| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LRejected-Finance | ₹3.7 L | L1 | Rejected-Finance As Per the TEC, The justification submitted by the bidder for ALB appears to be unclear and inadequate in substantiating the quoted rates. |
| 2 | L2₹4.0 L+₹26,769.71 (7.26%)Rejected-Finance | ₹4.0 L+₹26,769.71 (7.26%) | L2 | Rejected-Finance As per the TEC the bid has been marked as ALB.No detailed explanantion recieved within stipulated time. |
| 3 | L3₹4.1 L+₹45,601.86 (12.4%)Rejected-Finance AT GORUAL PO GORUAL PS BRAHMAGIRI DIST PURI PIN 752002 | PURI | PURI | ODISHA | 752002 | ₹4.1 L+₹45,601.86 (12.4%) | L3 | Rejected-Finance As per the TEC the bid has been marked as ALB.No detailed explanantion recieved within stipulated time. |
| 4 | L4₹4.4 L+₹72,929.26 (19.8%)Rejected-Finance | ₹4.4 L+₹72,929.26 (19.8%) | L4 | Rejected-Finance As per the TEC the bid has been marked as ALB.No detailed explanantion recieved within stipulated time. |
| 5 | L5₹4.8 L+₹1.1 L (30.7%)Rejected-Finance | ₹4.8 L+₹1.1 L (30.7%) | L5 | Rejected-Finance As per the TEC the bid has been marked as ALB.No detailed explanantion recieved within stipulated time. |
| Sl No | Description | Qty | Unit | RAMAKANTA BISWAL L3 | Tapan Mahapatra L7 | SIMASINI MOHANTY L7 | MADHUSMITA PAIKARAY L1 | JHARANA DAS L2 | JHADESWARI INFRA AND DEVELOPERS PRIVATE LIMITED L4 | NAKUL SOLPADIA L6 | SUVASHRI JOGALAXMI L8 | ISWAR BEHERA L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Site clearance & approach road for construction work etc completed as per direction of E.I.C | 200 | Sqm. | 1.89 ₹378 | 2.26 ₹452 | 2.26 ₹452 | 1.68 ₹336 | 1.8 ₹360 | 1.58 ₹316 Lowest | 2.21 ₹442 | 1.58 ₹316 Lowest | 2.86 ₹572 |
| 2.00 | Drilling a perfectly vertical bore hole of 125/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | 100 | Mtr. | 429.07 ₹42,907 | 513.5 ₹51,350 | 513.5 ₹51,350 | 383.5 ₹38,350 | 409.56 ₹40,956 | 450 ₹45,000 | 504.4 ₹50,440 | 494 ₹49,400 | 350 ₹35,000 Lowest |
| 3.00 | Lowering of 125mm dia blank PVC pipe 80 Sch. without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 88 | Mtr. | 701.82 ₹61,760.16 | 839.93 ₹73,913.84 | 839.93 ₹73,913.84 | 627.17 ₹55,190.96 Lowest | 669.92 ₹58,952.96 | 1,000 ₹88,000 | 825.04 ₹72,603.52 | 893 ₹78,584 | 700 ₹61,600 |
| 4.00 | Lowering of 125mm dia blank PVC pipe 80 Sch. with 3 mtr slot in perfectly vertical position including cost of pipes etc complete | 12 | Mtr. | 709.41 ₹8,512.92 | 849.01 ₹10,188.12 | 849.01 ₹10,188.12 | 633.66 ₹7,603.92 Lowest | 677.16 ₹8,125.92 | 980 ₹11,760 | 833.96 ₹10,007.52 | 860 ₹10,320 | 700 ₹8,400 |
| 5.00 | Operation of Compressor for development of T/W | 2 | Nos. | 2,317.61 ₹4,635.22 | 2,773.69 ₹5,547.38 | 2,773.69 ₹5,547.38 | 2,071.49 ₹4,142.98 | 2,212.28 ₹4,424.56 | 250 ₹500 Lowest | 2,724.53 ₹5,449.06 | 2,809 ₹5,618 | 3,000 ₹6,000 |
| 6.00 | Supplying and fittingWell Cap 5" Dia | 2 | Nos. | 660.1 ₹1,320.2 | 790 ₹1,580 | 790 ₹1,580 | 590 ₹1,180 | 630.1 ₹1,260.2 | 500 ₹1,000 Lowest | 776 ₹1,552 | 790 ₹1,580 | 700 ₹1,400 |
| 7.00 | Providing and fixing of Bell plug | 2 | Nos. | 660.1 ₹1,320.2 | 790 ₹1,580 | 790 ₹1,580 | 590 ₹1,180 Lowest | 630.1 ₹1,260.2 | 1,585 ₹3,170 | 776 ₹1,552 | 790 ₹1,580 | 700 ₹1,400 |
| 8.00 | Dismantling of cement concrete including stacking the useful material for reuse and removing the debris within 50.0m lead etc completed as per direction of E.I.C | 0.36 | Cum. | 578.99 ₹208.44 | 692.96 ₹249.47 | 692.96 ₹249.47 | 517 ₹186.12 Lowest | 552.69 ₹198.97 | 620 ₹223.2 | 680.67 ₹245.04 | 693 ₹249.48 | 8,776 ₹3,159.36 |
| 9.00 | Earth work excavation in stoney earth or gravely soil mixed boulder not exceeding 0.014 cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm etc. completeetc completed as per direction of E.I.C | 30.08 | Cum. | 291.22 ₹8,759.9 | 348.52 ₹10,483.48 | 348.52 ₹10,483.48 | 260 ₹7,820.8 | 277.98 ₹8,361.64 | 214 ₹6,437.12 Lowest | 342.34 ₹10,297.59 | 349 ₹10,497.92 | 250 ₹7,520 |
| 10.00 | Earth work excavation in stoney earth or gravely soil mixed boulder not exceeding 0.014 cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm etc. completeetc completed as per direction of E.I.C. 2nd depth of 1.5 m (1.5 m to 3.0 m depth) | 9.42 | Cum. | 459.08 ₹4,324.53 | 549.42 ₹5,175.54 | 549.42 ₹5,175.54 | 410 ₹3,862.2 | 438.21 ₹4,127.94 | 220 ₹2,072.4 Lowest | 539.68 ₹5,083.79 | 556 ₹5,237.52 | 600 ₹5,652 |
Tender Value
Refer Docs
EMD Value
₹6,300
Closing Date
6 Jun 2026, 5:00 pmClosed
Deputy Director (Geology)
Deputy Director Geology, GWD Division-II, Bhubaneswar AT-A/2, UNIT-V, BHUBANESWAR -751001
Installation of 02(Two) no of ROOF TOP RAIN WATER HARVESTING STRUCTURES Under CHHATA Scheme at Puri Urban Area under Puri District During FY-2026 -27
2026_GWSI_129689_1
01/GWRSD/CHHATA/2026-27
Open Tender
Civil Works - Others
Item Rate
60 days
PURI URBAN
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹6,300
Yes
14 Aug 2026
26 May 2026
8 Jun 2026
26 May 2026
6 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance & approach road for construction work etc completed as per direction of E.I.C | - | Sqm. | 2.86 | - |
| 2 | Drilling a perfectly vertical bore hole of 125/100mm dia in hard rock formation as required to the site condition as per direction including cost of acssesories,tools & plants,consumables & rig charges etc. complete | - | Mtr. | 650 | - |
| 3 | Lowering of 125mm dia blank PVC pipe 80 Sch. without 3 mtr slot in perfectly vertical position including cost of pipes etc complete | - | Mtr. | 1,063.2 | - |
| 4 | Lowering of 125mm dia blank PVC pipe 80 Sch. with 3 mtr slot in perfectly vertical position including cost of pipes etc complete | - | Mtr. | 1,074.7 | - |
| 5 | Operation of Compressor for development of T/W | - | Nos. | 3,511 | - |
| 6 | Supplying and fittingWell Cap 5" Dia | - | Nos. | 1,000 | - |
| 7 | Providing and fixing of Bell plug | - | Nos. | 1,000 | - |
| 8 | Dismantling of cement concrete including stacking the useful material for reuse and removing the debris within 50.0m lead etc completed as per direction of E.I.C | - | Cum. | 877.16 | - |
| 9 | Earth work excavation in stoney earth or gravely soil mixed boulder not exceeding 0.014 cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm etc. completeetc completed as per direction of E.I.C | 1 | Cum. | 441.17 | ₹440.73 |
| 10 | Earth work excavation in stoney earth or gravely soil mixed boulder not exceeding 0.014 cum within 50m initial lead & 1.5m initial lift including rough dressing & breaking clods to minimum 5cm to 7cm etc. completeetc completed as per direction of E.I.C. 2nd depth of 1.5 m (1.5 m to 3.0 m depth) | 1 | Cum. | 695.47 | ₹694.77 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
finance_592368.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.26 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_592368.xls
BOQ • 0.30 MB
TENDERDOCUMENT01.pdf
Tender Documents • 1.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .