Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹14.0 L+₹82,545 (6.26%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹15.9 L+₹2.7 L (20.4%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
3 Dec 2020, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE 969 EWS
GE 969 EWS C o 56 APO
MANNING AND OPERATION OF CHS AND HOT WATER PLANTS INCLUDING REPAIR AND MAINT OF INSTALLATION AND ALLIED INFRA AT GULMARG UNDER GE 969 EWS
2020_MES_391504_1
CANO 969/WS- /2020-21
Open Tender
Civil Works
Item Rate
182 days
Gulmarg
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE 969 EWS
₹30,000
Yes
14 Jan 2021
31 Oct 2020
5 Dec 2020
31 Oct 2020
3 Dec 2020
16 Nov 2020
60 days
Amount
Repair /replacement of hot water plant (Location Gulmarg) comprising of 06 number hot water generator of rapid cool / Western Make capacity 1,00,000-150000 K Cal/Hour and central heating system 100000 Kcal/hr for 80 ORS at Gulmarg including replacement of worn out defective parts. Disconnecting electrically, drain out of water, opening of boiler front cover, blower assembly all accessories & mounting of boiler & taking out helical coil Make : Rapid cool hot water generator 100000 K Cal/Hour, cleaning with pressure wash and chemical agent of heating coil, reparing/ replacing refactory and reassembling of the same after replacing fiberglass gasket necessary repairing/replacement of unserviceable parts complete including all minor repairs such as welding, brazing etc all items like nuts, bolt and washers etc. Complete all as specified and directed by Engineer-In-Charge. Followings:- (a) Opening of the front cover and descaling of helical coil/firetubes with pressure wash.
(b) Fiberglass front cover gasket and waterline gaskets suitable for hot water boiler as per sample. Complete all as specified and directed by Engineer-In-Charge.
(c) Refractory plate repair/replacement with ceramic material and compound front side. Complete all as specified and directed by Engineer-In-Charge.
(d) Digital temperature controller suitable for boiler with sensor complete all as per sample. Complete all as specified and directed by Engineer-In-Charge.
(e) Over Haulaing of burner assembly including replacement/reparing of Fuel pump, motor coupling, ignition electrodes, Sequence controller, fuel nozzzle, soloniod valve, fuel lines and fuel filter suitable for burner complete all as per sample. Complete all as specified and directed by Engineer-In-Charge.
(f) Repairing/replacement of wiring of panel with spare parts like relay, contactor switch, indication lamp, wire thimble etc complete all as per sample. Complete all as specified and directed by Engineer-In-Charge.
M&L for repairing of pump of capacity 3 HP with material like mechinical seal , bearing, washers etc. and rewinding of electric motor as required. Complete all as specified and directed by Engineer-In-Charge.
M&L for repairing of pump of capacity 5 HP with material like mechinical seal , bearing, washers etc. and rewinding of electric motor as required Complete all as specified and directed by Engineer-In-Charge.
M&L for topping up of glycol concentrate along with the necessary additives and inhabittor in cognition and supplied in barrels, the mixture freezing temperature should be -30 Deg. Complete all as specified and directed by Engineer-In-Charge.
Material and labour for disconnecting the filter bed from the indoor unit of AC's of various sizes cleaning the filter beds & copper fins, removal of complete dirt deposited inside the cooling coil fins area by spary of scale removing agent and flushing out with fresh water till removal of complete dirt from the fins area and flushing out with air bolwer and refixing the same in existing position. Complete all as specified and directed by Engr-In-Charge.
Material & Labour for chemical servicing of the out door unit of following capacities by dismantling the sheet metal parts, apply the organic compound of scale remover to the air cooled condenser fins & tube area, and flushing through forced method, till removal the complete scale deposit across the fins & tube and cleaning, fixing the sheet metal parts, fan blades, etc. Complete all as specified and directed by Engineer-In-Charge.
Material and labour for taking down unserviceable burnt compressor, Supply and fixing scroll type new compressor of existing unit make suitable for 1.5/2 TR air cooled split type unit and rectify the control wiring defects if any, connecting back all controls and refrigerant piping after necessary modification as required for system, pressure testing with nitrogen gas under constant pressure of 300 PSI Kg/sq.cm for minimum 08 hours vacumising, gas charging, commissioning and checking the performance of the system. Complete all as specified and directed by Engineer-In-Charge.
S&F in replacement of hard drawn copper pipe size suitable for existing one and connecting with indoor to outdoor unit of AC Plant along insulating rubber sleeves and including brazing. Complete all as specified and directed by Engineer-In-Charge.
Repair/ Maintenance of voltage stabilizer for automatic operation, single phase naturally air cooled indoor type & designed for input variation between 170 V to 250 V with output voltage stabilized at 230 V with accuracy of ± 2.5% and of capacity 5 KVA. Complete all as specified and directed by Engineer-In-Charge.
Supply and charging of refrigerant gas M -22/R-134 upto sufficient pressure for compressor of 1.5 ton capacity window type /split type ACs including connected works like pressure testing with nitrogen before filling of refrigerant gas including cutting of copper tubing and brazing and refixing in position complete. Complete all as specified and directed by Engineer-In-Charge.
Dismantling old and unsv air swing fan motor and replacing with new one suitable for 1.5/2 ton capacity split AC of existing make and model. Complete all as specified and directed by Engineer-In-Charge.
Dismantling old unserviceable condenser fan motor suitable for 1.5/2 ton capacity window /split type AC and replacing by new one of existing make and model . Complete all as specified and directed by Engineer-In-Charge.
S&F in replacement PCB card for indoor unit of same model and make suitable for 1.5/2 TR capacity split type units. Complete all as specified and directed by Engineer-In-Charge.
Manning and operation of 2 x hot water boiler installation (Location Near HQ Coy & Power House) MES No. 06Y/7025/HW/08 & 06Y/7026/HW/08 respectively, comprising of 01 number each hot water generator of Rapid cool capacity 1,00,000 K Cal/Hr with all safety devices/ accessories and mountings etc (08 Hrs in one shift i.e. one shift of eight hours) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, Complete all as specified and directed by Engineer-In-Charge. Note: i The contractor has to employ 01 (one) FGM per shift of 8 (eight) hours (i.e. total 1 FGM per day for one shift) for carrying out the duties. ii The shift hours shall be decided by the Engineer-in-Charge as per requirement and the contractor shall not have any claim what so ever on this account. iii Both HWP are within 200 mtrs distance.
Manning and operation of 2 x hot water boiler installation (Location Near Dias Hall & Clk Line) MES No. 06Y/7027/HW/08 & 06Y/7028/HW/08 respectively comprising of 01 Number hot water generator of Rapid cool capacity 1,50,000 K Cal/Hr with all safety devices accessories and mountings etc (08 Hrs in one shift i.e. one shift of eight hours) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, Complete all as specified and directed by Engineer-In-Charge. Note: i The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours (i.e. total 1 FGM per day for one shift) for carrying out the duties.ii The shift hours shall be decided by the Engineer-in-Charge as per requirement. and the contractor shall not have any claim what so ever on this account. iii Both HWP are within 200 mtrs distance.
Manning and operation of central heating installation No. 01 (Location new 80 ORs building HAWS) comprising of 03 numbers generator of WESTHERM capacity 2,50,000 K Cal/Hr with all safety devices accessories and mountings etc (16 Hrs in two shifts i.e. in two shifts of eight hours each) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, Complete all as specified and directed by Engineer-In-Charge. Note: i The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours for 2 (two) shifts (i.e. total 2 FGMs per day for two shifts) for carrying out the duties.ii The shift hours shall be decided by the Engineer-in-Charge as per requirement. and the contractor shall not have any claim what so ever on this account.
Manning and operation of hot water boiler installation (Location Near 19 IDSR) MES No. 06Y/7030/HW/08 comprising of 01 number hot water generator of Rapid cool capacity 1,00,000 K Cal/Hr with all safety devices accessories and mountings etc (8 Hrs in one shift i.e. one shift of eight hours) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, Complete all as specified and directed by Engineer-In-Charge. Note: i The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours (i.e. total 1 FGM per day for One shift) for carrying out the duties.ii The shift hours shall be decided by the Engineer-in-Charge as per requirement. and the contractor shall not have any claim what so ever on this account.
Manning and operation of hot water boiler installation (Location Near 15 GARH Rif) MES No. 06Y/7029/HW/08 comprising of 01 number hot water generator of Rapid cool capacity 1,50,000 K Cal/Hr with all safety devices accessories and mountings etc (8 Hrs in one shift i.e. in one shift of eight hours) including de-scaling/de-carbonising of generator fortnightly with, adjustment of burner assembly, safety devices, draining/operation of water control valves as shown at site to avoid freezing effect in lines, emergency light arrangement, access to valve with ladders etc, Complete all as specified and directed by Engineer-In-Charge. Note: i The contractor has to employ 01 ( one) FGM per shift of 8 (eight) hours (i.e. total 1 FGMs per day for One shift) for carrying out the duties. ii The shift hours shall be decided by the Engineer-in-Charge as per requirement and the contractor shall not have any claim what so ever on this account.
General Notes for Contracts (Sch 'A' item 19 to 23) :- (i) The rate quoted by the Contractor should be inclusive of minimum fair wages, applicable tax liabilities, expenses towards EPF, ESIC, uniform, overheads and profits. (ii) The contractor must pay minimum fair wages as per Govt of India Ministry of Labour and Employment latest notification to all employees/workers. (iii) The contractor shall deduct workers subscription towards provident fund and ESIC, as per rule and shall deposit the same alongwith his contribution into respective accounts of workers and shall submit details to GE for verification (iv) Contractor will make the payment of (FGM/Electrician/Helper) in their bank account through ECS/NEFT/Cheque. Bank statement in respect of payment made to all employed FGM/Electrician will be submitted before claiming RAR payment. (v) Contractor will present all the tradesmen to GE with their ITI and experience certificate for approval of their suitability for the job before employing them. (vi) ID proof and police verification of all labour/operator/supervisor be submitted in GE office immediately after acceptance of tender to issue security pass. (vii) Contractor will provide proper uniform as per PS Clause No 15 or as approved by GE to all their employed FGM/Electrician/Helper. (viii) Refer PS Clause 10.4 for minimum penal recovery for non operating and or non-maintaining installations. (ix) Weekly off to workers shall be given and cost of reliever is deemed to include in quoted rate.
NAJAR ENTERPRISES
M/S KULWANT SINGH RAINA AND CO
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .