Loading…
Loading…
Tender Value
₹26.1 Cr
EMD Value
₹52.3 L
Closing Date
27 Jun 2026, 1:00 pmClosed
Zonal Manager
PLOT NO. 56/1 LANE C-11, TURNER ROAD, DEHRADUN (UTTARAKHAND)
L027NH 507 to jarda Chhuri Tera to Naryunka MR
2026_CCUK_148265_1
UT134821
National Competitive Bid
Civil Works - Roads
Item Rate
540 days
UTTARKASHI
As per technical bid
3 documents required · 3 mandatory
₹5,900
₹52.3 L
DEHRADUN
3 Jul 2026
11 Jun 2026
27 Jun 2026
11 Jun 2026
27 Jun 2026
11 Jun 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Laying and Jointing PVC Pipe. Heading | - | - | - | - |
| 1 | Excavation in Hill Side Cutting for Construction in all types of Soils, Rocks and E&B ect. As met at site, true to lines as per Pland, L-Section, Cross Slope, Super Elevation as required, also including uprooting & cutting of bushes, dressing of road surface to the required level and slopes with all Lifts & Leads required as per Drawings by mechanical means or manual means without otherwise damaging the Forest, Forest Land, Utilities, Private and Public Properties, completion of the work. | - | L.S. One Job | 1,39,75,920 | - |
| 2 | Disposal of exvacated material obtained from hill side cutting including loading and disposal up to 1000 M lead as directed by Engineer-in-charge and as per MORD specifications Clause. | - | Cum | 53.1 | - |
| 3 | Removal of Slip Clearence considered only those reaches where the Hill side cutting has been completed and handed over to Engineer -In- Charge in all type of soil and rock by mechanical means or manual means and disposal of safe side only in after completion of hill side cutting as per road design as directed by Engineer-in-charge and MORD specifications. | 1 | Cum | 68.9 | ₹68.83 |
| 4 | Excavation in Foundation for structures in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge. | 1 | Cum | 438.6 | ₹438.16 |
| 5 | Excavation in Structures By Mechnical Means in all types of soils and rocks including lead, lift and disposal of surplus material as directed by Engineer-in-charge and MORD. | - | Cum | 219.6 | - |
| 6 | Construction of R.R. Stone Masonary in cement mortar 1:5 including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | - | Cum | 4,757.39 | - |
| 7 | Random Rubble Stone Masonry Laid Dry for structures by locally available approved stone ncluding supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | - | Cum | 2,376.3 | - |
| 8 | Cement Plum Masonry with 40% plum & 60% 1:3:6 cement concrete including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | - | Cum | 4,783.6 | - |
| 9 | HP Stone Filling in back of structures including supply of all materials, labour, t&p & royalty etc, required for proper completion of work as directed by Engineer-in-charge and MORD specifications. | - | Cum | 1,087.5 | - |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.34 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.00 MB
sbdjarda.pdf
Tender Documents • 5.12 MB
BOQ_232145.xls
BOQ • 0.36 MB
ut134821plan.pdf
Additional Documents • 8.32 MB
datecorrigendum.pdf
PDF • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .