Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance 12 BUMHAMA KUPWARA KUPWARA BUMHAMA KUPWARA KUPWARA JAMMU KASHMIR 193222 | KUPWARA | JAMMU AND KASHMIR | 193222 | ₹1.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.9 L+₹1,400 (0.75%)Admitted-Fee/PreQual/Technical/Finance | ₹1.9 L+₹1,400 (0.75%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹2.0 L+₹12,000 (6.44%)Admitted-Fee/PreQual/Technical/Finance | ₹2.0 L+₹12,000 (6.44%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹3.0 L+₹1.1 L (59.9%)Admitted-Fee/PreQual/Technical/Finance | ₹3.0 L+₹1.1 L (59.9%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹3.2 L+₹1.3 L (70.0%)Admitted-Fee/PreQual/Technical/Finance | ₹3.2 L+₹1.3 L (70.0%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | IMPLA GENERAL SUPPLIERS L3 | m/s rahmiya electricals L5 | DAR ELECTRICALS L4 | KHAN AND SONS L1 | WAZA ELECTRICALS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 Kva 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Al. wound upto 200kVA , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer)) | 1 | No. | 1,80,000 ₹1,80,000 | 2,90,000 ₹2,90,000 | 2,50,000 ₹2,50,000 | 1,75,000 ₹1,75,000 | 1,70,000 ₹1,70,000 Lowest |
| 2.00 | Supply , Transportation and laying of 185mm² (2Ckt for 200kVA) XLPE Insulated Stranded Conductor FRLS type | 44 | No. | 400 ₹17,600 | 600 ₹26,400 | 1,000 ₹44,000 | 250 ₹11,000 Lowest | 400 ₹17,600 |
| 3.00 | Supply, Transportation and fixing of PG Clamps | 4 | No. | 200 ₹800 | 100 ₹400 | 1,000 ₹4,000 | 100 ₹400 | 50 ₹200 Lowest |
Tender Value
₹2.1 L
EMD Value
₹4,300
Closing Date
24 Aug 2026, 2:00 pmClosed
Assistant executive Engineer KPDCL Tangmarg
KPDCL Tangmarg
Augmentation of 63Kva Tranformer by 100 Kva Transformer at Chek Kharnipora under Augmentations of Sub Stations for critically overloaded DTS for winter preparedness 2026-27
2026_PDD_320114_3
E-NIT No.SSDT/21 of 2026-27 dated 08.08.2026
Open Tender
Electrical Works
Turn-key
30 days
Cheki Kharnipora
Please refer Tender documents.
4 documents required · 4 mandatory
₹215
Treasury Officer
₹4,300
27 Aug 2026
8 Aug 2026
25 Aug 2026
8 Aug 2026
24 Aug 2026
9 Aug 2026
8 Aug 2026 - 9 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 Kva 11/0.433kV, 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2, (Al. wound upto 200kVA , and with LV Cable Box having detachable Al. Gland plate with LV Bimetallic terminal connection suitable for vertical take off of cable. ( X-mer without OCTC (Off Ckt Tap Changer)) | 1 | No. | - | - |
| 2 | Supply , Transportation and laying of 185mm² (2Ckt for 200kVA) XLPE Insulated Stranded Conductor FRLS type | 44 | No. | - | - |
| 3 | Supply, Transportation and fixing of PG Clamps | 4 | No. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Tendernotice_2.pdf
PDF • 18.30 MB
BOQ_1062678.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .