| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.9 CrAccepted-AOC SHANTI CENTER 03 MCCH SOCIETY V B PHADAKE MARG PANVEL RAIGAD 410206 | PANVEL | RAIGAD | MAHARASHTRA | 410206 | ₹50.9 Cr Quoted ₹53.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹58.0 CrRejected-AOC PLOT NO 46 SHIVSAMPADA MUTHACOLONY SADAR BAZAR SATARA 415001 | SATARA | MAHARASHTRA | 415001 | ₹58.0 Cr | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | - | - | Rejected-Technical PQ D not as per NIT |
| 4 | Rejected-Technical 710 SPOT 18 7TH FLOOR PIMPLE SAUDAGAR PUNE | PUNE | PUNE | MAHARASHTRA | - | - | Rejected-Technical PQ D and PQ F not as per NIT |
| Sl No | Description | Qty | Unit | P. D. Infraproject Pvt Ltd L1 | A S DESAI INFRASTRUCTURE PVT LTD L2 |
|---|---|---|---|---|---|
| 1.00Sub Estimate No. 1 Estimate Six lane road | |||||
| 1.01 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | 24,180 | Cubic Meter | 160 ₹38.7 L | 350 ₹84.6 L |
| 1.02 | Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. | 24,180 | Cubic Meter | 265 ₹64.1 L | 2,000 ₹4.8 Cr |
| 1.03 | Excavation for roadway in soft rock, including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading or stacking as directed. | 14,510 | Cubic Meter | 370 ₹53.7 L | 500 ₹72.5 L |
| 1.04 | Excavation for roadway in hard rock by wedging and chiselling or line drilling including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. | 33,840 | Cubic Meter | 2,500 ₹8.5 Cr | 2,500 ₹8.5 Cr |
| 1.05 | Conveying materials obtained from road cutting including all lifts, laying in layers of 20cm. to 30cm. breaking clods, dressing to the required lines, curves, grades and section, watering and compacting to not less than 97% of standard proctor density for a lead of 300m. to 500m. inclusive, from the site of excavation to the site of deposition as directed. | 60,000 | Cubic Meter | 300 ₹1.8 Cr | 2,000 ₹12 Cr |
| 1.06 | Providing earth work in embankment with approved materials obtained from other sources upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller with V-Sat attachment to achieve not less than 97 % of standard proctor density etc. complete ( Material obtained from Other sources) | 17,320 | Cubic Meter | 250 ₹43.3 L | 1,000 ₹1.7 Cr |
| 1.07 | Providing dry rubble stone pitching 23 cm (about 9 ) thick including all material, quarry spalls, labour etc. complete. | 1,400 | Square Meter | 560 ₹7.8 L | 1,800 ₹25.2 L |
| 1.08 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader/ Paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- Plant Mix Method and Grading - I Material | 12,070 | Cubic Meter | 3,000 ₹3.6 Cr | 2,500 ₹3.0 Cr |
| 1.09 | Wet Mix Macadam -- Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. Laying By Grader/Paver. | 9,020 | Cubic Meter | 3,000 ₹2.7 Cr | 2,800 ₹2.5 Cr |
Updated dates
Tender Value
₹51.4 Cr
EMD Value
₹25.7 L
Closing Date
24 Oct 2025, 11:00 amClosed
Executive Engineer, MIDC,Civil Division,
Office of Executive Engineer, Civil Division, MIDC Chinchwad,Pune
Talegaon Industrial Area, Ph.-II.. Construction of main connecting concrete road between Talegaon Industrial Area Ph-I and Ph-II.
2025_MIDC_1220181_1
37004
Open Tender
Civil Works
Talegaon
Please refer Tender documents.
15 documents required · 15 mandatory
₹30,680
₹25.7 L
Yes
Office of Chief Engineer, MIDC,Pune zone
14 Nov 2025
19 Sept 2025
27 Oct 2025
19 Sept 2025
24 Oct 2025
3 Oct 2025
19 Sept 2025 - 25 Sept 2025
30 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.63 MB
ItemSpecification.pdf
Other Document • 0.05 MB
TenderDocument.pdf
Tender Documents • 0.61 MB
BOQ_2106622.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid