| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.2 LAccepted-AOC HIMACHAL PRADESH HP | MANDI | HIMACHAL PRADESH | 175001 | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹5.3 L+₹10,620 (2.04%)Rejected-AOC | L-2 | Rejected-AOC L-2 | |
| 3 | L-3₹5.9 L+₹65,582 (12.6%)Rejected-AOC VILLAGE BANAS P O JAON TEHSIL ANNI DISTT KULLU HP | SHIMLA | HIMACHAL PRADESH | 172001 | L-3 | Rejected-AOC L-3 |
| Sl No | Description | Qty | Unit | CONTRACTOR L3 | RANJEET THAKUR L1 | KARAN SEN L2 |
|---|---|---|---|---|---|---|
| 1.00 | Hiring of Poclain/Excavator-cum-Loader 154 hp (1.3 Cum capacity) required for the removal of silt, boulders, and debris accumulated in Phojal River along 220/33 Kv GIS Substation Phojal, Tehsil Manali Distt Kullu HP including diversion the route of river in all lead and lift, as and when required or as per the direction of the Engineer-in-Charge (EIC). In case of any loss of public property or accidents during the execution of the work, the contractor will be fully responsible. The contractor will provide fuel, POL (Petrol, Oil, and Lubricants), and operational staff for the machine. Any repairs or accidental charges for the machinery during the execution of the work will also be borne by the contractor. Without Breaker | 66 | Hour | 4,033 ₹3,14,090.04 | 3,600 ₹2,80,368 Lowest | 3,700 ₹2,88,156 |
| 2.00 | Hiring of Poclain/Excavator-cum-Loader 154 hp (1.3 Cum capacity) required for the removal of silt, boulders, and debris accumulated in Phojal River along 220/33 Kv GIS Substation Phojal, Tehsil Manali Distt Kullu HP including diversion the route of river in all lead and lift, as and when required or as per the direction of the Engineer-in-Charge (EIC). In case of any loss of public property or accidents during the execution of the work, the contractor will be fully responsible. The contractor will provide fuel, POL (Petrol, Oil, and Lubricants), and operational staff for the machine. Any repairs or accidental charges for the machinery during the execution of the work will also be borne by the contractor. With Breaker | 38 | Hour | 4,800 ₹2,15,232 | 4,550 ₹2,04,022 Lowest | 4,600 ₹2,06,264 |
| 3.00 | Transportation Charges Poclain/Excavator-cum-Loader 154 hp including mobilization + demobilization of the Poclain including loading/unloading, transport, permits/taxes/tolls and allied expenses | 1 | Job | 48,500 ₹57,230 | 31,000 ₹36,580 Lowest | 31,500 ₹37,170 |
Tender Value
₹5.0 L
EMD Value
₹9,950
Closing Date
29 Jan 2026, 5:00 pmClosed
Senior Manager (Projects)
HPPTCL, PIU Sarabai, Tehsil Bhunter, Distt. Kullu H.P. 175125
Deployment of Po-clain Machineries for removal of silt, boulders and other material accumulated in Phojal River along 220.33 Kv GIS Substation Phojal, Tehsil Kullu Distt Kullu HP
2026_HPPTC_126197_1
HPPTCL/PIU SARABAI/TENDERS/SMS/2025-26/20
Open Tender
Civil Works - Others
Item Rate
30 days
220.33 kV GIS Substation Phojal
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Senior Manager (Projects) PIU Sarabai
₹9,950
21 Feb 2026
20 Jan 2026
30 Jan 2026
20 Jan 2026
29 Jan 2026
20 Jan 2026
Hiring of Poclain/Excavator-cum-Loader 154 hp (1.3 Cum capacity) required for the removal of silt, boulders, and debris accumulated in Phojal River along 220/33 Kv GIS Substation Phojal, Tehsil Manali Distt Kullu HP including diversion the route of river in all lead and lift, as and when required or as per the direction of the Engineer-in-Charge (EIC). In case of any loss of public property or accidents during the execution of the work, the contractor will be fully responsible. The contractor will provide fuel, POL (Petrol, Oil, and Lubricants), and operational staff for the machine. Any repairs or accidental charges for the machinery during the execution of the work will also be borne by the contractor. Without Breaker
Hiring of Poclain/Excavator-cum-Loader 154 hp (1.3 Cum capacity) required for the removal of silt, boulders, and debris accumulated in Phojal River along 220/33 Kv GIS Substation Phojal, Tehsil Manali Distt Kullu HP including diversion the route of river in all lead and lift, as and when required or as per the direction of the Engineer-in-Charge (EIC). In case of any loss of public property or accidents during the execution of the work, the contractor will be fully responsible. The contractor will provide fuel, POL (Petrol, Oil, and Lubricants), and operational staff for the machine. Any repairs or accidental charges for the machinery during the execution of the work will also be borne by the contractor. With Breaker
Transportation Charges Poclain/Excavator-cum-Loader 154 hp including mobilization + demobilization of the Poclain including loading/unloading, transport, permits/taxes/tolls and allied expenses
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_186016.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.21 MB
Tender_for_upload.rar
Tender Documents • 0.21 MB
BOQ_186016.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .