| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | l1₹9.2 LAccepted-AOC | ₹9.2 L | l1 | Accepted-AOC L1 |
| 2 | Rejected-Technical | - | - | Rejected-Technical L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical l4 |
| 4 | Rejected-Technical | - | - | Rejected-Technical l3 |
| Sl No | Description | Qty | Unit | AHMAD FAROOK K L4 | SHYAM KRISHNAN M L2 | SANTHOSHKUMAR V V L1 | MADIKAI PANCHAYATH LABOUR CONTRACT CO-OPERATIVE SOCIETY LTD NO S L3 |
|---|---|---|---|---|---|---|---|
| 1.00BUILDING CONSTRUCTION | |||||||
| 1.00 | 2.9.1:Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 31.95 | cum | 517.64 ₹16,538.08 | 350 ₹11,182.15 | 433.52 ₹13,850.53 | 465.88 ₹14,884.40 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 5.66 | cum | 6,687.21 ₹37,822.86 | 4,850 ₹27,431.60 | 5,600.54 ₹31,676.65 | 6,018.49 ₹34,040.58 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 17.04 | sqm | 329.03 ₹5,606.67 | 230 ₹3,919.20 | 275.56 ₹4,695.54 | 296.13 ₹5,046.06 |
| 1.00 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 51.08 | sqm | 703.77 ₹35,945.05 | 600 ₹30,645 | 589.41 ₹30,104.12 | 633.39 ₹32,350.39 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size | 9.74 | cum | 8,914.94 ₹86,795.86 | 7,500 ₹73,020 | 7,466.26 ₹72,691.51 | 8,023.45 ₹78,116.31 |
| 1.01 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 2.92 | cum | 10,748.82 ₹31,343.56 | 8,700 ₹25,369.20 | 9,002.14 ₹26,250.24 | 9,673.94 ₹28,209.21 |
| 1.01 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size). | 4.08 | cum | 11,277.61 ₹46,023.93 | 9,500 ₹38,769.50 | 9,445 ₹38,545.05 | 10,149.85 ₹41,421.54 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 47.7 | sqm | 637.63 ₹30,414.95 | 470 ₹22,419 | 534.02 ₹25,472.75 | 573.87 ₹27,373.60 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,791.11 | kilogram | 96.46 ₹1.7 L | 86 ₹1.5 L | 80.79 ₹1.4 L | 86.81 ₹1.6 L |
Tender Value
₹10.2 L
EMD Value
₹25,420
Closing Date
13 Dec 2024, 5:00 pmClosed
SANOOPCHANDRAN C
ASSISTANT ENGINEER LID EW MADIKAI GP
307/24-25-Construction of Women fitness center at thekkan banagalam
2024_LSGD_713423_1
307/AE/LID/2024
Open Tender
Civil Works - Others
180 days
MADIKAI
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,420
Yes
18 Apr 2026
6 Dec 2024
17 Dec 2024
6 Dec 2024
13 Dec 2024
6 Dec 2024
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1123509.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1123509.xls
BOQ • 0.33 MB
viewsbd.pdf
Tender Documents • 1.70 MB
Download all tender documents and submit your bid