| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC Lowest bid | |
| 2 | L2₹7.2 L+₹10,752.79 (1.51%)Rejected-AOC | L2 | Rejected-AOC second lowest | |
| 3 | L3₹7.7 L+₹53,556.39 (7.50%)Rejected-AOC | L3 | Rejected-AOC third lowest |
Tender Value
₹8.6 L
EMD Value
₹21,500
Closing Date
10 Jan 2020, 4:00 pmClosed
Assistant Executive Engineer
head works sub division malampuzha
Demolishing, Earth work, centering and shuttering, cement concrete, plastering
2019_Irrig_330428_1
19/ET/HW/2019-2020
Open Tender
Repair and Maintenance Works
Item Rate
150 days
malampuzha
Please refer Tender documents.
6 documents required · 6 mandatory
₹2,200
online
₹21,500
Yes
22 Feb 2020
18 Dec 2019
16 Jan 2020
18 Dec 2019
10 Jan 2020
19 Dec 2019
19 Dec 2019 - 2 Jan 2020
Amount
lining work
15.2.2 : Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:4:8 leaner mix ( including equivalent design mix)
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
50.13.1 : 9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
60.2.1 : EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
SATHEESH BABU N
SIVAN R
Bidder Name
SATHEESH BABU N
SIVAN R
V A ABDUL MUTHALIF
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_459381.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .