Loading…
Loading…
Tender Value
₹85.8 L
EMD Value
₹1.7 L
Closing Date
22 Oct 2026, 1:00 pm
Superint. Engineer, PWD Building Circle, Kokrajhar
O/o the SE, PWD Building Circle, Kokrajhar
Construction of Guest House at Mothambil (NELC) Circle with Boundary wall, Iron Gate, Campus filling and approach road at Mothambil in Kokrajhar District.
2026_BoTC_54213_1
SE(B)/21-22/Pt-IV/18/569_3
Open Tender
Civil Works - Building
Item Rate
360 days
Kokrajhar
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,800
₹1.7 L
Yes
29 Sept 2026
29 Sept 2026
22 Oct 2026
30 Sept 2026
22 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1. CIVIL WORK :
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.
2.6.1 All kinds of soil | 111.13 | Cum | - | - |
| 2 | Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete:
16.12.1 With common burnt clay F.P.S. (non modular) brick of class designation 7.5 | 191.56 | Sqm | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1 : 3 : 6 (1 Cement: 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.39 | Cum | - | - |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 2,871.54 | Kg | - | - |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level.
5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more. | 9,730.87 | Kg | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
5.9.1 Foundations, footings, bases of columns, etc. for mass concrete | 48.19 | Sqm | - | - |
| 7 | 5.9.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers | 273 | Sqm | - | - |
| 8 | 5.9.6 Columns, Pillars, Piers, Abutments, Posts and Struts | 135.98 | Sqm | - | - |
| 9 | 5.9.3 Suspended floors, roofs, landings, balconies and access platform | 300 | Sqm | - | - |
| 10 | REINFORCED CEMENT CONCRETE
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :
5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 27.15 | Cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
Tendernotice_2.pdf
PDF • 4.55 MB
Tendernotice_3.pdf
PDF • 0.34 MB
BOQ_85122.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .