Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance | -0.01% | ₹2.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹2.9 L+₹29.11 (0.01%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹2.9 L+₹29.11 (0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,822
Closing Date
14 Sept 2026, 6:00 pmClosed
EXECUTIVE ENGINEER REW BARAMULLA
EXECUTIVE ENGINEER REW BARAMULLA
Construction of Drain from Filtration House to Kraez Khul at Tujjer B (BLOCK Tujjer Sharief) Under ADP(BDC) 2026-27
2026_RDPR_322716_8
e- NIT No. 212/2026-27 Dated 29-08-2026
Open Tender
Civil Works
Percentage
45 days
BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹5,822
17 Sept 2026
29 Aug 2026
15 Sept 2026
29 Aug 2026
14 Sept 2026
29 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed All kinds of soil | 38.35 | CUM | 479.3 | ₹18,381.16 |
| 2 | Providing and laying of stone soiling hand packed including all cost and carriage complete. | 8.21 | CUM | 1,300 | ₹10,673 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 18.79 | CUM | 6,591.25 | ₹1,23,849.59 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns | 78 | SQM | 286.35 | ₹22,335.3 |
| 5 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 105.2 | SQM | 266.2 | ₹28,004.24 |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.6 | CUM | 7,788.4 | ₹28,038.24 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 360 | KGS | 120 | ₹43,200 |
| 8 | Carriage of agg/sand by MT from source to site of work complete | 31.48 | CUM | 465 | ₹14,638.2 |
| 9 | Provision for CIB and PHOTOGRAPHS | 1 | JOB | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
finance_1084040.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_1084040.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .