) | 96.1 | sqm | 35.72 ₹3,432.69 | 36.63 ₹3,520.14 | 34.31 ₹3,297.19 Lowest |
Tender Value
₹3.0 L
EMD Value
₹7,454
Closing Date
9 Sept 2025, 5:00 pmClosed
ASSISTANT ENGINEER
LSGD, KINANOOR KARINTHALAM GP
KINANOOR KARINTHALAM GP PRO.NO.58/25-26 Construction of Compound wall for Keezhmala Anganvadi
2025_LSGD_792364_1
AE/LSGD/KKGP/2/TN/25-26/PRO. NO.58
Open Tender
Civil Works - Others
Item Rate
KARINTHALAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹660
Yes
₹7,454
Yes
6 Nov 2025
2 Sept 2025
12 Sept 2025
2 Sept 2025
9 Sept 2025
2 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .