| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAccepted-AOC | ₹2.3 Cr | L1 | Accepted-AOC L1 price accepted by the committee |
| 2 | L2₹4.0 Cr+₹1.7 Cr (73.1%)Rejected-Finance | ₹4.0 Cr+₹1.7 Cr (73.1%) | L2 | Rejected-Finance Rejected. The
bidder is not
L1 |
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
14 Nov 2024, 3:00 pmClosed
General Manager Contracts
Engineering Projects India Ltd Southern Regional Office 3D EC Chambers 92 GN Chetty Road Thiyagarayar Nagar Chennai 600 017
Piling work for the project of Provision of Administrative and Logistic Infrastructure under Wp-07 and Wp-5b At Naval Station Rambilli Visakhapatnam package 02
2024_EPI_213374_1
SRO/CON/ETS/261
Open Tender
Civil Works
Works
180 days
Rambilli Visakhapatnam
As per NIT
7 documents required · 7 mandatory
₹2,360
Engineering Projects (India) Ltd.
₹3.9 L
6 Dec 2024
4 Nov 2024
15 Nov 2024
4 Nov 2024
14 Nov 2024
4 Nov 2024
4 Nov 2024 - 14 Nov 2024
PILING WORK Boring, providing and installation bored cast-in-situ reinforced cement concrete piles of garde M-40 (Minimum cement content -as per design mix ) of specified diameter and length below pile cap, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and temporary casing of appropriate length for setting out and removal of same and the length of the pile to be embedded in the pile cap etc. by Crawler mounted, telescopic boom hydraulic pilling Rig all complete, including removal of excavated earth with all its lifts and leads (length of pile for payment shall be measured up to bottom of pile cap). Note:(i)Truck Mounted rotary/TMR/Tube well boring machine shall not be used. (ii) Piles are to be founded with a socketting legth of 2D into the appropriate strata Note: Design Mix approval shall be obtained by EPI. However RMC supply scope is with bidder. Thesource of RMC is as follows: 1) Ultratech RMC atchuthapuram 2) Sravani RMC , Atchuthapuram , base rate for M-40 is Rs . 6400.00 3) trimme pile is under bidder scope 4) the wastage of concrete shall not be separately 5) Breakig first 1.2 m depth / depth specified by DGNP is under the scope of the bidder.
500mmdia piles
600 mm dia piles
800mm dia pile
900mm dia pile
1000mm dia pile
Steel Reinforcement for RCC work including straightening , cutting, bending and placing in position and binding all complete.
labour charge for Fabrication, cutting , pending laying , making the pile reinforcement gauge and erection reinforcement gauge inclduing cover block , tie bars, binding wire etc ( exluding cost of reinforcement Steel ) Unit of measurement in kgs
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submitt the design of loading platform for the approval of Engineer-in-charge. Single pile above50 tonne and upto 150 tonne Safe capacity
Initial test (Test Load 2.5 times the Safe capacity)
Routine test (Test Load 1.5 times the Safe capacity)
Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge/Anchor piles method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. Note: 1. Initial and Routine Load Test shall not be carried out by Dynamic method of testing. Note: 2. Testing agency shall submitt the design of loading platform for the approval of Engineer-in-charge. Single pile above50 tonne and upto 150 tonne Safe capacity
Initial test (Test Load 2.5 times the Safe capacity)
Routine test (Test Load 1.5 times the Safe capacity)
Conducting routine vertical load test for 1.5 times safe load carrying capacity by means of High Strain Dynamic Load Test including provision and erection of crane- hammer-drop mechanism, acceleration and displacement velocity transducers to record both force and velocity including excavation, dewatering, preparation of pile head including building up of pile, additional reinforcement if any etc. all complete as per approved method (ASTM D4945-89), submission of test report, specifications and instructions of the Engineer for piles of following diameter :
500 mm & 600 MM dia
800 mm, 900 & 100 Dia
Lateral load testing of single pile in accordance with IS Code of practice IS : 2911 (Part IV) for determining safe allowable lateral load on pile :
Upto 50 tonne capacity pile
Above 50 tonne and upto 100 tonne capacity pile
Integrity testing of Pile using Low Strain/ Sonic Integrity Test/ Sonic Echo Test method in accordance with IS 14893 including surface preparation of pile top by removing soil, mud, dust & chipping lean concrete lumps etc. and use of computerised equipment and high skill trained personal for conducting the test & submission of results, all complete as per direction of Engineer-in- charge.
Conducting cross-hole test in Bored Cast In-situ piles through 50 mm diameter PVC pipes shall be embedded (minimum numbers of pipes are indicated against each diameter of piles) during the construction, including cleaning the PVC pipes, supply of testing equipment and approach, carrying out the test by a qualified and experienced personnel, interpretation of results, submission of test reports complete in all respects as directed by the Engineer, for pile having diameter of: Note:- The Test to be conducted within 3 day from the date of installation of pile otherwise payment shall not be made under this item. It shall be paid under item 2.9.6
500 mm-(minimum 3 Numbers PVC pipes to be embedded)
600 mm-(minimum 4 Numbers PVC pipes to be embedded)
800 mm-(minimum 5 Numbers PVC pipes to be embedded) ( the same applicable for 900 mm or 1000 mm dia)
Conducting standard penetration tests as per IS: 2131 through pipe in all types of soil during boring only for such piles as directed, all as specified at every one metre interval, 16 m onwards from existing ground level and recording accurately the penetration.
Fabrication , Erection and Driving of 6mm / 8mm thick liner maximum upto 8.00m depth for any dia unsign rigs, cranes and including all tool and tackles. Liner material will be supplied by EPI
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .