Loading…
Loading…
| # | Company | Offered Item | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.4 Cr Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | ₹9.4 Cr | L1 | - |
| 2 | L2₹9.7 Cr+₹36.0 L (3.83%) Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | ₹9.7 Cr+₹36.0 L (3.83%) | L2 | - |
| 3 | L3₹10.0 Cr+₹62.8 L (6.69%) Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | ₹10.0 Cr+₹62.8 L (6.69%) | L3 | - |
| 4 | L4₹10.2 Cr+₹76.3 L (8.13%) Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | ₹10.2 Cr+₹76.3 L (8.13%) | L4 | - |
| 5 | L5₹11.5 Cr+₹2.1 Cr (22.1%)Financial bid opened Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. | ₹11.5 Cr+₹2.1 Cr (22.1%) | L5 | Financial bid opened |
| Sl No | Description | Qty | Unit | A&T INFRACON PRIVATE LIMITED L5 | M/S BUILDCON INFRA L1 | Aditya Kumar L3 | SCK INFRATECH PRIVATE LIMITED L4 | Amitkumar P. Patel L2 |
|---|---|---|---|---|---|---|---|---|
| 1 | Refer Schedule of Quantities-A & B
Rs. 4,53,48,891/- (Civil Works)
Rs. 7,83,05,986/- (Electrical Works) | - | - | -7.33 ₹11,45,90,974.52 | -24.08 ₹9,38,78,782.62 Lowest | -19 ₹10,01,60,450.37 | -17.91 ₹10,15,08,288.53 | -21.17 ₹9,74,77,139.54 |
Tender Value
₹12.4 Cr
EMD Value
₹22.4 L
Closing Date
18 Apr 2024, 11:00 amClosed
EE&SM( C) -2
Executive Engineer
IITGNPD-2,CPWD, Gandhinagar
Construction of Permanent Campus of Central University of Gujarat (Phase 1, Package -VI) SH: External development works around ponds including railing, pavers, kerb stone, slope stabilization, rain water harvesting system in pond, open Gym equipments and base flooring, AV system, Fire wall etc. Subwork/Packages: Phase 1 Package 6
71943
8/SE&PD/IITGNPC/2023-24
OPEN
Civil Works - Others
NCB
9 months
Gandhinagar, Gujarat
14 documents required · 14 mandatory
₹22.4 L
office of the SE & PD, IIT Gandhinagar Project Circle, CPWD, Gandhinagar
18 Apr 2024
14 Mar 2024
18 Apr 2024
18 Apr 2024
19 Mar 2024
19 Mar 2024
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
NIT+PDF.pdf
document • 2.61 MB
01-All+Stuctural+Details+for+Waterbody.pdf
document • 0.66 MB
02-All+Stuctural+Details+for+Waterbody.pdf
document • 0.72 MB
5_WATERBODY+R2-wt+01.pdf
document • 1.09 MB
5_WATERBODY+R2-wt+02.pdf
document • 0.99 MB
5_WATERBODY+R2-wt+03.pdf
document • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .