Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 00 MUKUNDPUR PAHO DOMANPUR MUKUNDPUR PAHO MIRZAPUR UTTAR PRADESH 231306 | MIRZAPUR | UTTAR PRADESH | 231306 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance AT ARGADA DISTT RAMGARH JHARKHAND | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance GROUND FLOOR S O BISHUN SAO LALYO CHOWK LALYO RAMGARH JHARKHAND | LALYO | RAMGARH | JHARKHAND | 825325 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance 271 CIVIL LINE GURUGRAM GURUGRAM GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹4.4 L
EMD Value
₹5,600
Closing Date
13 Mar 2023, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Engineer (EnM),Urimari OCP
Office of The Project Engineer (EnM),Urimari OCP, Barka sayal Area, Pin 825311
Online Oil filtration and repairing/maintenance of 2 no 3 MVA, 11KV/3.3KV Power Transformer and 1 no 630KVA, 3.3KV/440V Distribution Transformer at 11KV Substation under Urimari OCP.
2023_CCL_273807_1
PE(EnM)/Urimari/e Tender/22-23/113 Dated04/03/2023
Open Tender
Electrical and Maintenance Works
Item Wise
20 days
Urimari OCP
As per NIT
2 documents required · 2 mandatory
₹5,600
14 Mar 2023
4 Mar 2023
14 Mar 2023
6 Mar 2023
13 Mar 2023
6 Mar 2023
6 Mar 2023 - 11 Mar 2023
Amount
(A. 3 MVA ,11KV/3.3KV Power Transformer, Make A/Y, Si. No. 11487 of 11KV Substation) Filtration of Transformer Oil
Cost of Breather with Silica gel
Cost of LT Bushing Insulator with stud
Cost of HT Bushing insulator with stud
Cost of Auxiliary contactor
Cost of 2.5 sqmm 4 core cable
Cost of Hooter
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost(Si. No. 2 to 8)
(B. 3 MVA ,11KV/3.3KV Power Transformer, Make A/Y, Si. No. 11487 of 11KV Substation) Filtration of Transformer Oil
Cost of Breather with Silica gel
Cost of LT Bushing Insulator with stud
Cost of HT Bushing insulator with stud
Cost of Buchholz relay
Cost of 2.5 sqmm 4 core cable
Cost of Hooter
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost(Si. No. 2 to 8)
(C. 630 KVA , 3.3KV/440V Distribution Transformer) Filtration of Transformer Oil
Cost of Breather with Silica gel
Cost of LT Bushing Insulator with stud
Cost of HT Bushing insulator with stud
Cost of Gasket
Complete painting and cleaning of transformer
Labour cost(Si. No. 2 to 8)
Profit(10% of A+B+C)
Total impact of GST for the purpose of CTC
M/S ADITYA ENTERPRISES
MOHANLAL SAO
Maa Katyayani Enterprises
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .