Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹1.6 L+₹4,850 (3.03%)Rejected-Finance | L2 | Rejected-Finance REJECT |
Tender Value
₹1.4 L
EMD Value
₹2,981
Closing Date
22 Sept 2020, 3:00 pmClosed
EXECUTIVE ENGINEER
28 PARK ROAD AMBALA CANTT
KAMBAS laying of D I w s pipe lines in balance streets and providing balance FHTC of District Ambala Under JJM Laying of distribution system and providing balance FHTC and all other works contingent there to
2020_HRY_144041_1
DNIT NO. 3423 DATED 03/09/2020
Open Tender
Civil Works
Works
60 days
KAMBASS
KAMBAS laying of D I w s pipe lines in balance streets and providing balance FHTC of District Ambala Under JJM Laying of distribution system and providing balance FHTC and all other works contingent there to
2 documents required · 2 mandatory
₹500
Engineer in Chief
₹2,981
Yes
14 Oct 2020
14 Sept 2020
22 Sept 2020
14 Sept 2020
22 Sept 2020
14 Sept 2020
Amount
Providing , laying, jointing, testing and commissing of G.I pipe class-II medium duty including cost of specials ( i.e elbow , Union, nipple , socket) complete in all respect and the entire satisfaction of Engineering-in-charge (make Jindle/Parkash/ Tata) complete in all respect. a) 15mm i/d.
Providing and fixing in position 15mm i/d G.M bib cock ISI marked to the satistafction of Engneeri-in-Charge.
Bidder Name
Amount
Sanjeev Kumar Contractor
KUNWARDEEP SINGH CONTRACTOR
KUNWARDEEP SINGH CONTRACTOR
KUNWARDEEP SINGH CONTRACTOR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .