Loading…
Loading…
Tender Value
₹1.6 Cr
EMD Value
₹3.2 L
Closing Date
8 Sept 2026, 2:15 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
P3
13 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turn over of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
25 conditions · 4 needing a document upload
(a) If the GST mentioned by tenderer in Remarks column of commercial compliance is not the same as the rate of GST prevailing on the date of tender opening, then the actual GST prevailing as on tender opening date will be applicable. Minimum essential documentations required for supporting the GST claim shall be as per Railway Board's Letter No.2018/CEI/CT/30 Dated:28/06/2023. (b) Tenderers are advised to go through all the uploaded documents with respect to GST,GCC, Tender document & other document if any, before bidding. (c) The Tenderer should quote the All Inclusive Rate taking into consideration, the percentage of GST applicable as on date of Tender opening. The present rate of GST is 5%. Railway will take the actual GST applicable as on date of Tender opening while deriving the basic rate for the item in schedule. (d) All the bidders/Tenderers should ensure that they are GST compliant and that their quoted Tax structure/rate are as per GST Law. GST applicable, if any should be clearly indicated while bidding. (e) In case the successful tenderer is not liable to be registered under CGST/IGST/UTGST/SGST Act, the Railway shall deduct the applicable GST from his/their bills under Reverse Charge Mechanism (RCM) and deposit the same to the tax authority concerned. (f) While claiming the payments, Firm/Contractor shall submit the GSTR1 declaration along with GST invoice, bills and other requisite documentations. The firm should also adopt the Invoice Number and date indicated in GSTR1 in GST invoice being submitted for payment. The firm's bill will be passed by RWP only on the production of GSTR1 submitted by Firms along with GST invoice and other requisite documents
The Railway reserves the right to get the documents verified on its own. The Railway also reserves the right to consider the firm's performance available with RWP
The Railway Material shall be transported at Carrier's Risk and cost. To cover the transit risk of the item handed over, the transporter shall take all steps as deemed appropriate by him.
LOA/Agreement will be issued with the derived Basic Unit Rate per MT Per KM(up to TWO decimals without any rounding off), which is derived from the quoted All Inclusive Rate for tendered quantity, considering the prevailing rate of GST at the time of tender opening and applicable distance in Kms.
Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
SPECIAL CONDITIONS
The Trucks which have All India Permit need to be deployed and should be readily available and supplied/deployed on demand within 48 Hours for the quantity demanded by the nominated officials of RWP/Bela, failing which a penalty of Rs.1500-00 (Rupees One Thousand Five Hundred only) per day per Truck will be levied and recovered from the Contractor's bill for delay in supply/ deploymnet of Trucks as demanded.
(1)PERFORMANCE GUARANTEE (PG) & SECURITY DEPOSIT (SD): An amount equivalent to 5% (five percent) of total contract value is applicable for PG & SD. (2)INDEMNITY BOND: An amount equivalent to 10% (ten percent) of the material cost of total contract quantity is applicable.
OPTION CLAUSE: RWP reserves the right to: (1) Increase/decrease the awarded contract quantity by up to 25% (2) Increase the Contract Quantity beyond 125% and up to 150%. (3) Increase the quantity beyond 150% & up to 200% of contract quantity, under exceptional circumstances, with the approval o f Railway's Competent Authority duly extending the currency of the contract, if any. (4) Extend the currency of the contract to facilitate operation of additional quantities upto an additional period of 12(Twelve) months.
Necessary labour charges, transhipment charges, toll charges, if any and all other such expenses including Transit Insurance charges, if any, are to be borne by the contractor.
Organization setup:- Tenderer should submit complete set up of organization, the break-up of type of employees like supervisors, helpers, etc.
Declaration:- Tenderer shall furnish confirmation regarding Employment, Partnership, etc. of Retired Railway Employees(for more details refer to tender document, GCC & GCC - 2022).
Undertaking :- Tenderer Should submit a declaration that they will arrange for deployment (Lorry/Truck/Trailer/containers etc.) as and when demanded by RWP at Short Notice.
All other Terms & Conditions will be applicable as per the uploaded Bid document and Indian Railways Standard General conditions of contract for Works including Advance Correction Slips (ACS) issued up to the date of closing of this tender.
CURRENT PANEL OF IBA : Applicable as per Bid Document.
The Tenderer should indicate the applicable Rate of GST in the remark column.
EMD:- EMD PAYMENT AGAINST THE SUBJECT TENDER IS MANDATORY UNLESS THEY ARE EXEMPTED.
Splitting of the Tendered quantity shall be as per Clause of Special conditions of Bid document (attached).
FORMAT FOR CERTIFICATE TO BE SUBMITTED/UPLOADED BY TENDERER ALONG WITH THE TENDER DOCUMENT SHALL BE AS P E R ANNEXURE-V & CERTIFICATE TO BE GIVEN BY ATTORNEY/AUTHORISED SIGNATORY/EACH MEMBER OF PARTNERSHIP FIRM/JOINT VENTURE(JV)/HINDU UNDIVIDED FAMILY(HUF)/LIMITED LIABILITY PARTNERSHIP(LLP) etc. ,SHALL BE AS PER ANNEXURE-V(A).
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
The GCC, April 2022 & Advance Correction Slips can be accessed through the path:www.indianrailways.gov.in / railwayboard>>"About Indian Railways">>"Railway Board Directorates">>"Civil Engineering">>"Worksprogramme, works contracts & arbitration and other related circulars">>"Contracts & Arbitration Circulars">>"Letters".
Transportation of Finished Railway Wheel from Rail Wheel Plant, Vill:-Bela, PO Arvind Nagar, Dist-Saran, Bihar to Various units of Indian Railway under distance slab for 501-1000 KM (taking average lead distance 750 KM).
S_RWP_WH_DIS_25-26_02A~RWP
S_RWP_WH_DIS_25-26_02A
Open
Works - General
12 Months
Saran, Bihar
₹0
₹3.2 L
8 Sept 2026
17 Aug 2026
25 Aug 2026
1 item across 1 schedule · ₹1,60,28,160 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Transportation of Finished Railway Wheel from Rail Wheel Plant, Vill:-Bela, PO Arvind Nagar, Dist-Saran, Bihar to Various units of Indian Railway under distance slab for 501-1000 KM (taking average lead distance 750 KM). | Per MT Per KM | 6261000.00 | 2.56 | 1,60,28,160 |
| Schedule total | ₹1,60,28,160 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC 2022
ATTACHMENT
AdvanceCorrectionSlip01TO11.pdf Correction Slip in GCC 2022
ATTACHMENT
REVISED BID DOCUMENT
ATTACHMENT
Tenderdocument500-1000KM_1.pdf
ATTACHMENT
GCC_IndianRailways-April-2022.pdf
ATTACHMENT
AdvanceCorrectionSlip01TO11.pdf
ATTACHMENT
Tenderdocument500-1000KM_1.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .