Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance C 51 SUDERSHANPURA INDUSTRIAL AREA BAIS GODAM JAIPUR JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | Admitted-Finance |
| 2 | Admitted-Finance 0 NEAR RAJGHAT BRIDGE LALGANJ ROAD DARIBA RAEBARELI UTTAR PRADESH 229001 | RAE BARELI | UTTAR PRADESH | 229001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹18.8 L
EMD Value
₹37,584
Closing Date
26 May 2020, 5:00 pmClosed
RIICO Ltd. Jhalawar
RIICO Ltd. Jhalawar
Operation and Maintenance of LED Street Lights and High Mast lights at Industrial area, Growth Center, Jhalawar
2020_RIICO_183551_1
NIT No. 01/2020-2021_RIICO_JWR
Open Tender
Miscellaneous Services
Item Rate
730 days
Jhalawar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
RIICO Ltd. Jhalawar
₹37,584
29 May 2020
15 May 2020
29 May 2020
15 May 2020
26 May 2020
15 May 2020
Amount
O and M LED Streel Light and High Mast Light
Maintenance of Street Light Fixtures in entire Industrial Area including supply and replacing the required material and labour complete as per the following terms and conditions -(1) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, failing which three times of the maintenance charges payable for each fixture for the month shall be penalized and recovered from the contractor.(2) Contractor shall arrange at his cost for put on and off the street light fixture at appropriate time regularly as per instructions of Engineer in charge. A register shall be maintained at RIICO association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO Association office daily and comply the instructions and attend complaints regularly.(3) Contractor will have to employ trained and qualified electricians for the work.(4) Corporation shall not be responsible for any kind of accident during execution of work.(5) Contractor will be responsible for safety and security of fixtures and all concerned materials.(6) Contractor will be responsible for arrangement of all T and P required for the work(7) Cost of all labour and material like tube, rod, starter, ballast, wire will be born by contractor. All material required for the work shall equivalent to same standards as provided at start of work and in no case below the category II of concerned BSR item. (8) Contractor has to repair and maintenance tube light fixture with material in all cases like short circuit, phase to phase of JVVNL line etc.(9) No extra payment will be made for fixing or removal of extra or existing fixture in the industrial area.(10) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill of the contractor. Payment of electricity bill will be made by RIICO.(11) Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintained the On and Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment.(12) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor.(13) Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair or replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material.(14) Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100 per fixture per day will be imposed on the contractor. LED Fixture ( 40,80,120 Watt )
Maintenance of Street Light Fixtures in entire Ind. Area including supply and replacing the required materMaintenance of Street Light Fixtures in entire Industrial Area including supply and replacing the required material and labour complete as per the following terms and conditions -(1) At any moment a minimum of 90 percent of total fixture must be in order. The defective fixture must be repaired within 3 days, failing which three times of the maintenance charges payable for each fixture for the month shall be penalized and recovered from the contractor.(2) Contractor shall arrange at his cost for put on and off the street light fixture at appropriate time regularly as per instructions of Engineer in charge. A register shall be maintained at RIICO association office and complaint lodged must be attended by contractor within 24 hours. The person deputed by contractor shall attend the RIICO Association office daily and comply the instructions and attend complaints regularly.(3) Contractor will have to employ trained and qualified electricians for the work.(4) Corporation shall not be responsible for any kind of accident during execution of work.(5) Contractor will be responsible for safety and security of fixtures and all concerned materials.(6) Contractor will be responsible for arrangement of all T and P required for the work(7) Cost of all labour and material like tube, rod, starter, ballast, wire will be born by contractor. All material required for the work shall equivalent to same standards as provided at start of work and in no case below the category II of concerned BSR item. (8) Contractor has to repair and maintenance tube light fixture with material in all cases like short circuit, phase to phase of JVVNL line etc.(9) No extra payment will be made for fixing or removal of extra or existing fixture in the industrial area.(10) Contractor will be responsible for timely collection and deposition of electric bills of areas in each month. In case of delay in payment and JVVNL impose surcharge for delay payment the same will be recovered from the running bill of the contractor. Payment of electricity bill will be made by RIICO.(11) Contractor will be responsible for rebate of Timer provided by JVVNL. Hence contractor will maintained the On and Off system by timer properly. In case no rebate is provided by JVVNL due to failure of timer then rebate will be deducted from contractor payment.(12) Contractor will be responsible for any theft of electricity through poles and he will make necessary arrangements for this. In case of any theft is found suitable penalty will be imposed on the contractor.(13) Contractor will maintain cubical panel board and assessories fitted in it. In case of any fault repair or replace of material will be done by the contractor at his own cost. No extra payment will be made on behalf of material.(14) Contractor has to keep ready total fixtures. In case of fault of fixture a penalty of Rs.100 per fixture per day will be imposed on the contractor. LED Flood Light Fixture ( 200 Watt )
SONU SALES COMPANY
Ms Jhandel Singh Sisodia
M/S DEEPAK ENTERPRISES
LIGHTRON INDUSTRIES PRIVATE LIMITED
PRAGYA ENGINEERING WORKS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .