Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹20.9 L
EMD Value
₹42,000
Closing Date
24 Dec 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Room No 55, Dr B R Ambedkar University Delhi, Lothian Road, Kashmere Gate Delhi -110006
Comprehensive Annual Maintenance Contract (CAMC) of various Heat Pump type VRF/VRV Air conditioning system installed in Karampura Campus, Dr. B.R. Ambedkar University Delhi
2025_AUD_282364_1
NIT/04/EE/EMU/AUD/2025-26
Open Tender
Repair and Maintenance Services
Item Rate
365 days
DR B R Ambedkar University Delhi, Karampura Campus
As per NIT
9 documents required · 9 mandatory
₹0
₹42,000
Kashmere Gate Delhi
4 Dec 2025
4 Dec 2025
24 Dec 2025
4 Dec 2025
24 Dec 2025
4 Dec 2025
4 Dec 2025 - 24 Dec 2025
22 Dec 2025
Comprehensive (Routine, Preventive and Breakdown) Maintnenace of DAIKIN make VRF/VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (Cassette type cieling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B: 01 Job means during a period of one year) Comprehensive Annual Maintenance Contract of various Heat pump type VRF/VRV Air conditioning system. Outdoor unit, Cluster 2 (B-Block/Computer Lab, Faculty Cabin GF & FF, Classroom FF); 2 modules (Circuit 1,6) 2 modules (Capacity: 1 x 8HP + 2 x 10 HP): Total 56 HP.
Comprehensive (Routine, Preventive and Breakdown) Maintnenace of DAIKIN make VRF/VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (Cassette type cieling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B: 01 Job means during a period of one year) Comprehensive Annual Maintenance Contract of various Heat pump type VRF/VRV Air conditioning system. Outdoor unit, Cluster 3 (B-Block/Classroom GF & FF,VC Room GF, Committee Room GF, Libraray, DR & AR Room, Admin Room); (Circuit 2,4,5,7) 4 modules (Capacity: 2 x 12 HP): Total 96 HP.
Comprehensive (Routine, Preventive and Breakdown) Maintnenace of DAIKIN make VRF/VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (Cassette type cieling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B: 01 Job means during a period of one year) Comprehensive Annual Maintenance Contract of various Heat pump type VRF/VRV Air conditioning system. Outdoor unit, Cluster 4 (B-Block/Faculty Room FF, Audi Mezzanine Ground & First); (Circuit 3,10) 2 modules (Capacity: 1 x 6HP + 1 x 8HP): Total 28 HP.
Comprehensive (Routine, Preventive and Breakdown) Maintnenace of DAIKIN make VRF/VRV Type AC including AHU if any, its all accessories, condensers, evaporator units (Cassette type cieling mounted), time to time checking of refrigerant leakage, regular cleaning of condenser and evaporator units, attending and repairing of any kind of fault in the system, replacement of any unserviceable spare parts, electrical circuits etc. for smooth operation of the entire AC units. Spare parts required during breakdown maintenance shall be arranged and replaced by the Contractor. This is applicable for the whole system of AC units installed. (N.B: 01 Job means during a period of one year) Comprehensive Annual Maintenance Contract of various Heat pump type VRF/VRV Air conditioning system. Outdoor unit, Cluster 1 (B-Block/Auditorium); (Circuit 8,9) 2 modules (Capacity: 3 x 12 HP): Total 72 HP.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
tenderupload.rar
Additional Documents • 0.86 MB
CAMCVRVTender1.pdf
Tender Documents • 0.34 MB
BOQ_373087.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .