Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.7 LAccepted-AOC JANTA NAGAR PO BOKARO THERMAL DIST BOKARO JHARKHAND PIN 829107 | BOKARO | JHARKHAND | 829107 | ₹1.7 L | L-1 | Accepted-AOC L1 BIDDER |
| 2 | L-2₹2.1 LRejected-Finance PIPRATAND PS MADHUBAN KHARKHAREE DHANBAD DHANBAD 828125 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828125 | ₹2.1 L | L-2 | Rejected-Finance Reject L-2 Bidder |
| 3 | L-3₹2.1 LRejected-Finance PANCHAYAT SIJUA PAN THANA DUGDA BOKARO BOKARO 828307 JHARKHAND INDIA | DHANBAD | JHARKHAND | 828307 | ₹2.1 L | L-3 | Rejected-Finance Reject L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹2,200
Closing Date
2 Mar 2026, 6:30 pmClosed
AREA MANAGER (ENM), BARORA AREA
ENM Department, Office of the General Manager, Barora Area, Nawagarh, Dhanbad
Shifting of two domestic water supply pump motor set (MN 6) of Sahana Incline and Dhaska Patti Incline for uninterrupted domestic water supply to Sahana Colony and Dhaska Patti and nearby villages under Phularitand, AMP Colliery, Barora Area.
2026_BCCL_353349_1
BCCL/GM/AR-1/AM (ENM)/E-TENDER/2025-26/361
Open Tender
Electrical and Maintenance Works
10 days
AMP COLLIERY, BARORA AREA
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,200
9 Jun 2026
18 Feb 2026
3 Mar 2026
18 Feb 2026
2 Mar 2026
18 Feb 2026
18 Feb 2026 - 21 Feb 2026
Dismantling and withdrawal of pump set with its motor, baseplate and starter 02setx03times
Shifting of pump motor set with starter in the lower side of the sump 02setx03times
Dismantling and shifting of suction of the pump 02setx03times
Dismantling and shifting of sluice valve and N R valve 02+02=04setx03times
Installation of Pump Motor set along with suction with proper alignment including fitting of coupling belt and greasing packing of the pump 02setx03times
Fabrication & fitting of 4" dia taper Pipe
Fabrication & fitting of 4" dia Bend
Fabrication and fitting of 4" dia Short piece
Fitting of sluice valve and N R valve in delivery range after shifting 02+02=04setx03times
Providing of nut bolt & washer
Providing of rubber joint
Priming the pump and put it in operation 02setx03times
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_366137.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid