Loading
Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹25 L
Closing Date
5 Aug 2022, 3:00 pmClosed
PR & CC
STAGE II CENTRAL VAPOUR RECOVERY SYSTEM AT 100 RETAIL OUTLETS PAN INDIA
22000298-HD-10157
22000298-HD-10157
Open Tender
Ludhiana, Punjab
₹0
₹25 L
5 Aug 2022
21 Jul 2022
5 Aug 2022
5 Aug 2022
22 Jul 2022 - 27 Jul 2022
26 Jul 2022
| Item No | Item Title | Description | Qty | Unit |
|---|---|---|---|---|
| 1 | VAPOR RECOVERY NOZZLE | VAPOR RECOVERY NOZZLE — VAPOR RECOVERY NOZZLE, 3/4 INCH STANDARD DUTY NOZZLE, 49 RU VRS STAGE II: SUPPLY AND FIXING OF VAPOUR RECOVERY NOZZLE WITH ACCESSORIES. | - | Each |
| 2 | VAPOR RECOVERY HOSE | VAPOR RECOVERY HOSE — VAPOR RECOVERY HOSE, 3/4 INCH STANDARD DUTY HOSE, 49 RU VRS STAGE II: SUPPLY AND FIXING OF 3/4 INCH STANDARD COAXIAL HOSE OF 4 MTS LENGTH. | - | Each |
| 3 | VAPOR RECOVERY A/L | VAPOR RECOVERY A/L — VAPOR RECOVERY A/L REGULATOR, A/L REGULATOR, 49 RU VRS STAGE II: SUPPLY AND FIXING OF A/L REGULATOR. | - | Each |
| 4 | VRS BREAK AWAY | VRS BREAK AWAY — VRS BREAK AWAY, RECONNECTABLE BREAK AWAY, 49 RU VRS STAGE II: SUPPLY AND FIXING OF SITE RECONNECTABLE BREAKWAY COUPLING. | - | Each |
| 5 | VRS VACUUM PUMP | VRS VACUUM PUMP — VRS VACCUM PUMP, VANE TYPE WITH MOTOR, 49 RU VRS STAGE II: SUPPLY AND FIXING OF PESO APPROVED VANE TYPE PUMP (OR ANY OTHER COMPATIBLE VACUUM PUMP FOR CENTRALIZED VACUUM VRS SYSTEM) WITH U-BOLTS AND ANGLE BRACKET FOR MOUNTING. | - | Each |
| 6 | PRESSURE VACUUM VENTS | PRESSURE VACUUM VENTS — PRESSURE VACUUM VENTS, PV VENTS FOR CLASS A AND B, 49 RU VRS STAGE II: SUPPLY AND FIXING OF PV VENT. | - | Each |
| 7 | VRS MONITOR AND SYSTEM | VRS MONITOR AND SYSTEM — VRS MONITOR AND SYSTEM, COMPLETE ACCESSORIES, 49 RU VRS STAGE II: SUPPLY AND FIXING OF SYSTEM MONITOR ASSEMBLY WHICH INCLUDES MONITOR, VENT SENSOR, SMCB CONTROL BOX, PRESSURE SENSOR. | - | Each |
| 8 | MODIFICATION TO | MODIFICATION TO — MODIFICATION TO DISPENSER, COPPER TUBING, ADAPATORS ETC, 49 RU VRS STAGE II: MODIFICATION OF DISPENSERS LIKE MAKING THEM VAPOR READY INCLUDING FIXING OF COPPER TUBE AND CONNECTING TO THE UG VAPOUR PIPE LINE ETC. | - | Each |
| 9 | VRS COMMISSIONING | VRS COMMISSIONING — VRS COMMISSIONING, AT RETAIL OUTLETS, 49 RU VRS STAGE II: INTEGRATION COMMISSIONING AND TESTING OF THE ENTIRE VAPOUR RECOVERY SYSTEM FOR EACH RETAIL OUTLET (LS FOR 1 RO). | - | Each |
| 10 | VRS DRAIN CHECK VALVE | VRS DRAIN CHECK VALVE — VRS DRAIN CHECK VALVE, SUITABLE SIZE, 49 RU VRS STAGE II: SUPPLY AND FIXING OF DRAIN CHECK VALVE OF SUITABLE SIZE. | - | Each |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
22000298-HD-10157.pdf
TENDER_DOCUMENT • 19.91 MB
Download all tender documents and submit your bid