Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr | L1 | Accepted-AOC L-1 |
| 2 | L2₹1.3 Cr+₹1.0 L (0.81%)Rejected-Finance | ₹1.3 Cr+₹1.0 L (0.81%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VIJAY KUMAR SINGH L1 | M/S WAHADAR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 0.68 | Cum | 948.24 ₹642.91 Lowest | 955.89 ₹648.09 |
| 2.00 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 13.43 | Cum | 537.34 ₹7,213.79 Lowest | 541.67 ₹7,271.92 |
| 3.00 | Taking down chaukhats in Windows including stacking serviceable materials within 15M. Lead and disposal of unserviceable materials with all leads all complete ap per direction of E/I. | 3 | Nos | 136.97 ₹410.91 Lowest | 138.07 ₹414.21 |
| 4.00 | Dismantling lime terracing upto avg. 115mm depth with chisel and hammer including stacking servieable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all comlete as per direction of E/I. | 432.9 | sqm | 341.21 ₹1,47,709.81 Lowest | 343.96 ₹1,48,900.28 |
| 5.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 6.00 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 0.48 | Cum | 3,721.63 ₹1,771.5 Lowest | 3,751.64 ₹1,785.78 |
| 7.00Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | |||||
| 8.00 | Supporting work for load bearing structureISMC BOX 150 | 683.75 | KG | 84.54 ₹57,804.23 Lowest | 85.22 ₹58,269.18 |
| 9.00providing designation 75 B brickwork in C M ('1 :6 ) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing. taxes and royalty all complete as per building specification and direction of E/l. | |||||
| 10.00 | Providing designation 75 B brick work in C.M.(1:6) in superstructure. | 1.31 | Cum | 5,202.13 ₹6,804.39 Lowest | 5,244.08 ₹6,859.26 |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
5 Jun 2026, 3:00 pmClosed
E.E., BCD, Building Division, Ramgarh
E.E., BCD, Building Division, Ramgarh
Proposed setting- up District Integrated Public Health Lab at Sadar Hospital, Ramgarh
2026_BCD_114653_1
BCD/EE/RAMGARH/07/2026-27
Open Tender
Civil Works - Buildings
Works
270 days
Ramgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.6 L
4 Aug 2026
30 May 2026
8 Jun 2026
30 May 2026
5 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling plain cement or lime concrete work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 1 | Cum | - | - |
| 2 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | Cum | - | - |
| 3 | Taking down chaukhats in Windows including stacking serviceable materials within 15M. Lead and disposal of unserviceable materials with all leads all complete ap per direction of E/I. | - | Nos | - | - |
| 4 | Dismantling lime terracing upto avg. 115mm depth with chisel and hammer including stacking servieable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all comlete as per direction of E/I. | 1 | sqm | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | - | - | - | - |
| 6 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | - | Cum | - | - |
| 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | - | - | - | - |
| 8 | Supporting work for load bearing structureISMC BOX 150 | - | KG | - | - |
| 9 | providing designation 75 B brickwork in C M ('1 :6 ) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10 mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing. taxes and royalty all complete as per building specification and direction of E/l. | - | - | - | - |
| 10 | Providing designation 75 B brick work in C.M.(1:6) in superstructure. | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
F-2-IPHL.pdf
Tender Documents • 3.85 MB
BOQ_155022.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .