Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.1 LAdmitted-Finance | -33.10% | ₹7.1 L | L1 | Admitted-Finance |
| 2 | L2₹8.9 LAdmitted-Finance | -15.90% | ₹8.9 L | L2 | Admitted-Finance |
| 3 | L3₹9.9 LAdmitted-Finance | -6.10% | ₹9.9 L | L3 | Admitted-Finance |
| 4 | L4₹10.2 LAdmitted-Finance | -3.99% | ₹10.2 L | L4 | Admitted-Finance |
| 5 | L5₹10.3 LAdmitted-Finance FATEHPUR FATEHPUR FATEHPUR RAJAURI JAMMU KASHMIR 185131 UDYAM JK 16 0002445 01BHJPC7944N1Z5 B R M | RAJOURI | JAMMU AND KASHMIR | 185131 | -3.00% | ₹10.3 L | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹21,160
Closing Date
27 Feb 2026, 4:00 pmClosed
Executive Engineer. JPDCL, ED, Rajouri
Executive Engineer. JPDCL, ED, Rajouri
EDR/96 OF 2025-26 Dated 20-02-2026
2026_PDD_303956_1
EDR/96 OF 2025-26 DATED 20-02-2026
Open Tender
Electrical Works
20 days
RAJOURI
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Executive Engineer, JPDCL, ED, Rajouri
₹21,160
6 Mar 2026
20 Feb 2026
28 Feb 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: EXECUTIVE ENGINEER, ELECTRIC DIVISION, JPDCL, RAJOURI
Name of Work: 1.Creation of 25KVA S/stn along with HT/LT network at SOKKAR Under CDF Grants . 2.Creation of 25KVA S/stn along with HT/LT network at TOOND GAKHROTE Under CDF Grants. 3. Creation of 25KVA S/stn along with HT/LT network at MANOORGALLA MARKET Under CDF Grants . (All the items should be as per latest specifications and drawing adopted/Approved by Department)
e-NIT No: EDR/ 96 of 2025-26 Dated 20-02-2026
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description * Bidders are requested to quote the rates for all items which must be inclusive of Supply, Erection, Testing and commissioning of all items including Taxes, Labour charges, Overhead Charges etc. ** Before quoting the rates bidders are requested to visit the site *** Material should be in accordance to latest IS and IEC Standards Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
2 1. Creation of 25KVA S/stn along with HT/LT network at SOKKAR Under CDF Grants .
3 SITC OF HT Line
4 S.T Pole 8 mtrs long (410-SP15) 1 No Excess(+) Full Conversion INR
5 Galvanisied V cross-arm with top bracket including clamp item5 20 KG Excess(+) Full Conversion INR
6 Galvanisied channel cross-arm with including clamps and braces. item6 10 KG Excess(+) Full Conversion INR
7 30 mm2 ACSR Weasel Conductor item7 0.25 Kms Excess(+) Full Conversion INR
8 11 kv Pin insulators with pins (10KN) item8 3 No Excess(+) Full Conversion INR
9 11 kv Disc insulators with fittings (45 KN) item9 No Excess(+) Full Conversion INR
10 Al. Painting item10 1 ltrs. Excess(+) Full Conversion INR
11 Red Oxide item11 1 ltrs. Excess(+) Full Conversion INR
12 Anti Climbing Device with clamps item12 1 No. Excess(+) Full Conversion INR
13 Danger Plates with Clamps item13 1 No Excess(+) Full Conversion INR
14 Galvansied Nuts and Bolts of sorts item14 3 Kg Excess(+) Full Conversion INR
15 SITC OF SUB STATION
16 25KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR
17 S.T Pole 8 mtrs long (410-SP15) item17 No Excess(+) Full Conversion INR
18 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item18 Set Excess(+) Full Conversion INR
19 11 KV Horn Gap Set, 3 Phase, 200 Amp item19 Set Excess(+) Full Conversion INR
20 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item20 Kg Excess(+) Full Conversion INR
21 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item21 No Excess(+) Full Conversion INR
22 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 185 mm sq with Thimbles item22 Mtr Excess(+) Full Conversion INR
23 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item23 No Excess(+) Full Conversion INR
24 11 kv Pin insulators with pins (10KN) item24 No Excess(+) Full Conversion INR
25 11 kv Disc insulators with fittings (45 KN) item25 No Excess(+) Full Conversion INR
26 Nuts and Bolts of sorts item26 Kg Excess(+) Full Conversion INR
27 Al. Painting item27 ltrs. Excess(+) Full Conversion INR
28 Red Oxide item28 ltrs. Excess(+) Full Conversion INR
29 Sundry Items/POL item29 LS Excess(+) Full Conversion INR
30 SITC OF LT Line
31 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR
32 30 mm2 ACSR Weasel Conductor item32 0.5 Kms Excess(+) Full Conversion INR
33 Shakle Insulator (16KN) item33 Nos Excess(+) Full Conversion INR
34 Mukky Clamps item34 Nos. Excess(+) Full Conversion INR
35 Red Oxide item35 ltrs. Excess(+) Full Conversion INR
36 Al. Painting item36 ltrs. Excess(+) Full Conversion INR
37 Danger Plate item37 No. Excess(+) Full Conversion INR
38 Nuts and Bolts of sorts item38 Kgs Excess(+) Full Conversion INR
39 2.Creation of 25KVA S/stn along with HT/LT network at TOOND GAKHROTE Under CDF Grants .
40 SITC OF HT Line
41 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR
42 Galvanisied V cross-arm with top bracket including clamp item42 20 KG Excess(+) Full Conversion INR
43 Galvanisied Channel cross-arm including clamps and braces item43 KG Excess(+) Full Conversion INR
44 30 mm2 ACSR Weasel Conductor item44 Kms Excess(+) Full Conversion INR
45 11 kv Pin insulators with pins (10KN) item45 No Excess(+) Full Conversion INR
46 11 kv Disc insulators with fittings (45 KN) item46 No Excess(+) Full Conversion INR
47 Al. Painting item47 ltrs. Excess(+) Full Conversion INR
48 Red Oxide item48 ltrs. Excess(+) Full Conversion INR
49 Anti Climbing Device with clamps item49 No. Excess(+) Full Conversion INR
50 Danger Plates with Clamps item50 No Excess(+) Full Conversion INR
51 Galvansied Nuts and Bolts of sorts item51 Kg Excess(+) Full Conversion INR
52 SITC OF SUB STATION
53 25KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR
54 S.T Pole 8 mtrs long (410-SP15) item54 No Excess(+) Full Conversion INR
55 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item55 Set Excess(+) Full Conversion INR
56 11 KV Horn Gap Set, 3 Phase, 200 Amp item56 Set Excess(+) Full Conversion INR
57 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item57 Kg Excess(+) Full Conversion INR
58 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item58 No Excess(+) Full Conversion INR
59 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 185 mm sq with Thimbles item59 Mtr Excess(+) Full Conversion INR
60 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item60 No Excess(+) Full Conversion INR
61 11 kv Pin insulators with pins (10KN) item61 No Excess(+) Full Conversion INR
62 11 kv Disc insulators with fittings (45 KN) item62 No Excess(+) Full Conversion INR
63 Nuts and Bolts of sorts item63 Kg Excess(+) Full Conversion INR
64 Al. Painting item64 ltrs. Excess(+) Full Conversion INR
65 Red Oxide item65 ltrs. Excess(+) Full Conversion INR
66 Sundry Items/POL item66 LS Excess(+) Full Conversion INR
67 SITC OF LT Line
68 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR
69 30 mm2 ACSR Weasel Conductor item69 0.4 Kms Excess(+) Full Conversion INR
70 Shakle Insulator (16KN) item70 Nos Excess(+) Full Conversion INR
71 Mukky Clamps item71 Nos. Excess(+) Full Conversion INR
72 Red Oxide item72 ltrs. Excess(+) Full Conversion INR
73 Al. Painting item73 ltrs. Excess(+) Full Conversion INR
74 Danger Plate item74 No. Excess(+) Full Conversion INR
75 Nuts and Bolts of sorts item75 Kgs Excess(+) Full Conversion INR
76 3. Creation of 25KVA S/stn along with HT/LT network at MANOORGALLA MARKET Under CDF Grants .
77 SITC OF HT Line
78 S.T Pole 8 mtrs long (410-SP15) item78 No Excess(+) Full Conversion INR
79 Galvanisied V cross-arm with top bracket including clamp item79 20 KG Excess(+) Full Conversion INR
80 Galvanisied Channel cross-arm including clamps and braces item80 KG Excess(+) Full Conversion INR
81 30 mm2 ACSR Weasel Conductor Kms Excess(+) Full Conversion INR
82 11 kv Pin insulators with pins (10KN) item82 No Excess(+) Full Conversion INR
83 11 kv Disc insulators with fittings (45 KN) item83 No Excess(+) Full Conversion INR
84 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item84 No Excess(+) Full Conversion INR
85 Al. Painting item85 ltrs. Excess(+) Full Conversion INR
86 Red Oxide item86 ltrs. Excess(+) Full Conversion INR
87 Anti Climbing Device with clamps item87 No. Excess(+) Full Conversion INR
88 Danger Plates with Clamps item88 No Excess(+) Full Conversion INR
89 Galvansied Nuts and Bolts of sorts item89 Kg Excess(+) Full Conversion INR
90 SITC OF SUB STATION
91 25KVA Transformer Level II , 11/0.433KV,3-Phase Distribution Transformer with Bimetallic Terminal Connectors ,Aluminium Wound and with LV Cable Box having detachable Aluminium Gland plate. No Excess(+) Full Conversion INR
92 S.T Pole 8 mtrs long (410-SP15) item92 No Excess(+) Full Conversion INR
93 Surge Arrester Station Type 9KV, 10 kA (Polymer Type) item93 Set Excess(+) Full Conversion INR
94 11 KV Horn Gap Set, 3 Phase, 200 Amp item94 Set Excess(+) Full Conversion INR
95 Channel/Flate/Angle in shape of fabricated X-arms, Top bracket, Angle braces, clamps etc. item95 Kg Excess(+) Full Conversion INR
96 GI Stay sets complete with 50*8mm stay clamp ,guy insulator(2 nos.),anchor plate(200*200*6mm),nut-bolts,turn -buckles(2 nos.),1.8m long,16mm diameter solid GS stay rod and 7/3.15 mm dia GI stranded wire complete. item96 No Excess(+) Full Conversion INR
97 PVC insulated stranded conductor FRLS type 1.1kv Grade Cable 185 mm sq with Thimbles item97 Mtr Excess(+) Full Conversion INR
98 Earthing of Sub-station ,excavation of earth pit of dia 650mm and depth 3000mm,installation of earthing pipe of 40mm nominal bore and 4mm wall thickness and length 2.5 mtr.long as per IS 1239.GI strip for neutrl earthing of size 25 mm*3 mm for connection of transformer body ,G.O set and lightening arrestor as per IS 2629/85,GI nuts and bolts ,refilled with earth enhancement materials and earth chamber made of brick masonary with RCC slab cover. (Specification as per cost data) item98 No Excess(+) Full Conversion INR
99 11 kv Pin insulators with pins (10KN) item99 No Excess(+) Full Conversion INR
100 11 kv Disc insulators with fittings (45 KN) item100 No Excess(+) Full Conversion INR
101 Nuts and Bolts of sorts item101 Kg Excess(+) Full Conversion INR
102 Al. Painting item102 ltrs. Excess(+) Full Conversion INR
103 Red Oxide item103 ltrs. Excess(+) Full Conversion INR
104 Sundry Items/POL item104 LS Excess(+) Full Conversion INR
105 SITC OF LT Line
106 S.T Pole 8 mtrs long (410-SP15) No Excess(+) Full Conversion INR
107 30 mm2 ACSR Weasel Conductor item107 0.6 Kms Excess(+) Full Conversion INR
108 Shakle Insulator (16KN) item108 Nos Excess(+) Full Conversion INR
109 Mukky Clamps item109 Nos. Excess(+) Full Conversion INR
110 Red Oxide item110 ltrs. Excess(+) Full Conversion INR
111 Al. Painting item111 ltrs. Excess(+) Full Conversion INR
112 Danger Plate item112 No. Excess(+) Full Conversion INR
113 Nuts and Bolts of sorts item113 Kgs Excess(+) Full Conversion INR
115 Providing of computriised single diagram of the complete work depicting all vital items including landmark (size of sheet 24X24 inch) item1.55 no Excess(+) Full Conversion INR
116 Providing of geo tagged coloured photographs of all the vital items of the work including name plate of Transformer(size of photograph 4X6 inch) item1.56 no Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
techsummary_987191.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
SBD.pdf
Tender Documents • 1.61 MB
BOQ_987191.xls
BOQ • 0.47 MB
Download all tender documents and submit your bid