Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance | ₹5.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹6.2 LAccepted-Finance | ₹6.2 L | L2 | Accepted-Finance L2 |
| 3 | L3₹6.5 LAccepted-Finance | ₹6.5 L | L3 | Accepted-Finance L3 |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
25 Nov 2025, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Civil works regarding 33 KV M/S CRD Consumer Products Bay at 132 KV Sub-station Bharawan Sandila Hardoi
2025_UPCTL_1090057_1
63/ECTC(L)/2025-26
Open Tender
Civil Works
30 days
SE ECTC SLDC Campus UPPTCL, Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Superintending Engineer, E.C.T.C. Lucknow
₹14,000
22 Jan 2026
12 Nov 2025
26 Nov 2025
12 Nov 2025
25 Nov 2025
12 Nov 2025
Civil works regarding 33 KV M/S CRD Consumer Products Bay at 132 KV Sub-station Bharawan Sandila Hardoi
Total Rs. ( Without GST)
Terms & Conditions:
1.All civil work shall be executed according to the approved drawings of UPPTCL.
2.The quantities are tentative and may vary to any extent or deleted during execution as per actual approved lay out plan & site condition.
3.All civil work shall be carried out as per UPPWD/UPPTCL specification.
4.Rates in BOQ are exclusive of CGST,SGST.Labour tax shall be borne by contractor.
5.Pozzlona Portland cement confirming to IS 1489(Part 1) 1991 of approved quality like ACC,Ultra-Tech,Birla or equi.shall only be used.
6.Overweight steel section within tolerance shall be measured at standard weight and underweight steel section within tolerance shall be measured at actual weight.
7.In case any change in Bill of Quantity is suggested by higher authority that will be binding on the contractor. The agreement shall be executed on the approved Bill of Quantity only.
8.In case of dismantling of civil structure at site, 60% brick work shall be treated as fresh brick, 30% as brick bat and 10% as debris. Fresh brick and brick bat shall be issued to contractor / firm at prevailing/pertaining SOR.
9.The amount of scrape steel recoverd from dismantling shall be issued to contractor / firm at 1/3rd of rate in prevailing/pertaining SOR .
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.50 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_2001712.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid