Loading…
Loading…
Tender Value
₹30.1 L
EMD Value
₹30,200
Closing Date
22 Apr 2026, 3:30 pmClosed
EE OFFICE- TIRUPATHI
Tirupathi
Improvements to Riding surface from km.1/8 to 4/8 of NH 205 to Railway feeder road via Redddypalli, Nagaiahgaripalli(B) Road from km.3/530 to 4/0 of Chandragiri railway feedr in Tirupati District
923803
NIT No.88(2nd call)/ EE/R&B/TPT/2025-26, Dated:.07.04.2026
OPEN - NCB
Road Work
TIRUPATHI
10 documents required · 9 mandatory · 1 optional
₹1,066
₹30,200
15 Apr 2026
15 Apr 2026
15 Apr 2026
Scarifying the existing B.T surface to a depth of 50 mm by Mechanical means and disposal of scarified material with all leads and lifts upto 1000 Mtrs as per MoRT&H (5th Revision) Specn. No.305.4.3
Removal of unserviceable soils upto SDR including excavation, loading and disposal upto 1000 mts etc., complete for finished item of work as per MoRT&H specification 301(5th Revision) and as directed by the Engineer-in-Charge
Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix macadem specification ( 5th Revision) as per Table 400-13, including cost of all materials and including premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site , laying in uniform layers with paver in base courses on well prepared surface and compacting with Vibratory roller to acheive the desired density etc., as directed by the Engineer-in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work. Total Rs.
Providing and applying prime coat with bitumen emulsion (SS1) Bulk using emulsion pressure distributor on prepared surface of granular base including clearing of road surface and spraying emulsion at the rate of 0.70 kg/sqm using emulsion pressure distributor for finished item of work etc., complete as per MoRT&H Specification 502 (5th revision) and as directed by the Engineer-in-charge
Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.25 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
Providing and applying tack coat with bitumen VG-10 (Bulk) using Bitumen pressure distributor at the rate of 0.20 kgs per sqm on the prepared Granular surface treated with primer cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (5th revision) and as directed by the Engineer-in-Charge.
Providing and laying of 30 mm thick Bituminous Concrete with 100 - 120 TPH batch type hot mix plant producing an average output of 75 tones per hour using hard blasted granite crushed aggregates of Grading – II as per Table 500-17 of specification 507 of MoRT&H (5th revision), premixed with Bituminous binder of VG 30 Grade @ 5.4 % of mix and filler, transporting the hot mix to work site, laying with hydrostatic sensor paver finisher to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all respects as directed by Engineer-in-Charge
Forming earthen shoulders with selective soils obtained from side earth having MDD of not less than 1.75 gms/cc by mechnical means with all leads and lifts including pre-watering of soil at borrow area, removal of top soil, excavation of soils at borrowed area, conveyance of soil, depositing the soils on the embankment, spreading soils, breaking clods, sectioning and consolidation with vibratory road roller @ OMC to meet requirement of table 300-2 of MORT&H including all hire and operational charges of T&P , complete for finished item of work as per MORT&H specification 305 (5th revision) (Payment will be made based on levels for finished item of work)
Dumping and filling with 450mm to 600mm size Boulders of O.G. variety including cost and conveyance from approved sources to site of work and stacking at road side to departmental gauge for premeasurements and laying in position, etc., complete as directeed during execution
Dumping and filling with 150mm soling stone including cost and conveyance from approved sources to site of work and stacking at road side to departmental gauge for premeasurements and laying in position, etc., complete as directed during execution
Laying sand bags in the stipuiated places including cost of empty cement bag, sand thread, stitching charge and labour charges
Collection and supply of good gravel and spreading irrespective of thickness of approved quality including cost and conveyance, seigniorage and stacking to departmental gauge for premeasurements etc., complete.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTS 88.doc
TENDER_DOCUMENT • 0.34 MB
NIT-88.xls
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid