Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.8 LAccepted-AOC | L1 | Accepted-AOC First lowest | |
| 2 | L2₹38.8 L+₹22,910.45 (0.59%)Rejected-AOC | L2 | Rejected-AOC Second Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
15 Feb 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, PWD Roads Division, Kollam
Office of the Executive Engineer, PWD Roads Division, Kollam
O R - 2020-21 Urgent patch repairs by Providing close graded premix carpeting and allied works to Chirattakkonam Panaveli road
2021_PWD_412771_1
83/ET/EE/2020-21
Open Tender
Civil Works - Roads
Item Rate
90 days
Chirattakkonam Panaveli road
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
6 Aug 2021
6 Feb 2021
18 Feb 2021
6 Feb 2021
15 Feb 2021
6 Feb 2021
60 days
Amount
maintanance
55.4 : Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.2 : Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.8.a : Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
55.5.a : Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.Levelling undulation with precoated chips with 1% of paving bitumen (vg 30) by weight of chips in a suitable mixer duly heated to 160 degree temperature spreading, levelling and rolling to required line and level for thickness up to 20 mm.
5.2.a : Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
od15981/2020_2021 : Mix Seal Surfacing -Providing, laying and rolling of close-graded premix surfacing of 20 mm thickness composed of 13.2 mm to 0.9 mm aggregates using Bitumen VG-30 to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 of MORD. (Total usage of bitumen 27Kg/10m2).
3.13.1.B : Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.<br> Ordinary soil - Mechanical Means - (Depth upto 3 m) <br>Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. Ordinary soil - Mechanical Means - (Depth upto 3 m)
15.9 : Construction of dry rubble flooring at cross drainage works for relatively less important works.Construction of dry rubble flooring at cross drainage works for relatively less important works.
12.4 : Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. <br> PCC Grade M15 <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1 : Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications <br> RCC Grade M20 - Using Concrete Mixer <br>Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
12.40 : Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical SpecificationsSupply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
od15991/2020_2021 : PlainCement Concrete PCC Grade M20 (Without formwork) as wearing coarse in Open Foundation complete as per Drawing and Technical Specifications
10.2 : Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.Maintenance of Earthen Shoulder (filling with fresh soil) Making up loss of material/ irregularities on shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
SHIJU.C.RAJU
Bidder Name
Baby Varghese
SHIJU.C.RAJU
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_586431.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .