| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-AOC KOLLAM KERALA | PATHANAMTHITTA | KERALA | 689694 | ₹2.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.8 Cr+₹5.4 L (2.00%)Rejected-Finance | ₹2.8 Cr+₹5.4 L (2.00%) | L2 | Rejected-Finance L2 |
Tender Value
₹2.5 Cr
EMD Value
₹1 L
Closing Date
18 May 2023, 3:00 pmClosed
The Superintending Engineer
O/o The Superintending Engineer, Public Health Circle, Kerala Water Authority, Thiruvananthapuram
JJM 2022 2024 Kallara Scheme Phase 3 SLSSC 3 Construction of Check Dam to the Downstream of Aruvippuram Bridge in Pullampara Grama Panchayath
2023_KWA_576304_1
175/2022-23/KWA/PHC/D3/TVM/RT1
Open Tender
Civil Works - Water Works
Item Rate
365 days
Pullampara
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,759
₹1 L
29 Sept 2023
12 May 2023
19 May 2023
12 May 2023
18 May 2023
12 May 2023
12 May 2023 - 18 May 2023
Amount
JJM 2022-2024-Kallara Sheme-Phase 3-SLSSC 3-Construction of Check Dam to the Downstream of Aruvippuram Bridge in Pullampara Grama Panchayath.
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD73/2022-2023:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work etc. complete. (Derived from Item No. 60.1.1 of Irrigation OD).
OD74/2022-2023:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete. (Derived from Item No. 60.2.2 of Irrigation OD).
OD75/2022-2023:BAILING OUT WATER BY ENGAGING COOLIE - Bailing out water by engaging coolie where ever necessary where pumping with engine and pump set not possible. (Derived from Item No. 60.2.7 of Irrigation OD)
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD70/2022-2023:DOWEL BARS - Supplying and Providing MS dowel bars of size 25 mm dia of 2.0m long (1m in rock and 1m in concrete ) including drilling holes of 30mm dia and filling the gap with cement grout( 0.50kg/each) etc complete. (Derived from Item No. 60.5.3 of Irrigation OD).
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
OD68/2022-2023:DRY PACKING FOR APRONS - Rough stone dry packing for apron with good quality blasted rubble including packing to compactness to lines levels, cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. (Derived from Item No. 60.7.4 of Irrigation OD).
OD72/2022-2023:Supplying and fixing structural steel channel ISMC 75X40mm for holding shutter planks including cutting ,hoisting fixing in position with material and labour charges etc complete. (Derived from Item No. 60.3 of Irrigation OD).
OD67/2022-2023:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete. (Derived from Item No. 60.8 of Irrigation OD).
OD71/2022-2023:Locking Arrangements - Supplying and Fixing lock and locking arrangements with suitable chain hooks,and padlock of 65mm size. (Derived from Item No. 60.4 of Irrigation OD).
OD69/2022-2023:PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. (Derived from Item No. 60.6 of Irrigation OD).
Appendix B-Construction of Side Protection Wall
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD90/2022-2023:Supplying and stacking granite stone 20 to 45 dm3 for dumping works- Supplying at site of work granite stone 20 to 45 dm3 in size (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) for measurement ( deducting not less than 15% for voids as fixed by the departmental officer at site) including all cost, conveyance, loading and unloading charges all other incidental charges all leads and lifts etc. complete as per the direction of the departmental officers at site. (Derived from Item No. 60.7.6 of Irrigation OD).
OD89/2022-2023:Conveyance and dumping of departmental granite stones-Conveyance of departmental granite stone 20 to 45 dm3 in size from stack at site and dumping in position (60% 45m3,30%30 to 40dm3 and 10% 20 to 30dm3 stones) to lines and levels to from the core of the sea wall as per approved design including all leads and lifts etc. complete as per the direction of the departmental officers at site. (Derived from Item No. 60.7.7 of Irrigation OD).
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
OD91/2022-2023:DRY PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. (Derived from Item No. 60.7.2 of Irrigation OD).
OD92/2022-2023:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site. (Derived from Item No. 60.7.1 of Irrigation OD).
7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
OD93/2022-2023:EARTH WORK FILLING- Supplying contractors own earth including cost of conveyance and royalty and filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. (Derived from item No. 60.2.1 of Irrigation OD).
Permalil Granite Constructions
Bidder Name
Sunilal
Permalil Granite Constructions
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_850949.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .