Loading…
Loading…
Tender Value
₹90.2 L
EMD Value
₹1.8 L
Closing Date
24 Jul 2026, 3:00 pm
S&T work in connection with Construction of TRT siding at Bamra.
ST-CKP-OT-26-27-50
ST-CKP-OT-26-27-50
Open
6 Months
Shivpuri, Madhya Pradesh
₹0
₹1.8 L
2 Jul 2026
2 Jul 2026
10 Jul 2026
B-Material Supply (Signalling) 791328.00 Below/P
A1-Modification / Alteration in existing EI 2042389.14 Below/P
Item Breakup - A-Execution (Signalling)
Excavation of trench in all kinds of soils Kilometre including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released.(i) Depth 1.0 meter, Width 0.3 meter.
Laying of S&T Cables (Signal/Quad/Power) in Kilometre the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports.
Transportation of cables in rolls with or without Drum-Km wooden drums (S&T Cables) from concerned store to the site of works. Note: The unit Drum- KM indicates Drum X length of cable in that drum. It doesn't have any significance over the distance it has to be carried for execution of the work. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Execution of Straight joint on Quad cable/ jelly Numbers filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released.
Supply & laying of 300 mm X 100 mm pre- Metre cast/cast in -situ RCC cable ducts including top cover as per RDSO drawing No. SDO/S&T/RCC DUCT/1018/1 & 2, dated 29.5.23 or latest. Note- The rate is inclusive of all type of transportation including labour till it is placed into trenches. The laying of cables shall be paid separately fulfilling the laying procedure as per above drawings. (Inspection by representative of Sr. DSTE/CKP)
Mechanised Drilling/Micro Tunnelling under Metre important/ busy metal/concrete road/Railway track and laying of GI pipe including supply (make: TATA/Jindal or better) of min. 75mm inner diameter Grade Medium with Spec. No. IS- 1239, Pt-1, 2004 including supply, Boring and pulling cable upto 110mm dia. at a depth of min. 1 meter as per site condition. This also includes reinstatement of the surface to the original state.
Horizontal Drilling by using manual pushing Metre method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe.
Cement Concrete of proportion 1:3:6 (Cement: cum Sand: Stone chips of 25mm nominal size) for miscellaneous works. It includes excavation, ramming of CC by using vibrator, curing and plastering with cement and sand mixture (aggregate will not exceed beyond 3.8 cm). Note: All materials required for foundation are to be supplied by the contractor. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Execution of Full Apparatus Case with earth Numbers excavation for pit, concrete foundation, surrounding earth work, erection and installation as per Drawing No. Con/SK/T/8 or latest and wiring to be done as per SEM Drawing No.19-D8 or as per direction of site engineer. Supply and fixing of Hylam sheet strip of appropriate size of 3 mm or 6 mm as required with hole for fixing of terminals, fuse blocks, relay and other accessories for signal/track circuit, termination of cable with number embossed ferrules, bunching of cables with PVC tape, proper soldering of cable armour with earth catenary wire, earthing of cable armour as required. Writing & terminal description including Painting of the apparatus case inside and outside after clearing the surface thoroughly and first coating of anticorrosive paint and subsequent two coats of Aluminium paint outside and red oxide inside and lettering etc. This also includes transportation of 25 mm/12mm Hylam sheet for shelf or as required and also includes minor modification in L/Boxes as per site requirement. The contractor shall supply 4 no. of foundation nuts & bolts of size 22 mm dia. x 450 mm long with 2 flat spring washers, with each nut & bolts, sand for filling up cable pit inside the apparatus case including plaster and bolts, nuts, screws, MS Clamps for fixing equipment/cable. Note: - Part payment shall be released after completion of- (i) Foundation- 40%, (ii) Erection - 10%, (iii) Wiring, earthing, testing - 20%, (iv) Painting, writings - 10%, (v) Plastering, sand filling & etc. - 10%, (vi) Commissioning - 10%.
Transportation and installation of 2-Aspect Numbers Signal Post for MACLS as per drawing no. Con/SK/T/12 or SEM-Drawing No. 19-D3 or RDSO/M-00011RU dated 12.01.18 or latest complete with signal units, base, ladder and other fittings, excavation of earth pit, casting concrete foundation, erection of posts, thereof as specified in the note given in drawing, fixing of complete fittings of the signals with necessary earth screen protection arrangement as required including termination of cables, painting and lettering as required. Foundation nuts & bolts of appropriate size as per above drawings or latest as per RDSO Drawing No. SA-116 A/M confirming to IS: 226 and IRS:S-10/78 Rev.8. or latest to be supplied.
Transportation, installation of Position light Numbers Shunt Signal as per Con/SK/T/13 or SEM Drawing No. 19-D4 or latest complete with units, base and other fittings, excavation of earth pit, casting of concrete foundation thereof as per note given in drawing, fixing in complete fittings of signal including termination of cables, painting and lettering as required. Foundation nuts & bolts of size 20 mm x 305 mm as per RDSO Drawing No. SA- 110 A/M confirming to IS: 226 and IRS:S-10/78 Rev.8.
Transportation, Installation, Wiring, Testing & Numbers Commissioning of LED Signals Lamps for Main signals Lighting Unit (i.e. Red/Yellow/Green) as per instruction of railway Engineer at the site. Note: LED particulars such as aspect, make, type, Sr. No. etc. to be recorded in proper in proper register. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Transportation, Installation, Wiring, Testing & Numbers Commissioning of LED Signals Lamps for Subsidiary signals lighting unit (i.e. Route aspect/Shunt Signal/Calling on aspect/A marker/AG marker etc.) as per instruction of railway Engineer at the site. Note: LED particulars such as aspect, make, type, Sr. No. etc. to be recorded in proper register.
Transportation and installation of Electric point Numbers machine on MS plate fixed on concrete sleepers complete with fixing of anti-theft cover, crank handle key interlocking arrangements, Junction boxes, ground connections including smithy works, insulation of MS plate on which the point machines to be fixed from the gauge tie plate involving riveting/welding of angle cleats, termination of cables, preliminary adjustment of operation of points by crank handle, wiring, painting and lettering as required. Drilling of holes for fixing of switch extended bracket and leading stretcher bar, lubrication etc. Note: All the required nut-bolt, washer, MS-plate for anti- theft, eyelets, etc. for fixing of point machine to be supplied by contractor.
Excavation of earth pit, placing & fixing of Numbers Earth electrode with construction of cement enclosure to SEM Drawing No. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties/relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway.Note: MS Flat strip to be coated with anti corrossive black paint by contractor before connection. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Design and supply of the following drawings to Station office records as per requirement of the Railways. This includes alteration at different stages and finally supply of all the drawings including tracings within 30 days or as defined in the tender document from the date of commissioning of the work, otherwise penalty to be imposed as per tender document. This includes the following drawings for each station: (1) Cable layout plan, (2) Cable corrage plan, (3) Location Hut drawing, (4) Termination chart of end goomties and location hut, (5) Traction bonding plan, (6) Contact Analysis Chart, (7) SWRD & GWRD, (8) Equipment Layout Plan, (9) Power Supply arrangement diagram, (10) Relay Disposition chart, (11) Any other drawing as found relevant as per site condition. Office record if online maintenance is not implemented includes the following: (i) Battery History book, (ii) Track Circuiting Register, (iii) Track circuit maintenance Register, (iv) Cable Meggering Register, (v) Signal History Register, (vi) LED Register, (vii) Glued joint/ Block joint Register, (viii) Point machine Maintenance Register, (ix) Joint Inspection Register such as P. Way, Electrical & Signal, (x) Relay Register, (xi) Route cancellation Register, (xii) Relay Room Key Register, (xiii) Emergency Point operation Register, (xiv) Crank Handle Register, (xv) Emergency Route Cancellation Register, (xvi) Axle counter reset register, etc. (xvii) Supply and preparation of SIP where required. Note:-(i) All the diagram will be made on Auto CAD. The paper size of wiring diagram will be A-3 or as per IRSEM or as per IRSEM. Soft Copy/AUTOCAD file of all drawings to be submitted alongwith paper drawing. Wiring diagram will be made in 'Black colour'. Alteration to wiring diagram will be done using 'RED' and 'Green' colouring scheme. RED = new equipment/contact to be installed or commissioned. GREEN = redundant equipment/contact to be recovered.(i) Up to 6 to 10 line yard. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Design of Route Control Chart (RCC), Front Station Plate Diagram (FPD) and circuits for Panel/Electronics Interlocking as per approved Signal Interlocking Plan and typical circuit diagram. Wiring diagram shall be made in 'Black Colour' and Alteration to wiring diagram with Red for new installation and green for deletion contact/equipment. All the drawing and design shall include the copy of production checking, independent checking, first & second level checking, and commissioning copy. Submission of Two sets of prints with all correction for Railway's approval. Approved copy (06 Sets) of all drawings in plastic folders along with the original tracings in spiral bound with editable Auto-CAD file latest version. This includes the following drawings for each station: (1) Cable layout plan, (2) Cable corrage plan, (3) Location Hut drawing, (4) Termination chart of end goomties and location hut, (5) Traction bonding plan, (6) Contact Analysis Chart, (7) SWRD & GWRD, (8) Equipment Layout Plan, (9) Power Supply arrangement diagram, (10) MSDAC DP Plan orAny other drawing as found relevant as per site condition. Office record if online maintenance is not implemented includes the following: (i) Battery History book, (ii) Track Circuiting Register, (iii) Track circuit maintenance Register, (iv) Cable Meggering Register, (v) Signal History Register, (vi) LED Register, (vii) Glued joint/ Block joint Register, (viii) Point machine Maintenance Register, (ix) Joint Inspection Register such as P. Way, Electrical & Signal, (x) Relay Register, (xi) Route cancellation Register, (xii) Relay Room Key Register, (xiii) Emergency Point operation Register, (xiv) Crank Handle Register, (xv) Emergency Route Cancellation Register, (xvi) Axle counter reset register, etc. (i) Up to 6 to 10 line yard.
Preparation of Station Working Rules (SWR) in Set English on the basis of station working rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railway for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive.
Preparation of Station Working Rules (SWR) in Set Hindi/Regional Language of that station on the basis of station working rule diagram and gate working rule diagram to be supplied by the contractor. Submission of two draft copy to railway for checking and resubmission of draft in three copies for approval of division after making corrections. Editable Soft copy to be supplied in pen drive.
Designing Interlocking Plan(SIP) in AUTOCAD. Two copies of prints with soft copywill be submitted to Railway for checking. If alterations aresuggested/proposed by Railways then again two copiesof prints will be submitted for advance approval after carrying out all the alterations as suggested/proposed by the Railways. Tracings will be submitted for all thediagrams mentioned above for the purpose of approval by Railway prior to commissioning of station. CKP-DIVN- S AND T/SOUTH EASTERN RLY
HDD: In case of short stretches (less than 100 Metre m in single stretch) Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC /45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (i) 4 HDPE pipe.
Alterations/modifications works on existing Numbers relay rack (Q-series/ Composite Relay Racks)/ Cable Termination Racks (CTR) including works of installation, wiring, termination, testing and commissioning. The work includes fixing of aluminium/steel/M. S ladder along with supply as per requirement to accommodate additional plug board, relays, terminals/blocks, terminals, tag blocks, fuses, transformers, bus bars, TW shelves/strips etc. in the existing relay racks/CTR's, 6 mm Hylam sheets of required length for writing terminal description etc. fixing and termination of cables on the relay racks, CTR's with number embossed ferrules, bunching of cables with PVC tapes, earthing of cable armours, covers including painting and lettering, making anti tilting arrangement. Note:- a) Relay rack (Q-series/ Composite Relay Racks) : Payments for alterations in existing relays upto 20 nos. relays & above 20 nos. shall be made 50% & 100% respectively. b) Cable Termination Racks (CTR):- Payments for alterations in existing CTR upto 120 cores & above 120 nos. cores shall be made 50% & 100% respectively.
Alteration/modification in existing location Numbers boxes, includes fixing/Removal or both the equipment, cable insertion, termination, wiring, testing & commissioning, two coat painting, lettering to suit the circuits as per approved wiring diagram. This includes filling with sand and plastering the same. Note: All the sundry materials such as paint, sand, cement, screws etc to be supplied by the contractor.
Transportation, installation and wiring of Numbers Rotary key transmitters/KLCR on Hylam sheet board including wiring & fixing of push button bell switch on Hylam sheet of 12mm including termination, painting & lettering. The sundry materials such as Hylam sheet, push bell switch etc. to be supplied by contractor. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Shifting/re-locating/opening & refitting during Per Engineering work, fixing, wiring, testing of Detection existing MSDAC DP as per direction of site Point (DP) engineer of Railway. This includes excavation of trenches for fixing of Tx/Rx cable, foundation etc. if required and re-erection of same DP. Note: Track device means 01 DP of MSDAC. Any Rail connect/Track device accessories like nut & bolt, insulation etc. and damage during shifting has to be supplied by the contractor.
Miscellaneous arrangements for NI period Station comprising of a) Temporary goomty/Tent of dimension at least 12'x12' at both side of the station yard and at central panel building, furnished with one table, six chairs, emergency light and mosquito repellent. b) Sufficient temporary lighting arrangement throughout the yard from Sunset to sunrise one day prior, during and post NI work. This includes provision of minimum two DG set of minimum 7.5 KVA capacity and halogen/LED flood lights. The DG sets, consumables materials such as Diesel, Operator etc. has to be arranged by the contractor at his own cost. c) Provision of PA System at both the end of the yard, including at central location if required. d) Resting arrangement for atleast 16 staff at night. e) Vehicle for transportation for to and fro movement of S&T staff during NI period. f) Manning of adjacent station to be done by contractor. g) Provision of printing/Xerox copies of drawings, wiring diagram, CTR/ Location box terminal chart, point wiring, MSDAC/track circuit wiring, NI program, Signal wiring, track bonding plan, etc. in a plastic folder. No. of copies depends upon the number of team formed for NI and as per instruction of officer incharge of NI. h) This also includes Free home & Free Starter wiring for NI as per the instruction of site engineer and any other works as assigned from time to time by Railway engineer. (i) Up to 200 Routes.
Physical tracing and opening/locating of Metre existing working cables by precision digging for diversion of cables in connection with cable clearance for engineering earth work or for utility shifting without interfering the circuits as per the advice of Railway site Engineer.
Shifting of existing location boxes to facilitate Numbers earthwork by Engineering department or others by realising of cables from old location boxes and taking into new location boxes. This includes excavating the earth to release from old & insert into new location boxes & finally filling with sand and plastering inside new location boxes. Note: The released location box has to be deposited to the nearest station.
Removal of normally 13m Rail in the way of Numbers cable route trench, signal/location box foundation, track crossing etc. In case of less or more than 13 m, proportionate payment to be done. These obstructions will be removed by the contractor for ensuring proper execution of related works. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Removal of PSC/Wooden/Steel sleeper in the Numbers way of cable route trench, signal/location box foundation, track crossing etc. These obstructions will be removed by the contractor for ensuring proper execution of related works.Note: In case of broken sleepers, proportionate payment will be made.
Supply, transportation and fixing of RCC Cable Numbers Route Marker as per SEM drawing No. 15-D1 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply And Installation of Mould And Numbers ExothermicPowder ( Single Welding) for copper strip 25x2 to Earth Pit for Earth pits interconnection/copper strip 25x3 to copper strip 25x3/35Sqmm PVC Cable to 200x25x6mm Copper BusBar /17.2mm Rod To 200x25x6mm Copper Busbar / 50x6 mm Galvanized steel tape to Earth Pit for Earth pits interconnection.Note: this include transportation of all associated materials used for welding.Exothermic material to be used f r o m NABL/ILAC tested. (Inspection by representative of Sr. DSTE/CKP)
Supply & Transportation and fixing of PVC Metre Conduit pipe/channel/casing caping on wall or structure with drawls of Telecom/Power/Data cable/10Sq./16Sq./35Sq. multi strand cable with proper finishing. This includes supply of fixing materials including flexible pipe/bend etc. as required during course of execution.The cutting to be filled and finished with cement/concrete, and plastering. The wire will be laid in suitable PVC pipe and this work is to be executed as per directions of Railway engineer at site. (Inspection by representative of Sr. DSTE/CKP) Total 3023955.00
Item Breakup - B-Material Supply (Signalling)
Supply of Negative Bus Bar of size 20 mm X 5 Metre mm made of copper bar with brass screw & washer minimum length of one piece is to be 0.3 m. The bar and screw should be nickel plated. (Inspection by representative of Sr. DSTE/CKP)
Supply of Thermo-shrink jointing (TSF) kits for Numbers jointing underground Quad cable of size 0.9mm/1.4mm diameter conductor for straight/condenser/Y-(Derivation)/Loading Coil/Transformer Joints as per Specification No. IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest. (Inspection by RDSO)
Supply of 25 mm 6 Way PBT Terminal block as Numbers per Specification No. IRS:S-75/2006 Rev. 2.0 or latest as per IRS Drg. No. SA-23756 Alt-3 or its latest amendments. (Inspection by RDSO)
Supply of Non-Deteriorating type of low voltage Numbers electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S- 78/2006 or latest. (i) ND Fuse Cylindrical Type 2 Amp. (Inspection by RDSO) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of Non-Deteriorating type of low voltage Numbers electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S- 78/2006 or latest. (i) ND Fuse Cylindrical Type 4/6 Amp. (Inspection by RDSO)
Supply of Non-Deteriorating type of low voltage Numbers electric fuse for Railway signalling use, fuse with cylindrical cap without indication, cylindrical fuse as per Specification No. IRS:S- 78/2006 or latest. (i) ND Fuse Cylindrical Type 16 Amp. (Inspection by RDSO)
Supply of PBT fuse block as per Specification Numbers No. IRS:S-75/2006 Rev. 2.0 or latest as per IRS drawing No. . SA: 23748 with alt 4 or its latest amendments. (Inspection by RDSO)
Supply Multistrand, unsheathed with plain annealed/tinned copper conductor 16/0.2 mm diameter as per Specification No. IRS:S-76/89 or latest. Wire Colours shall be decided by engineer-in-Charge. Note: The requirement of plain/tinned copper to be decided by the Engineer-in-charge. (Inspection by RDSO)
Supply of PVC Insulated single core cable Kilometre multistrand, unsheathed with plain annealed/tinned copper conductor 3/0.75 mm diameter as per Specification No. IRS:S-76/89 or latest. Wire Colours shall be decided by engineer-in-Charge. Note: The requirement of plain/tinned copper to be decided by the Engineer-in-charge. (Inspection by RDSO)
Supply of PVC Insulated single core cable Kilometre multistrand, unsheathed with plain annealed/tinned copper conductor 7/0.75 mm diameter as per Specification No. IRS:S-76/89 or latest. Wire Colours shall be decided by engineer-in-Charge. Note: The requirement of plain/tinned copper to be decided by the Engineer-in-charge. (Inspection by RDSO)
Supply of PVC insulated 10 Sq. mm Single core Metre Multi strands copper conductor as per Specification No. IRS:S-76/89 or latest conforming to IS: 694/2010 or latest. Wire Colours shall be decided by Engineer-in- Charge. (Inspection by RDSO)
Supply of PVC insulated 35 Sq. mm Single core Metre Multi-strands copper conductor as per Specification No. IRS:S-76/89 or latest conforming to IS: 694/2010 or latest. Wire Colours shall be decided by Engineer-in- Charge. (Inspection by RDSO)
Supply of PVC insulated 16 Sq. mm Single core Metre Multi-strands copper conductor as per Specification No. IRS:S-76/89 or latest conforming to IS: 694/2010 or latest. Wire Colours shall be decided by Engineer-in- Charge. (Inspection by RDSO)
Supply of Steel Apparatus case Full height as Numbers per Drawing No. SK/Drg./OL/SER /198 or latest with E type lock . E-type lock & their key ward No. will be decided by site engineer as per Specification No. IRS: S-10/78 with Rev. 8 or latest. Supply of Hylam sheets is not covered under this scope. This includes supply of one key & handle for each four Apparatus Case or minimum one. (Inspection by reprsentative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of 6 mm thick Hylam Sheet of size 8 Numbers foot X 4 foot as per specification no. IS 2036 of 1995 or latest. Note:- In case the requirements are different from the above, proportionate payment will be done. (Inspection by representative of Sr. DSTE/CKP)
Supply of Key Lock - 'E' Type with key as per Numbers RDSO Drg. No. SA-3376/M, Alt-2(Lock) or latest & SA-3377 (Key) or latest, and Specification No. IRS: S 30-64 Rev 0 or latest and IRS S-10 or latest. Ward No. shall be as per instruction of Railway. (Inspection by RDSO)
Supply of metallic Colour Light Signal, Multi Numbers Unit type Two Aspect complete but without lamp holder, lenses & transformers as per IRS:S-26/64 or latest and RDSO Drawing No. SA23003 A/M (Adv.) or latest. Mounting socket including its material shall be as per RDSO Drawing No. S 23005/M or latest for mounting on 140 mm outside diameter post. (Inspection by representative of Sr. DSTE/CKP)
Supply of Shunt Signal Position Light type Numbers complete with base, post etc. as per Drg. No.SA- 23840 (Adv.) Alt '1' or latest, S-23203 or latest and Drg. No. 23845(Adv.) or latest for 90 mm dia. mounting socket as per Specification No. IRS: S-10/78 with Rev. 8 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply of 140 mm diameter Cast Iron (Grade- Numbers 20) Signal base as per Drawing No. S-2011/M and as per Specification No. IRS:S-10/78 & IS:210 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply of 4.5 meter Tubular (Seamless) Post Numbers for Colour Light Signal as per Specification No. IRS:S-6/81 or latest to suit 140mmm dia. base. (Inspection by representative of Sr. DSTE/CKP)
Supply of 4.5 meter Ladder for Colour Light Numbers Signal as per RDSO Drawing No. SA-23153 (Adv.) or latest and Stage with Ladder foundation as per Drawing No. S-2033/M (IRS) or latest & as per Specification No. IRS:S-10/78 & IS:210 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply of Earth Electrode as per Drawing No. Set 19-D6 of SEM-2021 or latest. GI pipe confirming to IS:1239 or latest of 3.17 mm thickness, minimum 2.5 m long, 50.8 mm diameter, 4.76 mm diameter drilled holes staggered at distance of 152.4 mm. (Inspection by representative of Sr. DSTE/CKP)
Supply of 35 mm x 6 mm thick MS Flat Plate Metre Strip as per IS: 226-1975 or latest for earth connection to Signal post, L/Box etc. (Inspection by representative of Sr. DSTE/CKP)
Supply of Polymeric Positive Temperature co- Numbers efficient self-Restoring Type fuse (PPTC) of 24- 110V, 2-3 Amps capacity Fuse should have an insulating coating of flame retardant epoxy to meet UL-94, V0 requirement working temperature range 40 Degree Celsius to 85 Degree Celsius and leads to be tin platted copper. (Inspection by representative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of Polymeric Positive Temperature co- Numbers efficient self-Restoring Type fuse (PPTC) of 24- 110 V, 4 Amps capacity Fuse should have an insulating coating of flame retardant epoxy to meet UL-94, V0 requirement working temperature range 40 Degree Celsius to 85 Degree Celsius and leads to be tin platted copper. (Inspection by representative of Sr. DSTE/CKP)
Supply of Electric Key Transmitter (EKT)/Rotary Numbers key transmitter (RKT) as per Specification No. IRS:S-21/2001 Rev 1.0 or latest & Drawing No.SA-22601 or latest with the keys and wards nos. will be per instructions given by site Engineer-in-charge. (Inspection by RDSO)
Supply of DC-DC converter 110/(24 - 32 V, 10A) Numbers as per Specification No. RDSO/SPN/165/2023 Ver. 4.0, Amdt.1 or latest. It should be compatible with existing system as specified by Railway in-charge. (Inspection by representative of Sr. DSTE/CKP)
Supply of 1 copy of SWR in English finally Numbers approved by railways along with spiral binding. This has to be done after CRS sanction has been obtained. (Inspection by representative of Sr. DSTE/CKP)
Supply of 1 copy of SWR in Hindi/Regional Numbers Language of that station finally approved by railways along with spiral binding. This has to be done after CRS sanction has been obtained. (Inspection by representative of Sr. DSTE/CKP) Total 791328.00
Item Breakup - C-Execution (Telecom)
Location survey of cable route, preparation of Route Kilo tentative showing GPS Lat & long and final Meter cable route plan (for OFC/Quad cable only) as (RKM) per approved format in the section including supply of final route plan after the cables are laid and commissioned indicating clearly the exact position of the cable, joints and other critical items with reference to OHE mast & other fixed structures, etc. in 06 nos. hard bound copies on white bond paper of maximum A-3 size well documented and bound with plastic covers with editable soft copy in Auto CAD (latest version) . Note: Part payment shall be released after completion of (i) Survey - 60 % , (ii) Tentative drawing - 10 % & (iii) Final cable route plan - 30 %.
Excavation of trench in all kinds of soils Kilometre including soft rocky area and clearing of roots of trees, rocks, bushes, ballast & reconditioning etc., including bailing out water and disposal of extra soil including back filling with excavated earth and ramming of trenches after cable laying for the following depths and widths as specified in Technical Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER or any other latest guidelines. Note: In case, trenches are other than prescribed depth & width, Proportionate payment shall be released. (i) Depth 1.2 meter, Width 0.5 meter. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Excavation of trench in all kinds of soils Metre including soft rocky area and clearing of roots of trees, rocks etc. to a depth of 1 metre and width 0.3 mtr. Track/ Pucca road/Platform crossing/ Level crossing as per SEM Drawing No.15-D5 including supply, transportation and laying of DWC pipes (full) with collar(for jointing pipes) Inner diameter/Outer diameter:103mm/120mm to Specification No.14830 (Part-2):2001 as per SEM Drawing No. 15-D4 and drawing of cable through DWC pipes with collar(for jointing pipes) including back filling and ramming after cable laying as specified in Tech. Circular No. 2 of 1988 & 01/2010 issued by CSTE/SER for S&T Cables or any latest guidelines. This includes repairing and plastering of Platform/Pucca road after cable laying. Material inspection shall be done by Railway site Engineer.
Horizontal Drilling by using manual pushing Metre method (also called moling) at minimum depth of 1.5 meter below the formation level of earth as per decision of Engineer in charge. Boring diameter should be atleast 110mm. The ground level shall be considered ignoring the bank height of the bank of the road. Note: DWC/HDPE/GI Pipe Supply is covered under this item. Contactor shall provide all material required for work and adequate nos. of labours for proper laying of cables into the bore. Cable shall be laid cautiously so that it should not get damage due to rough handling & pressure on cable. Payment of boring shall be made only after laying of the cables into DWC/HDPE/GI pipe.
HDD: In case of short stretches (less than 100 Metre m in single stretch) Micro Tunnelling through Horizontal directional drilling (HDD) machine, preparation of sites, boring and laying of HDPE pipes of size (Outer/Inner diameter= 50mm/42mm) for crossing of S&T cable through HDPE pipe at bridges/culverts/track crossing/pucca road crossing. Boring trench shall be minimum 3 (three) meter below the surface/river bed and minimum 1 m at track/road/pucca road crossing area etc. This includes supply of permanently lubricated HDPE telecom ducts of equal length as per Specification No. RDSO/SPN/TC/45/2013 REVISION 2.0 with latest amendments. For each HDPE duct the following items are to be supplied as per requirement (a) End plug, (b) Cable sealing plugs, (c) Plastic coupler slip fit/push fit type & (d) End plugs to be provided along with drum. In case the site doesn't allow to perform as per schedule, written approval must be obtained from at least site incharge officer. Note: The boring profile should be recorded and submitted for verification of depth and length of boring. (i) 3 HDPE pipe. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Laying of S&T Cables (Signal/Quad/Power) in Kilometre the excavated trench to Drawing No. CON/SK/T/5 or latest. Supply and transportation of 'U' clamps, anchoring of cable at every 10 metres interval with 'U' clamp on trench to Drawing No. CSTE/CON /CABLES/81 or latest. Supply, transportation, and placing of cable demarcating led belt to Drawing No. CON/SK/T/6 or latest punched at an interval of 30 metres and wrapped round each cable throughout the cable route and also at every track/Road/ platform crossing as above specified in Technical Circular No. 2/1988 & 01/2010 issued by CSTE/SER or as per latest guidelines and guarding the cables. Collecting empty drums with left over cable and to be returned to the stores of stock holder. Note: Cables will be meggered before & after its laying by contractor under supervision of Railway representative & Contractor will submit their reports.
Transportation including loading/unloading of Kilometre Optical Fibre Cable along with HDPE pipe from the stores of SSE/Store or from any store of SE Railway to the site with care laying of HDPE pipe & blowing of OFC in it as per procedure and returning empty cable drums with or without left over cable to the stores of SSE/Store. It also includes supply and placing of warning & Detection tape orange colour of 100 mm wide printed in black as CAUTION OFC CABLE" and laid throughout the trench as directed by the Representative of Railway. Note: OTDR of cables will be done before & after its laying by contractor under supervision of Railway representative & contractor will submit their reports.
Transportation of cables in rolls with or without Drum-Km wooden drums (S&T Cables) from concerned store to the site of works. Note: The unit Drum- KM indicates Drum X length of cable in that drum. It doesn't have any significance over thedistance it has to be carried for execution of the work.
Cement concreting/preparation of cable duct of Metre cable route with graded stone chips with thickness/depth & width of 300mm x 150 mm. and grouting of both sides & refilling after cable laying. The standard ratio of cement, sand & 20 mm chips shall be 1:3:6 respectively. N.B: Contractor shall supply materials such as cement, sand, chips etc. & transport the same to the execution site. The contractor shall also execute the following. Approx. of 4.49 bags of cement/Cu.metres shall be used. Cement (OPC/Slag) should be of Gr. 53 and will be inspected by SSE/Sig-in-charge before use.
Splicing of Optical Fiber Core and routing in CORE joint closure/FDMS as per instruction of site Engineer. CKP-DIVN- S AND T/SOUTH EASTERN RLY
Excavation of earth pit, placing & fixing of Numbers Earth electrode with construction of cement enclosure to SEM Drawing No. 19-D6 and drawl of 6 SWG GI/Copper cable from earth electrode to goomties/relay room/cabin/station, etc. and drawl of MS flat 35mm x 6mm for signal post/Location box shall be used as the case may be, including fixing at both ends of the wire/MS flat. This includes transportation of materials. Note: Materials such as charcoals, salt, sal ammoniac, 6 SWG GI wire, copper lugs with Steel bolts & nuts etc. shall be supplied by the contractor. MS flat 35mm x 6mm/Copper cable shall be supplied by Railway.
Execution of Straight joint on Quad cable/ jelly Numbers filled Telecom cable using Thermo- shrink/Universal jointing kit (RTSF-4). This includes excavation of cable joint pit of size 1.5 m X 1.5 m X 1.2 m for jointing of cables, back filling and ramming after jointing. After jointing, the cable through test such as insulation test, continuity test etc. to be carried out jointly with Railway Engineer. If any defect or any damage is observed during jointing the contractor has to redo the joint free of cost. Note: In case jointing is required to be done in the Location boxes, then 80% payment will be released. Total 1178523.00
Item Breakup - D-Material Supply (Telecom)
Supply, transportation and fixing of RCC Cable Numbers Route Marker as per SEM drawing No. 15-D1 or latest. (Inspection by representative of Sr. DSTE/CKP)
Supply of Thermo-shrink jointing (RTSF-4) kits Numbers for jointing underground Quad cable of size 0.9mm/1.4mm diameter conductor for straight/condenser/Y- (Derivation)/Loading Coil/Transformer Joints as per Specification No. IRS-TC-77/2012 Rev.3 with Amd. 3.0 or latest. (Inspection by RDSO)
Supply of 24 Fiber OFC Joint Closure as per Numbers Specification No. RDSO/SPN/TC/68/ 2014 Rev 1.0 or latest complete with all accessories including sealing with mechanical clamp facility.(Inspection by representative of Sr. DSTE/CKP)
Supply, transportation and installation of RCC Numbers joint chamber with two piece top cover and bottom cover with holes for drainage and cable entry, as per Drawing No. RDSO/TCDO/COP-21 or latest. This includes trenching for jointing pit of size min 1.5 m X 1.5 m X 1.2m for all types of soils, back filling and ramming of the pit after placing the joint closure and cable loop in the chamber including dry sand upto 600mm height without causing any damage to same and consolidation of soil as well as disposal of excess soil. (Inspection by representative of Sr. DSTE/CKP)
Supply of HDPE pipe as per Specification No. Kilometre RDSO/SPN/TC/45/2013 Rev-2.0 or latest with OD/ID of size 40mm/33mm with suitable couplers, plugs, end caps, spacer, T band etc. as required during execution at the site. (Inspection by representative of Sr. DSTE/CKP) CKP-DIVN- S AND T/SOUTH EASTERN RLY
Supply of Double walled corrugated ducts Metre (DWC) as per Specification No. RDSO/SPN/204/2011 Ver 1.1 Amd.1 or latest of diameter 120mm/103.5 mm (Outer/Inner Dia.) including supply of min. 1 coupler (end cap/spacer/T band etc.) as required during execution at the site for each 6 metre of length. (Inspection by representative of Sr. DSTE/CKP)
Supply of Steel Apparatus case Full height as Numbers per Drawing No. SK/Drg./OL/SER /198 or latest with E type lock . Etype lock & their key ward No. will be decided by site engineer as per Specification No. IRS: S-10/78 with Rev. 8 or latest. Supply of Hylam sheets is not covered under this scope. This includes supply of one key & handle for each four Apparatus Case or minimum one. (Inspection by representative of Sr. DSTE/CKP)
Supply of Earth Electrode as per Drawing No. Set 19-D6 of SEM-2021 or latest. GI pipe confirming to IS:1239 or latest of 3.17 mm thickness, minimum 2.5 m long, 50.8 mm diameter, 4.76 mm diameter drilled holes staggered at distance of 152.4 mm. (Inspection by representative of Sr. DSTE/CKP)
Supply of 35 mm x 6 mm thick MS Flat Plate Metre Strip as per IS: 226-1975 or latest for earth connection to Signal post, L/Box etc. (Inspection by representative of Sr. DSTE/CKP)
Supply of Insulation tester 100V, 100 M with Numbers lead cables, Analog Display, metal body hand driven. Make: Waco/Nippen/Fluke/Motwane or better. (Inspection by representative of Sr. DSTE/CKP)
Supply of Rodometer/Road measuring cycle as Numbers per specification are as under, Mechanical 5 digits counter, ABS Plastic wheel with rubber tyre, measure Forward & Backward, Telescopic handle, Precision measuring wheel with bag.Make: Stanley/Bosch/ JCB/Freeman or better. (Inspection by representative of Sr. DSTE/CKP) Total 288856.00
Item Breakup - A1-Modification / Alteration in existing EI
Alteration /Modification in Existing EI Hot stand Per by system including VDU, MT alteration. function
Modification/Upgradation, wiring, validation & Set alteration of Data Logger/RTU of Digital & Analog Input including NMDL software etc. as per site engineer. The necessary wire from relay to tag block & from tag block to data logger, tag block, terminal, wiring material etc. required for this work to be supplied by contractor. Wire to be procured from RDSO approved firms. NOTE; modification also to be made in COA,Control cum command centre, TMS, Dashboard etc.
Alteration Modification, cable termination, Numbers wiring, testing & commissioning of existing Integrated power supply panel as per approved power supply diagram and specification. The contactor has to supply drawings in tracing paper in the format supplied by railways. Total 2042389.14 CKP-DIVN- S AND T/SOUTH EASTERN RLY
Item Breakup - G1-EI Execution
Installation, wiring, testing (FAT & SAT) and Per commissioning of EI System with 'Hot Standby' Functional architecture as supplied above in 1 above. It Vital Bit includes transportation of material from consignee's depot to the site, erection and grouting of EI Relay Racks, fixing and wiring of all the interfacing relays (Vital & Non-Vital), installation and wiring of Microprocessor equipments, interface equipments, power supply equipments and all other associated accessories to make complete EI system to be functional. Note: (i) Technical Requirements are attached with tender document (ii) Contractor has to arrange simulator /simulation testing panel for testing and commissioning by Selection Table and Square Sheet for each Signalling function.(iii) Installation, wiring, testing and commissioning of EI system will be done by OEM after following all the guidelines/directives issued by RDSO from time to time. (i)For Station with Vital Bit (1 to 150).
Installation, wiring, testing (FAT & SAT) and Per commissioning of EI System with 'Hot Standby' Functional architecture as supplied above in 1 above. It Vital Bit includes transportation of material from consignee's depot to the site, erection and grouting of EI Relay Racks, fixing and wiring of all the interfacing relays (Vital & Non-Vital), installation and wiring of Microprocessor equipments, interface equipments, power supply equipments and all other associated accessories to make complete EI system to be functional. Note: (i) Technical Requirements are attached with tender document (ii) Contractor has to arrange simulator /simulation testing panel for testing and commissioning by Selection Table and Square Sheet for each Signalling function.(iii) Installation, wiring, testing and commissioning of EI system will be done by OEM after following all the guidelines/directives issued by RDSO from time to time. (i)For Station with Vital Bit (151 to 400). Total 1694634.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Annexure-1and2.pdf
ATTACHMENT
Annexure-L.pdf
ATTACHMENT
Annexure-MandN.pdf
ATTACHMENT
Anneure-V.pdf
ATTACHMENT
Annexure-VA.pdf
ATTACHMENT
AnnexureVIA.pdf
ATTACHMENT
Annexure-VI-B.pdf
ATTACHMENT
Annexure-Z.pdf
ATTACHMENT
TENDERFORMFirstSheet.pdf
ATTACHMENT
Gcc 2022
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf Gcc Advance Correction Slip
ATTACHMENT
SpecialConditionsofContract.pdf
ATTACHMENT
ColouredFinal_GCC_April-22_pdf_27.04.22.pdf
ATTACHMENT
GCCAdvanceCorrectionSlipNo.11..pdf
ATTACHMENT
Download all tender documents and submit your bid