| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 CrAdmitted-Finance | -30.15% | ₹4.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.9 Cr+₹12.0 L (2.51%)Admitted-Finance AT BELTIKIRI SADAR DHENKANAL | -28.40% | ₹4.9 Cr+₹12.0 L (2.51%) | L2 | Admitted-Finance |
| 3 | L3₹5.0 Cr+₹21.7 L (4.52%)Admitted-Finance | -26.99% | ₹5.0 Cr+₹21.7 L (4.52%) | L3 | Admitted-Finance |
| 4 | L4₹5.1 Cr+₹28.4 L (5.93%)Admitted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | -26.01% | ₹5.1 Cr+₹28.4 L (5.93%) | L4 | Admitted-Finance |
| 5 | L5₹5.1 Cr+₹28.4 L (5.94%)Admitted-Finance | -26.00% | ₹5.1 Cr+₹28.4 L (5.94%) | L5 | Admitted-Finance |
Tender Value
₹6.9 Cr
EMD Value
₹6.9 L
Closing Date
20 Jun 2026, 5:00 pmClosed
CCE.KIP,Basudevpur
O/o the CCE.KIP,Basudevpur
Construction of CAD and WM works of Balibandha Minor Directly off taking from KMC at RD 27355M, Balibandha Sub-Minor-I and Balibandha Sub-Minor-II off taking from Rajabasa Minor at RD 1990M and RD 2090M respectively of Pani Panchayat No-21 of KIP
2026_KPRIP_131305_2
CCE,KIP(KRC AND BD)-01/2026-27
National Competitive Bid
Civil Works - Canal
Percentage
330 days
SE Kanupur Reh. C and B Division Basudevpur
Please refer tender documents
3 documents required · 3 mandatory
₹10,000
₹6.9 L
Yes
29 Aug 2026
6 Jun 2026
22 Jun 2026
6 Jun 2026
20 Jun 2026
6 Jun 2026
6 Jun 2026 - 20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil including stony earth, gravel, moorum, etc. interspread with boulders up to 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per specification as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation etc. complete. | 1 | Cum | 81.95 | ₹81.87 |
| 2 | Supply and filling foundation and plinth with sand by mechanical, laying in layer duly compacted, including cost of watering, ramming with all leads,cost, carriage, roylty of materials, cost of labour cess And all cost incidental to work etc complete as per the specificaton and direction of the Engineer-in-charge. | - | Cum | 967.4 | - |
| 3 | Cement concrete (1:3:6) with 40mm size hard granite metal with watering and curing including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete and as per the direction of the Engineer-in-Charge. | 1 | Cum | 6,222.4 | ₹6,216.18 |
| 4 | R.C.C. work of M-15 grade with 20mm down graded hard black granite CB chips with watering and curing excluding shuttering but including cost,conveyance ,royalty of all materials ,labour ,T& P etc complete as per direction of Engineer-in- Charge. | 1 | Cum | 5,875.3 | ₹5,869.42 |
| 5 | Providing formwork for concrete with F1 finish for upstream faces of dam,spillway,glacis of barrage,unexposed surface of foundation,block joints etc with steel shutters ,rigidly fixed and removal of forms and making good to the surfaces where necessary complete with all labour,materialss and T & P complete as directed by the Engineer-in-charge. | 1 | Sqm | 946.8 | ₹945.85 |
| 6 | Rigid and smooth centering and shuttering for C.C./R.C.C works including false works and dismantling them after casting including costof materials complete in ground floor. (A) For R.C.C foundation,plingth band and footing base of columns,mass concrete precast slabs etc. | - | Sqm | 249.8 | - |
| 7 | Supplying, cutting, bending, binding & placing Uncoated HYSD bar reinforcement complete as per drawing and technical specification, including cost, carriage, royalty of all materials and labour etc. complete as per the direction of Engieer-in-charge. | - | Qntl | 9,865.8 | - |
| 8 | Providing and laying RCC hume pipes of 300mm dia NP3 in position on properly prepared approved surface including cost, carriage, royality of humepipes and cost of labour etc complete as per the direction of the Engineer-in-Charge. | - | Rm | 1,119.7 | - |
| 9 | Filling foundation and plinth with excavated material with well compacted etc. complete as per the direction of the Engineer-in-charge. | 1 | Cum | 173.1 | ₹172.93 |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.69 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.99 MB
TsBalibandhaMerged.pdf
Tender Documents • 6.03 MB
BOQ_594916.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .