| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.1 LAccepted-AOC GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | L1 | Accepted-AOC BID ACCEPTED DUE TO L1 | |
| 2 | L2₹55.3 L+₹1.3 L (2.32%)Rejected-AOC 819 1 GALI NO 10 PHOOLBAG COLONY MEERUT UTTAR PRADESH 251001 | MUZAFFARNAGAR | UTTAR PRADESH | 251001 | L2 | Rejected-AOC BID REJECTED DUE TO L2 | |
| 3 | L3₹56.1 L+₹2.1 L (3.85%)Rejected-Finance | L3 | Rejected-Finance REJECTED DUE TO L3 | |
| 4 | L4₹56.7 L+₹2.6 L (4.78%)Rejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | L4 | Rejected-Finance REJECTED DUE TO L4 | |
| 5 | L5₹61.9 L+₹7.8 L (14.4%)Rejected-Finance VINOD VIHAR COLONY HATHRAS | HATHRAS | UTTAR PRADESH | 202139 | L5 | Rejected-Finance REJECTED DUE TO L5 |
Tender Value
₹69 L
EMD Value
₹1.4 L
Closing Date
7 Sept 2020, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER MGCCC BULANDSHAHAR
OFFICE OF THE SUPERINTENDING ENGINEER MADHYA GANGA CANAL CONSTRUCTION CIRCLE BULANDSHAHAR
CONSTRUCTION OF V.R.B AT KM. 8.200 OF BAHJOI BRANCH
2020_UPIDC_507415_1
01/SE/2020-21
Open Tender
Civil Works - Canal
Item Rate
150 days
HASANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
EXICUTIVE ENGINEER MGCCD-14, GARHMUKTESHWAR
₹1.4 L
Yes
26 Oct 2020
2 Sept 2020
7 Sept 2020
2 Sept 2020
7 Sept 2020
2 Sept 2020
2 Sept 2020 - 7 Sept 2020
90 days
Amount
Excavation in Foundation in Ordinary soil for structure i/c all lead & reqd. lifts as per site requirement and with proper disposel of excavated earth as per directed by engineer in charge for proper completion of work
Cement Concrete in (1:3:6) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-40) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Cement Concrete in (1:2:4) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Reinforced cement concrete A 20 (1:2:4) mix with Cement Coarse Sand (F.M. Not less than 2.00), stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Reinforced Cement Concrete in (1:1:2 ) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Cement Concrete in (1:1:2) mix with Cement, Coarse Sand (F.M. Not less than 2.00), Stone Grit (A-20) including cost of all material, labour, T&P, Machanical Mixing, Curing etc complete for proper completion of work
Providing and laying Bouldar 20-40 kg wt in bed & sides with all lead and lift including cost of all material,labour and T&P etc complete for proper completion of work
Ordinary Centering & shuttering for R.C.C. work of Pier, Abutments & Parapets etc complete for proper completion of work
Centering & shuttering for special type of work for transitions etc i/c all cost of labour & T&P etc complete for proper completion of work
Ordinary Centering & shuttering for Straight portion of C.C. work etc i/c all cost of labour & T&P etc complete for proper completion of work
Cutting, bending, binding & placing in position of steel reinforcement with all wastage, carriage and including all labour material and T&P etc complete for proper completion of work
Providing and Fixing of copper settlement joint (Diamond seal) i/c cost of Material, labour T&P etc.
Providing & Laying Local sand behind abutment, transitions etc i/c all cost of labour & T&P etc complete for proper completion of work
Providing and fixing of 75 mm Dia P.V.C. Pipe including cost of all material, labour, T&P etc for proper completion of work
M-100 Brick work in 1:4, Cement Sand morter i/c cost of material Labour & T&P etc complete for proper completion of work
Dry Brick on edge pitching M-100 Bricks upto 3M hight with 60 m lead of matrial for proper completion of work
S/F 75x75x10 MM Angle Iron for settlement joint for proper completion of work
SINGHWAL INDUSTRIES
M/S JAMEEL CONTRACTOR
M/S CHAUDHARY ENTERPRISES
SUNIL KUMAR CONTRACTOR
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .