Closing Date
1 Oct 2020, 12:00 pmClosed
Executive Engineer, Electric Division Vijaypur
EXECUTIVE ENGINEER, ELECTRIC DIVISION VIJAYPUR JPDCL JAMMU
IMPROVEMENT ERECTION OF HT LT NETWORK CREATION AUGMENTATIONS OF SUB STATIONS OF VARIOUS CAPACITIES INCLUDING MAINTENANCE EMERGENT WORKS OF DISTRIBUTION NETWORK UNDER JURISDICTION OF ELECTRIC DIVISION VIJAYPUR JPDCL JAMMU
2020_PDD_103677_1
EDV/04 OF 2020-2021 dated 5-9-2020
Open Tender
Electrical Works
Item Wise
365 days
ELECTRIC DIVISION VIJAYPUR JPDCL JAMMU
AS PER SBD
5 documents required · 5 mandatory
₹1,000
Executive Engineer, Electric Division Vijaypur( Sa
₹50,000
2 Nov 2020
5 Sept 2020
5 Oct 2020
5 Sept 2020
1 Oct 2020
5 Sept 2020
Loading of Poles
PCC Pole (7.50m - 8.0m) Long
PCC Pole (9.00m - 10.0m) Long
PCC Pole above 10Mtr.
ST Pole (7.5 m- 8.0m) Long
ST Pole (9.0m - 10.0m) Long
ST Pole above 10Mtr.
Unloading of pole at road side and its carriage upto 25 Mtr.
ST Pole (7.5 m- 8.0m) Long
ST Pole (9.0m - 10.0m) Long
ST Pole (Above 10.0m) Long
Dragging/ Manual carriage of pole to site of work upto first 100 Mtr.
PCC Pole (7.50m - 8.0m) Long
PCC Pole (9.0 m- 10.0 m) Long
PCC Pole (Above 10.0 m) Long
ST Pole (7.5 m- 8.0m) Long
ST Pole (9.0m - 10.0m) Long
ST Pole (Above 10.0m) Long
Dragging/ Manual carriage of pole to site of work for every subsiquent 50 Mtr.
PCC Pole (7.50m - 8.0m) Long
PCC Pole (9.0 m- 10.0 m) Long
PCC Pole (Above 10.0 m) Long
ST Pole (7.5 m- 8.0m) Long
ST Pole (9.0m - 10.0m) Long
ST Pole (Above 10.0m) Long
Loading of line material.
A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog
M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire
Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set
Unloading and manual carriage of line material upto 25 Mtr.
A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog
M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire
Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set
Manual carriage of line material to site of work beyond 25 Mtr. for first 100 Mtr .
Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set
Carriage of line material manually to site of work for every additional 50 Mtr or part thereof.
A.C.S.R conductor Squirrel /Weasel /Rabbit /Dog
M.S channel/Angle/Flat/Nuts & Bolts/Guy wire/G.I wire
Polymer/Porcelain items/ Insulator/Disc/Shackle/G.O Set/Link Set/D.O Set
Erection of pole with X-arm/U-Clamp ( with plantation depth equal ot 1/6th of the pole length) for HT/LT including pit excavation in all soil as per REC Standards ammended upto date.
PCC Pole 7.5 Mtr. Long
PCC Pole 8 Mtr. Long
PCC Pole 9 Mtr. Long and above (Add 10% to the corresponding rate for increase in length of pole by every one metre or part thereof )
ST Pole 7.5 Mtr. Long
Straightening of tilted pole
PCC Pole 7.5 Mtr. Long
PCC Pole 8 Mtr. Long
PCC Pole 9 Mtr. Long and above (Add 10% to the corresponding rate for increase in length of pole by every one metre or part thereof )
ST Pole 7.5 Mtr. Long
ST Pole 8 Mtr. Long
ST Pole 9 Mtr. Long and above (Add 10% to the corresponding rate for increase in length of pole by every one metre or part thereof )
Re-erection of uprootred Poles
PCC Pole 7.5 Mtr. Long
PCC Pole 8 Mtr. Long
PCC Pole 9 Mtr. Long and above (Add 10% to the corresponding rate for increase in length of pole by every one metre or part thereof )
ST Pole 7.5 Mtr. Long
ST Pole 8 Mtr. Long
ST Pole 9 Mtr. Long and above (Add 10% to the corresponding rate for increase in length of pole by every one metre or part thereof )
Re-stringing/Tightening of snapped /loose conductor
A.C.S.R conductor up to 0.05mm² (Squirrel / Weasel / Rabbit)
A.C.S.R conductor 0.10mm² (Dog)
Dismentling of overheated/Damaged/ worn out Conductor.
A.C.S.R conductor 0.10mm² (Dog)
Erection of guy rod complete
LT Line
HT Line
Dismentling of Existing/ broken/under size pole for replacement/Re-alingment.
PCC Pole 7.5 Mtr. Long
PCC Pole 8 Mtr. Long
PCC Pole 9 Mtr. Long and above
ST Pole 7.5 Mtr. Long
ST Pole 8 Mtr. Long
Fixing of Jumper sets
HT Line
LT Line
Laying and stringing of overhead LT/11 KV PVC/XLPE Insulated cable with messanger wire single core
Upto 35mm²
Above 35mm² upto and including 70mm²
Above 70mm² upto and including 120mm²
Above 120mm²
Dismentalling and roll back of overhead LT/11 KV PVC/XLPE Insulated cable with messanger wire single core
Upto 35mm²
Above 35mm² upto and including 70mm²
Above 70mm² upto and including 120mm²
Above 120mm²
Survey, Route alignment
HT Line
LT Line
Branch Cutting
Route clearance for corridor of 5 Mtr.
Fixing of pre fabricated bracket and cross arm bed for placement of Transformer
Making and fixing of cradle guard of 8 SWG GI wire comprising of a minimum of 10 nos. Of cross pieces per span including connection to earth on both ends
Installation/ Erection of equipments
L.A Set
D.O Set
Link Set
G.O Set
H.G Set
Dismantling of equipments
L.A Set
D.O Set
Link Set
G.O Set
H.G Set
Iron work such as fabrication of steel work.
Drilling of holes
Loading of 11/0.4 KV Distribution transformer
Unloading of 11/0.4 KV Distribution transformer
Dragging of 11/0.4 KV Distribution transformer upto first 50 Mtr.
Dragging of 11/0.4 KV Distribution transformer for every subsequent 10 Mtr.
Mounting of Transformer on X-arm bed including HV and Earth connections.
Upto and including 25 KVA
Above 25 KVA upto and including 100 KVA
Above 100 KVA upto and including 250 KVA
Mounting of Transformer on plateform including HV and Earth connections.
300 KVA and 400 KVA
500 KVA and 630 KVA
UnMounting of Transformer on X-arm bed including HV and Earth connections.
Upto and including 25 KVA
Above 25 KVA upto and including 100 KVA
Above 100 KVA upto and including 250 KVA
Unmounting of Transformer on plateform including HV and Earth connections.
300 KVA and 400 KVA
500 KVA and 630 KVA
Erection/ Installation of LT Cable circuit complete job.
Upto and including 25 KVA
Above 25 KVA upto and including 100 KVA
Above 100 KVA upto and including 630 KVA
Dismentling of LT Cable circuit complete job.
Upto and including 25 KVA
Above 25 KVA upto and including 100 KVA
Above 100 KVA upto and including 630 KVA
Crimping of thimbles
25mm2 upto 70mm2
Above 70mm2 to 185mm2
Above 185mm2
Erection/ Installation of MCCB complete job
Fixing of service line.
Single phase upto 10 Mtr.
Single phase from11 Mtr. to 20 Mtr.per meter.
Single phase from 21 Mtr. to 30 Mtr.per meter.
Opening of service line and re-connection
Laying and stringing of overhead LT/11 KV PVC/XLPE Insulated cable with messanger wire for 3 or 3 1/2 core
Upto 35mm²
Above 35mm² upto and including 70mm²
Above 70mm² upto and including 120mm²
Above 120mm²
Dismantling and rolling back of overhead LT/11 KV PVC/XLPE Insulated cable with messanger wire for 3 or 3 1/2 core
Upto 35mm²
Above 35mm² upto and including 70mm²
Above 70mm² upto and including 120mm²
Above 120mm²
Ward & watch Of material
Installation of CT/PT Unit alongwith Meter (Complete job)
Cable end termination using epoxy kit including peeling of cable and fixing of proper size thimbles and earthing of cable set of 3 or 31/2 core for LT cables
25 to 95 sqmm
Above 95 upto and including 300 sqmm cable
Above 300 Sqmm cable upto and including 630 Sqmm
Cable end terminationusing epoxy kit including peeling of cable and fixing of proper size thimblesand earthing of cable set of 3 or 31/2 core for HT cables
25 to 95 sqmm
Above 95 upto and including 300 sqmm cable
Above 300 Sqmm cable upto and including 630 Sqmm
Cable end terminationusing epoxy kit including peeling of cable and fixing of proper size thimbles and earthing of cable single core for LT cables
25 to 95 sqmm
Above 95 upto and including 300 sqmm cable
Above 300 Sqmm cable upto and including 630 Sqmm
Cable end terminationusing epoxy kit including peeling of cable and fixing of proper size thimbles Single core for HT cables
25 to 95 sqmm
Above 95 upto and including 300 sqmm cable
Above 300 Sqmm cable upto and including 630 Sqmm
Cable end terminationusing epoxy kit including peeling of cable and fixing of proper size thimbles single or multi core for straight through joints of LT cables
25 to 95 sqmm
Above 95 upto and including 300 sqmm cable
Above 300 Sqmm cable upto and including 630 Sqmm
Cable end terminationusing epoxy kit including peeling of cable and fixing of proper size thimbles Single or multi core for straight through joints of HT cables
25 to 95 sqmm
Above 95 upto and including 300 sqmm cable
Above 300 Sqmm cable upto and including 630 Sqmm
Cement Bottoming of ST Poles of 0.5 Cum along with construction & allied material
Providing Earthing
With a spiral made of 115 turnes of 8 SWG Wire placed 1.5 m below the ground level including excavation of pit, refilling the same in Soft soil.
Rod type where a 20mm thic 2.3 m long GI rod is driven from 200 mm below the ground level
40mmdia GI pipe/30 mm thick rod 2.3 m long to be placed 200 mm below the ground level including excavation of pit 2.5 m deep refilling the same in hard soil
Earthing in soft/hard soil using the pole pit with spiral/pipe/plate
Construction of Platform of size 8X6X6 feet along with Chain Link Fencing of Grid 1"X1" (Material to be provided by Contractor)
Loading of CT/PT unit
Unloading of CT/PT Unit
Average carriage of CT/PT Unit upto 100 Mtr
Average carriage of CT/PT Unit Above 100 Mtr
Erection of CT/PT Unit along with Trivector Meter
Erection of CT/PT Unit
Painting Of ST poles
Painting of Cross Arm & Back Clamps
Fixing of new fixtures
straight cross arm upto and including 3'
straight cross arm above 3'upto and including 6'
straight cross arm above 6'upto and including 10'
V Cross arm for 11 KV
Fixing of Braces
Fixing of Shackle insulator
Disc Insulator with Fitting
Fixing Top clamp for pin insulator /PG Clamp
Fixing of U/D Clamp for shackle Insulator
Fixing of Danger Plates
Fixing of anti Climbing devices consisiting of 12 turns of barbed wire equally spaced over a length of 1 metre of the pole from 2 metre above the grounglevel including clamping at both ends
Dismantling of fixtures
straight cross arm upto and including 3'
straight cross arm above 3'upto and including 6'
straight cross arm above 6'upto and including 10'
V Cross arm for 11 KV
Braces
Shackle insulator
Pin insulator with Pin (porcelain or polymer)
Disc Insulator with Fitting
Top clamp for pin insulator /PG Clamp
U/D Clamp for shackle Insulator
Danger Plates
Anti Climbing devices consisiting of 12 turns of barbed wire equally spaced over a length of 1 metre of the pole from 2 metre above the grounglevel including clamping at both ends
Fixing of Street light along with GI pipe Bracket including wiring
Replacement of Street light along with GI pipe Bracket including wiring
Installation of meter board/meter box including MCB/main switch
Installation of meter Single phase
Installation of meter Three phase without CT
Installation of meter Three phase with CT
Sealing of Metres ( body /TCP seal) using lead seals and tusked wire as well as paper seals
M/s Polaris Enterprises
m/s sharma electricals
M/S SURYA ENTERPRISES
M/s Wazir Agencies
M/S SURYA ENTERPRISES
M/s Polaris Enterprises
m/s sharma electricals
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .