Tender Value
₹3.0 Cr
EMD Value
₹2.5 L
Closing Date
21 Aug 2026, 4:00 pmClosed
Additional Chief Engineer (P&C)
Design, engineering, manufacturing, supply, erection, testing & commissioning of 01Nos. of 220/132kV 150MVA Transformer No-5 Bay at 400kV Asoj ss under Jambuva circle on EPC basis excluding Civil works.
328095
ACE(P&C)/Contract/TRB/220/132KV/Asoj S/S /E-498
Open
Electrical Works
Works
Vadodara
28 documents required · 21 mandatory · 7 optional
₹8,850
Gujarat Energy Transmission Corporation Vadodara
₹2.5 L
30 Jul 2026
30 Jul 2026
30 Jul 2026
21 Aug 2026
30 Jul 2026
Seal & Signature of Bidder
CLAUSE TITLE PAGE
TENDER SPECIFICATION NUMBER
NOTICE INVITED TENDER
[I] GENERAL CONDITION OF CONTRACT (GCC)
1 GENERAL PARTICULARS
2 SCOPE OF THE PROPOSAL AND WORK
3 BIDDING COSTS
4 DETAILS OF DOCUMENTS
5 KNOWING THE BID DOCUMENTS
6 CLARIFICATIONS ON BID DOCUMENTS
7 AMENDMENT OF BIDDING DOCUMENT
8 LANGUAGE OF BID
9 LOCAL CONDITIONS
10 DOCUMENTS COMPRISING THE BID
12 BID SECURITY/EMD
13 FORMAT OF BID
14 SIGNATURE OF BIDS
15 SEALING AND MARKING OF BIDS
16 DEADLINE FOR SUBMISSION OF BIDS
18 MODIFICATION AND WITHDRAWAL OF BIDS
19 INFORMATION REQUIRED WITH THE PROPOSAL
20 OPENING OF BIDS BY OWNER
21 PURPOSE OF EVALUATION OF BIDS
22 POLICY FOR BIDS UNDER CONSIDERATION
23 PRELIMINARY EXAMINATION
24 AWARD CRITERIA
Seal & Signature of Bidder
25 OWNER’S RIGHT TO ACCEPT ANY BID AND TO
REJECT ANY OR ALL BIDS
26 NOTIFICATION OF AWARD
27 SIGNING OF CONTRACT
28 DEFINITION OF TERMS
31 LANGUAGE AND MEASURES
33 TAXES AND DUTIES
34 TAXES, PERMITS & LICENCES
35 PRICE INCLUSIONS (INCLUDING TAXES &
36 CONTRACT PERFORMANCE GUARANTEE
38 PERFORMANCE GUARANTEE
39 TIME SCHEDULE
40 TIME – THE ESSENCE OF CONTRACT
41 PENALTY FOR DELAY
42 DELAYS BY OWNER OR HIS AUTHORISED
43 PRESENTATION OF BILLS
45 PAYMENT SCHEDULE
46 DEDUCTIONS FROM CONTRACT PRICE
47 TERMS OF PAYMENT
48 TAKING DELIVERY AND INSURANCE
50 CONTRACT QUALITY ASSURANCE
51 ERECTION TOOLS AND TACKLES
53 CONTRACT DOCUMENTS
54 USE OF CONTRACT DOCUMENTS AND
55 CONSTRUCTION OF THE CONTRACT
56 JURISDICTION OF CONTRACT
Seal & Signature of Bidder
57 EXECUTION OF CONTRACT
58 ENFORCEMENT OF TERMS
59 COMPLETION OF CONTRACT
60 REPLACEMENT OF DEFECTIVE PARTS AND
61 PATENT RIGHTS AND ROYALTIES
62 DEFENCE OF SUITS
63 LIMITATION OF LIABILITIES
64 ENGINEER’S DECISION
65 POWER TO VARY OR OMIT WORK
66 ASSIGNMENT AND SUB-LE TTING OF CONTRACT
67 CHANGE OF QUANTITY
68 PACKING, FORWARDING AND SHIPMENT
69 COOPERATION WITH OTHER CONTRACTORS
AND CONSULTING ENGINEERS
70 NO WAIVER OF RIGHTS
71 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER
AND LIABILITY OF THE CONTRACTOR
72 PROGRESS REPORTS
74 RISK DISTRIBUTION-TRANSFER OF TITLE
75 LIABILITY FOR ACCIDENTS AND DAMAGES
76 DEMURRAGE, WHARFAGE, ETC
77 FORCE MAJEURE
78 SUSPENSION OF WORK
79 CONTRACTOR`S DE FAULT
80 TERMINATION OF CONTRACT ON OWNER`S
81 FRUSTRATION OF CONTRACT
82 GRAFTS AND COMMISSIONS ETC.
83 SETTLEMENT OF DISPUTES
85 RECONCILIATION OF ACCOUNTS
87 TERMINATION OF CONTRACT
88 TO CANCEL THE CONTRACT
Seal & Signature of Bidder
89 MATCHING END COST
GENERAL INFORMATION (TECHNICAL) 54-59
[II] ERECTION CONDITIONS OF CONTRACT
2 REGULATION OF LOCAL AUTHORITIES AND
3 OWNER’S LIEN ON EQUIPMENT
4 ACCESS TO SITE AND WORKS ON SITE
5 CONTRACTOR’S SITE ESTABLISHMENT
6 CO-OPERATION WITH OTHER CONTRACTORS
7 DISCIPLINE OF WORKMEN
8 CONTRACTOR’S FIELD OPERATION
9 PROGRESS REPORT
10 MAN-POWER REPORT
11 PROTECTION OF WORK
12 EMPLOYMENT OF LABOUR
13 FACILITIES TO BE PROVIDED BY THE OWNER
14 FACILITIES TO BE PROVIDED BY THE
15 LINES AND GRADES
16 FIRE PROTECTION
18 PRE-COMMISSIONING TRIALS AND INITIAL
19 MATERIALS HANDLING AND STORAGE
20 CONSTRUCTION MANAGEMENT
21 FIELD OFFICE RECORDS
22 CONTRACTOR’S MATERIALS BROUGHT TO SITE
23 PROTECTION OF PROPERTY AND CONTRACTOR’S
Seal & Signature of Bidder
25 UNFAVOURABLE WORKING CONDITIONS
26 PROTECTION OF MONUMENTS AND REFERENCE
27 WORK & SAFETY REGULATIONS
28 CODE REQUIREMENTS
Seal & Signature of Bidder
CLAUSE TITLE PAGE
[III] SPECIAL CONDITIONS OF CONTRACT (SCC)
1 GENERAL PARTICULARS
3 EARNEST MONEY DEPOSIT (EMD)
4 DECLARATION BY BIDDER
5 QUALIFYING REQUIREMENT
6 ADDITIONAL DOCUMENTS
7 COMPLETION PERIOD
8 INSTRUCTIONS BEFORE SUBMITTING YOUR BID.
9 ADDENDUM TO THE TECHNICAL SPECIFICATIONS.
10 SPECIAL NOTES
12 PROGRESS REPORT
13 BIDDER’S RESPONSIBILITY
15 CLERIFICATION
19 PERFORMANCE BANK GUARANTEE
PERFORMAS, CERTIFICATES, SCHEDULES & DETAILS 77-121
CERTIFICATE OF TECH.COMPLIANCE
CONTRACT AGREEMENT
BANK GUARANTEE FOR EMD
PERFORMANCE BANK GUARANTEE
INDEMINITY BOND
A/T ACCEPTANCE LETTER
SAFETY CHECK LIST
CONFIRMATION DETAILS OF BIDDER
COMPLETION PERIOD
FINANCIAL CAPABILITY
LATEST INCOME TAX CLEARANCE CERTIFICATE
MEMORANDUM/ARTICLES OF ASSOCIATION
DETAILS OF HUMAN RESOURCES
DETAILS OF FIRM
Seal & Signature of Bidder
NOTICE INVITING TENDER
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
RACE COURSE, VADODARA - 390
The ACE (Procurement & Contracts) GETCO for and on behalf of Gujarat Energy
Transmission Corporation Ltd., having its Corporate Office at Sardar Patel Vidyut Bhavan,
Race Course, Vadodara – 390 007, hereafter called as “GETCO”, intends to invite Tender
for Design, engineering, manufacturing, supply, erection, testing & commissioning of
01Nos. of 220/132kV 150MVA Transformer No-5 Bay at 400kV Asoj ss under Jambuva
circle on EPC basis excluding Civil works..as per tender specifications.
ACE(P&C)/Contract/TRB/220/132KV/Asoj
Design, engineering, manufacturing,
supply, erection, testing & commissioning of
2 Name of Work 01Nos. of 220/132kV 150MVA Transformer
No-5 Bay at 400kV Asoj ss under Jambuva
circle on EPC basis excluding Civil works.
3 Time Period 15(Fifteen) Months from date of LOA
8,850.00 ( Including GST)
4 Tender Fee in Rs. (non refundable) Payment of tender fee accepted by
CASH/RTGS/NEFT/online Only
Estimated Cost including GST in Rs.
6 Earnest Money Deposit amount Rs. Payment of EMD accepted by
RTGS/NEFT/online only
On line (E-tendering) tender/ offer
7 submission last date up to 16.00 21-08-2026
hours only (This is mandatory)
Physical submission of all the
relevant documents, last date up to
15.00 hours. By RPAD or SPEED No physical submission
Date of opening of Tender fee, EMD
9 cover and QR bid physical as well 21-08-2026
as on – line opening at 16.01 Hours.
10 Date of opening of Price Bids: Shall be intimated separately.
on firm basis except PV applicable for supply of
11 Prices substation structure materials (including nut-
180 Days from the date of Opening of
13 Type of Tender Item Rate Basis
Additional Chief Engineer (Procurement & Contracts)
Seal & Signature of Bidder
GENERAL TERMS AND CONDITION OF CONTRACT
1.0 General Particulars
The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘GETCO’/ ‘OWNER’
intends to receive bids Design, engineering, manufacturing, supply, erection, testing &
commissioning of 01Nos. of 220/132kV 150MVA Transformer No-5 Bay at 400kV Asoj ss under
Jambuva circle on EPC basis excluding Civil works. as per detailed in the accompanying
specifications in accordance with Terms and Conditions herein. The bids shall be prepared and
furnished as per these Instructions.
2.0 Scope of the proposal and Work
2.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility,
completely covering all the equipments and installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein
the following:-
a) Detailed Design, Engineering and detailed calculation.
b) Complete manufacture including shop testing.
c) Providing engineering drawings, data, operation manual, etc for the Owner’s approval.
d) Packing and transportation from the manufacturer’s works to the Site.
e) Receipt storage, preservation and conservation of equipment & at the Site.
f) Pre-assembly, if any, insurance, erection, testing and commissioning of all the
equipments/accessories etc.
g) Reliability tests and performance guarantee tests on completion of commissioning.
2.2 No deviation whatsoever to certain conditions of the bidding documents permitted by the
Owner and therefore, the Bidders are advised that while making Bid Proposals and quoting
prices these conditions may appropriately be taken into consideration. Bidders are required
to furnish a certificate in this regard as per the format provided in Special Conditions of
Contract in a separate sealed envelope containing Bid security, which shall accompany the
Technical Bid. Any Bid not accompanied by such certificate shall be rejected by the
Owner and shall not be opened.
2.3 Bids not covering the above cited entire scope of works may be treated as incomplete and
hence rejected.
2.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
Technical Data Sheets and specified elsewhere. The Qualifying Data should be filled in the
required schedule of Bid Proposal Sheets.
2.5 This specification covers the detailing, designing, engineering, manufacturing, testing at works,
packing, supply, storage, insurance and handling at site, erection, testing, commissioning and
handing over in ready to switch on condition to GETCO of complete equipments/ accessories
of 220/132kV TR bay work as stated below at 400kV Asoj on EPC basis excluding all civil
The work includes Design, engineering, manufacturing, supply, erection, testing & commissioning
of 01Nos. of 220/132kV 150MVA Transformer No-5 Bay at 400kV Asoj ss under Jambuva circle on
EPC basis excluding Civil works.as stated hereunder & detailed in the Schedules so as to complete
the project as per approved bill of quantities and layout drawings.
Seal & Signature of Bidder
( I ) Scope of work : ( Electrical)
Design, engineering, manufacture, testing, supply to destination site basis, including
transportation & insurance, storage, erection, testing & commissioning of the following
equipments/items, conductors, insulators & all necessary hardware, clamp connectors etc
complete in all respects for the followings;
A. 220/132KV Switch Yard (400KV Asoj S/S )
220/132kV equipments, Isolators, LAs, BPIs, HBPIs, CBs, CTs for
- 220/132kV Transformer Bay : 01 Nos.
Complete Sub-Station automation including hardware & software for local control station
along with associated equipments as defined in tech specifications.
(B) Other activities for 220/132kV Sub-Station.
(i) Complete relay & protection system including design, engineering, calculations etc.
(ii) Air conditioning system – For control room (split A/C )
(iii) LT Switchgear (A/C & D/C Distribution board)
(iv) Batteries & battery chargers for
(v) Control Cables
(vi) Fire detection & Alarm system for Building
(vii) Mandatory Spares
- As specified in BOQ & tech specification part –II.
(viii) Other associated equipments, accessories etc. as per layout.
(ix) Structures:
G.I. Lattice structure drawings for 220/132//66 KV gantry structures (Towers & Beams),
Equipment structures (whose drawings are available with GETCO) Drawings will be
supplied by GETCO & to be erected as per GETCO’s standard drawing, given to successful
bidder including, transportation, handling, storage, insurance & erection.
Design of structure (Whose Drawings are not available with GETCO) to suit the equipments
being supplied by bidder is to be carried out according to base dimension of foundation
standardized by ‘GETCO’ for 220Kv ,132kv & 66kV which will be given to successful bidder.
a) Complete Earthing system including Earth mat. and protection against direct
stroke of lightning.
b) Execution of earthing work includes supply of all earthing materials.
a) Yard Lighting of the switchyard.
b) Illumination design to be done as per CBIP manual.
c) Illumination of CR building.
d) Scope is as per BOQ & Specifications as per Part –II
e) This is being an EPC project therefore any item , accessories, work etc required for
completion and successful operation of entire project shall be considered in the
Seal & Signature of Bidder
Contractor has to provide all engineering drawings, data calculations etc for owners
approval as specified in part –I, GCC, general Information. (Tech) – Clause No.
2.6 PROJECT PARTICULARS
Name of the Project: 220/132KV Transformer bay at 400KV Asoj
2.8 SYSTEM DATA
Project Particulars 400KV Asoj
1 System Voltage 220/132 kv
2 System of Earthing Solidly Earthed
3 Rated frequency 50 HZ ± 5%
4 Control voltage 110 V DC ± 10%
5 Average Soil resistivity 05 Ohm-Meter
6 Location Kumetha
Nearest Railway station Vadodara
Nearest Airport Vadodara
Latitude 22.369186”
Longitude 73.262618"
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/
liable for these costs irrespective of the course and conclusion of this Bidding.
4.0 BID DOCUMENTS
Details of Documents
The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of
a. General Conditions of Contract (GCC-Part I)
b. Erection Conditions of Contract (ECC-Part I)
c. Special Conditions of Contract (SCC-Part I)
d. Technical Specifications (TSP-Part II – Electrical)
5.0 Knowing the Bid Documents
5.1 Every intending Bidder has to examine and understand all instructions, forms, terms,
conditions and specifications in the Bid Documents and fully know himself all the conditions
and contents therein, which may in any manner, affect the scope & content of work and the
costs thereof. Submission of a Bid not substantially responsive to the Bid Document in all
respects and/or failure to furnish all information required by the Bid Document may entail
rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and
specifications or is in doubt as to the true meaning of any part, he shall make a request, in
writing not later than one week before the date of submission of bid, to the owner in triplicate.
The owner will issue explanations, interpretations and clarifications as deemed fit in writing
as a response to this request. On receipt of such interpretations/clarifications, the Bidder
may submit his Bid within the date and time stipulated in the Bid invitation, All such
explanations, interpretations and clarifications from the Owner shall be deemed as part of
Bid Documents and shall invariably accompany the Bidder’s proposal.
Seal & Signature of Bidder
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s)
or his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document:
At any time prior to the deadline for submission of Bids the Owner may, for any reason,
whether at his own initiative or in response to a clarification requested by the intending
Bidder, modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have
received the Bidding Document at the address contained in the letter of request for issue of
Bidding document from the Bidders. Owner will bear no responsibility or liability arising out
of non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into
account in preparing their bids, the Owner may, at his discretion, extend the deadline for
the submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose such
documents as a part of the bid.
8.0 PREPARATION OF BIDS
Language Of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided
that any printed literature furnished by the Bidder may be written in another language so
long as accompanied by an English translation of its pertinent passages. Failure to comply
with this may disqualify a bid. For purposes of interpretation of the bid, the English
translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. verbatim without
adding any printed/typewritten text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors
which may have any effect on the execution of the Contract covered under these documents
and specifications. The Owner shall not entertain any request for clarifications from the
bidders, regarding such local condition
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting the proposals. No claim for financial adjustment to the Contract
awarded under these specifications and documents will be entertained by the owner.
Neither any change in the time schedule of the Contract nor any financial adjustments
arising thereof shall be permitted by the Owner, which are based on the lack of such clear
information or its effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
Requirements etc. furnished in the Bidding Documents, indicating, for the goods to be
supplied and services to be rendered, a brief description of goods and services, quantity
Seal & Signature of Bidder
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Special Conditions of Contract and GCC.
10.3 All Tender Documents/ formats are to be returned completed in all respects and signed by
the Company Authorized Signatory wherever specified.
All Bid documents duly signed & sealed shall be submitted with technical bid.
10.4 The Bid Guarantee shall be furnished in a separate cover in accordance with clause at
11.0 Bid Price:
Destination prices for Goods, the price for erection, testing and commissioning, price for
associated civil, structural works and other services it proposes to furnish under the
contract, EXCLUDING GST and Cess along with the total bid price.
GST shall be applicable at the rate of 9% CGST plus 9% SGST or 18% IGST, or as
applicable to composite supplies in the nature of Works Contract applicable from
time to time will be paid within the original contractual delivery period. However, the
Classification Codes (i.e. HSN or SAC) for each item of different segments or portions
of the Works Contract, shall be specified separately, for information and technical
identification purpose only.
11.2 Detailed break up, covering all the price components of unit prices as well as total bid price,
the bidder. This break up shall be entered separately in the following manner:-
A) For all goods offered:
Prices quoted should be FIRM and on F.O.R. Destination basis (i.e. any of the stores of
COMPANY in Gujarat). However, the Tenderer should indicate in Price Bid, the break-up
of Total Unit F.O.R. Destination Price stating the Unit Ex-works price, freight, packing &
forwarding charges, Insurance Charges, separately in price bid, which is a must. The rate
of GST shall be 9% CGST plus 9% SGST or 18% IGST or as applicable to composite supply
in the nature of Works Contract, applicable from time to time.
ii. This tender is to be treated as a contract for composite supply under the category of
Works Contract, which is, as per the provisions of Section 2(30), read with, Section 2(119),
further read with, Paragraph 6(a) of the Schedule II, to the CGST Act, 2017 and similar
provisions, applicable under UTGST Act, 2017 and the IGST Act, 2017. However, the
classification Codes (HSN/SAC) for each item under different segments or portions of the
Works Contract, shall be specified separately for the knowledge and transparency purpose
which shall have no bearing on price or taxation payment.
iii. The offered prices to be indicated in online mode of tender in the format given (i.e.
Schedule-______________). The price bid submitted in physical mode shall not be
iv. The Tenderer should invariably indicate the unit end cost price excluding GST
considering all their costs / calculations in the Price bid itself for each item and all sub-
items if any. This is a must. Cost components hidden / furnished elsewhere will not be
considered and will be ignored out rightly.
Seal & Signature of Bidder
v. Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder
intends to supply the goods / services, meaning thereby the bidder has to supply the goods
/ services from the relevant declared / registered place of supply only.
11.3 The bidder’s separation of price components in accordance with above clause No: 11.2 will
be solely for the purpose of the facilitating the comparison of Bids by the owner, for contract
price amendment due to quantity variation and for on account payments (in case of award)
and shall not in any way limit the Owner’s rights.
11.4 The Price quoted by the bidder shall remain firm during the contract period and shall
not be subject to variation on any account or for change in quantity.
11.5 The Bidder shall specifically note that the Tenders are invited on item rate base.
12.0 Bid Security/EMD:
12.1 The bidder shall furnish, as a part of its bid EMD, bid security for an amount of EMD to be
a) 50% OR 100% In the form of crossed DD drawn in favor of Gujarat Energy Transmission
Corporation Limited payable at Vadodara.
b) Remaining 50% amount in form of BG from approved banks of GETCO having validity of
Six months from the date of bid opening of Technical Bid.
12.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which
would warrant the guarantee forfeiture, pursuant to relevant paras elsewhere
The bid guarantee shall be made payable to the Owner without any condition whatsoever.
12.3 Any bid not secured in accordance with Para 23.1 above will be rejected by the Owner as
non-responsive. No exemptions are made in the furnishing of the security.
12.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or
three months-from the date of submission of tender whichever is later.
12.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract
performance guarantee.
12.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies
within thirty days of letter of award of contract)
13.0 Format of Bid:
13.1 The Bidder shall prepare two copies of the bid, clearly marking each “Original bid” and
“Copy of Bid”, as appropriate. In the event of any discrepancy between them the original
shall govern. All the documents furnished in original document shall be furnished in other
copies of Bids.
13.2 The original and all copies of the bid shall be typed or written in indelible ink and shall be
signed by the Bidder or a person or persons duly authorized by the Bidder to sign the
Contract. The letter of authorization shall be indicated by written power-of-attorney
accompanying the bid. All pages of the bid, except for un-amended printed literature, shall
be initiated by the person or persons signing the bid.
Seal & Signature of Bidder
13.3 The Bidders must submit the qualifying data in one original and one duplicate copy as
required in this Instructions to Bidders in separate envelopes sealed and enclosed in the
envelope submitting proposals, super scribed as under :
QUALIFYING DATA FOR THE SUPPLY AND ERECTION OF
ACE(P&C)/Contract/TRB/220/132KV/Asoj S/S /E-498
The bid shall contain no interlineations, erasures or overwriting except as necessary to
correct errors made by the Bidder, in which case such corrections shall be initiated by the
person or persons signing the bid.
13.4 Bids shall be submitted as under: Online submission Only
Cover-I Earnest Money Deposit (Bid-Security), as per relevant clause of SCC duly
signed and Contractor’s covering letter. Tender fee details (as per tender
Cover-II Qualifying Requirements. (Electrical)
Cover-III Technical Bid (Electrical )
Price Bids are not to be submitted with physical documents
All Bid documents duly signed & sealed shall be submitted with technical bid.
Must contain conditions and schedules of Part- III without prices and Technical Data
Requirement Sheets (Cover I, II, III will be collectively called Technical Bid).
All Bid documents duly signed & sealed shall be submitted with technical bid.
14.0 Signature Of Bids:
14.1 The bid must contain the name, residence and place of business of the person or persons
making the bid and must be signed and sealed by the Bidder with his usual signature. The
names of all persons signing should also be typed or printed below the signature.
14.2 Bid by a partnership must be furnished with full names of all partners and be signed with
the partnership name, followed by the signature(s) and designation(s) or the authorized
partner(s) or other authorized representative(s).
14.3 Bids by Corporation/Company must be signed with the legal name of the
Corporation/Company by the President/Managing Director or by the Secretary or other
person or persons authorized to bid on behalf of such Corporation/Company in the matter.
14.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’,
‘Secretary’, ‘Agent’ or other designation without disclosing his Principal will be rejected.
14.5 If it is found that two or more persons who are connected with one another either financially
or as a principal and agent have bid under different names without disclosing their
connection then such bids will be liable for rejection. Satisfactory evidence of authority of
the person signing on behalf of the Bidder shall be furnished with the bid.
14.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
14.7 Bids not conforming to the above requirements of signing may be disqualified and EMD
Seal & Signature of Bidder
15.0 Sealing and marking of bids: Online Submission Only
15.1 Cover-I 1. Bid No.
2. Due date for opening
3. Reference of tender fee & earnest money deposit
Cover-II 1. Bid No.
2. Due date for opening.
3. Qualifying Requirements (Electrical)
Cover-III 1. Bid No.
2. Due date for opening
3. Technical bid (Electrical ) reference and required certificates
Cover-I, Cover-II ,Cover-III shall be individually sealed and super scribed as indicated
above and should be enclosed in the main cover duly sealed and super scribed as Tender
for …………………………………… against Bid No…………… due on……………
containing Cover-I, Cover-II, Cover-III of this tender.
The original Bid and accompanying documents clearly marked “Original” for Cover I, II, III
shall be submitted by the Bidder at the date, time and place specified. In the event of any
discrepancy between the original and the copies, the original shall govern.
PLEASE DO NOT SEND ANY DUPLICATE COPY OF THE BID
The Bid shall be submitted by RPAD or through speed post services at the Office of
the ACE (P&C) GETCO, Bids submitted should be posted with due allowance for any postal
delay. The Bids received after the Due Date and Time of opening are liable to be rejected.
Telegraphic/Telex/Fax/e-mail Bids shall not be entertained.
15.2 The Bidders shall seal the original and each copy of the bid in an inner and an outer
envelope, duly marking the envelopes as “original” and “copy”.
15.3 a. Addressed to the Owner at the following address:
The Additional Chief Engineer (Procurement & Contracts) - GETCO
8th Floor, Sardar Patel Vidyut Bhavan, Race Course,
b. Bear the name of package bid enquiry number, name of the work and the words. “DO
NOT OPEN BEFORE……………………
15.4 The inner envelope shall indicate the name and address of the Bidder to enable the bid to
be returned unopened in case it is declared “late” or “rejected”.
15.5 If the outer envelope is not sealed and marked as required by Clause No: 15.1 the Owner
will assume no responsibility for the bid’s misplacement or premature opening.
15.6 The Bid Security conditions must be submitted in a separate sealed envelope.
16.0 Deadline for submission of bids : online submission only
Seal & Signature of Bidder
16.1 Bids submitted by telex/telegram will not be accepted. No request from any Bidder to the
Owner to collect the proposals from airlines, cargo agent etc. shall be entertained by the
16.2 Bids must be received by the Owner at the address specified under Clause No: 15.3, not
later than the time & date mentioned in the Invitation to Bid.
16.3 The Owner may, at its discretion, extend this deadline for the submission of bids by
amending the Bidding Document in which case all rights and obligations on the Owner and
Bidders previously subject to the deadline will thereafter be subject to the deadline as
17.0 Late Bids : online submission only
17.1 Any bid received by the Owner after the time and date fixed or extended for submission of
bids prescribed by the Owner, will be rejected and not considered for evaluation.
18.0 Modification and withdrawal of bids :
18.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written
notice of the modification or withdrawal is received by the Owner prior to the deadline
prescribed for submission of bids.
18.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and
dispatched in accordance with the provisions of clause No: 15.0. The envelope should
clearly indicate whether the modification is for the Technical bid or the Price bid. No bid
modifications notice by Telex/Grams/Fax shall be entertained by the Owner.
18.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for
submission of bids.
18.4 No bid may be withdrawn in the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of
its bid security.
19.0 Information required with the proposal:
19.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each
principal item of equipment proposed to be furnished and erected. The bid should also
contain drawings and descriptive materials indicating general dimensions, materials from
which the parts are manufactured, principles of operation, the extent of pre-assembly
involved, major construction equipment proposed to be deployed, method of erection and
the proposed erection organizational structure.
19.2 The above information shall be provided by the Bidder in the form of separate sheets,
drawings, enclosed etc. along with soft copy.
19.3 Any bid not containing sufficient descriptive material to describe accurately the equipment
proposed may be treated as incomplete and hence rejected. Such descriptive materials and
drawings submitted by the Bidder will be retained by the Owner. Any major departure from
these drawings and descriptive material submitted will not be permitted during the execution
of the Contract without specific written permission of the Owner.
19.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement
of the equipment or any other matter will not be considered.
Seal & Signature of Bidder
19.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to
provide additional information and data as deemed necessary by the Bidder.
19.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment
and materials which will be required for the purpose of erection of equipment and materials
supplied under the Contract.
19.7 In case the ‘Proposal’ information contradicts specification requirements, the specification
requirements will govern, unless otherwise brought out clearly in the technical commercial
deviation schedule.
BID OPENING AND EVALUATION
20.0 Opening of bids by owner:
20.1 The Owner will open the bids in the presence of Bidder’s representatives who choose to
attend on the date and time mentioned for opening of bids in the Invitation to Bid or in
case any extension has been given thereto, on the extended bid opening date and time
notified to all the Bidders who have purchased the bidding document. The Bidder’s
representatives who are present shall sign a register evidencing their attendance.
20.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the
Owner, at his discretion may consider appropriate, will be announced in the Technical Bid
20.3 The price bids of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present.
The date & time of opening the Price Bid shall be intimated to all such qualified bidders by
Fax/Telex, at least one week in advance besides inviting final price bid if found appropriate
after evaluation of Technical bids.
20.4 The Bidder’s name, Bid Price, all discounts if any, modifications in the Price Bid and any
such other details as the Owner, at his discretion, may consider appropriate, will be
announced/ furnished in the Price Bid Opening.
20.5 No electronic recording/transmitting devices will be permitted during Bid opening.
21.0 Purpose of evaluation of bids:
21.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the
technical responsiveness of the bid for the complete scope of the proposal, as covered
under these specifications and documents. All technically responsive bids shall then be
examined to determine the lowest evaluated commercially and technically responsive bids.
22.0 Policy for bids under consideration:
22.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid
and until such time official intimation of award/rejection is made by the Owner to the Bidders.
While the Bids are under consideration, Bidders and/or their representatives and other
interested parties are advised to refrain from contacting by any means, the owner and/or
his employee’s representatives on the matters related to Bids under consideration.
22.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own
ask the Bidder for a clarification of its bid. The request for clarification and the response
shall be in writing and no change in the price or substance of the bid shall be sought, offered
Seal & Signature of Bidder
23.0 Preliminary Examination:
23.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished,
whether the documents have been properly signed, and whether the bids are generally in
23.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by
multiplying the unit price and quantity, the unit price shall prevail and the total price shall be
corrected. If there is a discrepancy between the total bid amount and the sum of total costs,
the latter shall prevail and the total bid amount will be corrected accordingly. If there is a
discrepancy between words and figures, the amount advantageous to the Owner will
prevail. If the Bidder does not accept the correction of the errors as above, his Bid will be
rejected and the amount of Bid Security will be forfeited. The Bidder should ensure that the
any inconsistency in the prices furnished in the specified prices schedules to be identified
in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for
the purpose of evaluation and for the purpose of award of Contract use the lowest of the
prices in these schedules.
23.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of
each bid to the Bidding Document. For purpose of these Clauses, a substantially responsive
bid is one which conforms to all the terms and conditions of the Bidding Document without
material deviations. A material deviation is one which affects in any way the prices, quality,
quantity or delivery period of the equipment, completion of works or which limits in any way
the responsibilities or liabilities of the Bidder of any right of the Owner as required in these
specifications and documents. The Owner’s determination of a bid’s responsiveness shall
be based on the contents of the bid itself without recourse to extrinsic evidence.
23.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
23.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which
does not constitute a material deviation, provided such waiver does not prejudice or affect
the relative ranking of any Bidder.
24.0 Award Criteria
24.1 The owner will award the contract to the successful Bidder, whose bid has been determined
to be substantially responsive and has been determined as the lowest evaluated bid,
providing further that the Bidder is determined to be qualified to perform the contract
satisfactorily. The Owner shall be the sole judge in this regard.
24.2 In case of award of Contract on a bidder there shall be separate contracts one for Civil
works, second for supply of goods and third for the erection & services works in substations.
24.3 Further, the Owner reserves the right to award separate contracts to two or more parties in
line with the terms and conditions specified in the accompanying Technical Specifications.
25.0 Owner’s right to accept any bid and to reject any or all bids:
25.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process
and reject all bids at time prior to award of contract, any without thereby incurring any liability
to the affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders
of the grounds for the Owner’s action.
Seal & Signature of Bidder
26.0 Notification of award:
26.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the
Owner will notify the successful Bidder in writing by registered letter or cable or telex or
FAX, to be confirmed in writing by registered letter, that its bid has been accepted.
26.2 The notification of award will constitute the formation of the Contract.
26.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant
clause No: 36 & 38, the Owner will promptly notify each unsuccessful Bidder and will
discharge its bid security, pursuant to Clause No: 12.00.
27.0 Signing of contract:
27.1 At the same time as the Owner notifies the successful Bidder that his bid has been
accepted, the Owner will send the Bidder the detailed of Award, incorporating all
agreements between the parties.
27.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same
with date and return it to the Owner.
27.3 The Bidder will prepare the Contract Agreement as per the proforma prescribed and the
same will be signed within 30 (Thirty) days of notification of Award.
28.0 DEFINITION OF TERMS
28.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor
as per the Contract Agreement signed by the parties, including all attachments and
appendices thereto and all documents incorporated by reference therein.
28.2 ‘Owner’ shall mean the Gujarat Energy Transmission Corporation Limited, Vadodara
or any of its group companies i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL
and shall include its legal representatives, successors and assigns
28.3 ‘Contractor’ or ‘Manufacturer’ shall mean the Bidder whose bid is accepted by the Owner
for the award of the Works and shall include such successful Bidder’s legal representatives,
successors and permitted assigns.
28.4 ‘Sub-Contractor’ shall mean the person named in the Contract for any part of the Works or
any person to whom any part of the Contract has been sublet by the Contractor with the
consent in writing of the Engineer and will include the legal representatives, successors and
permitted assigns of such person.
28.5 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from
time to time for the purpose of the Contract.
28.6 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores
and materials to be provided by the Contractor under the Contract.
28.7 ‘Works’ shall mean and include the furnishing of equipment, labour and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation
including all transportation, handling, unloading and storage at the Site as defined in the
28.8 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the
Contract and such other schedules and drawings as may be mutually agreed upon.
28.9 Site’ shall mean and include the land and other places on, into or through which the works
and the related facilities are to be erected or installed and any adjacent land, paths, street
Seal & Signature of Bidder
or reservoir which may be allocated or used by the Owner or Contractor in the performance
of the Contract.
28.10 The term ‘Contract Price’ shall mean the Firm price quoted by the Contractor in his bid with
additions and/or deletions as may be agreed and incorporated in the Letter of Award and
the contract agreement for the entire scope of the works.
28.11 The term ‘Equipment Portion’ of the Contract price shall mean the ex-works value of the
equipment/Materials supplied include structures, town materials insulators, conducting etc.
28.12 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the
works including erection, testing and putting into satisfactory operation including successful
completion of performance and guarantee tests to be performed at Site by the Contractor
including cost of insurances.
28.13 ‘Manufacturer’s Works’ or ‘Contractor’s Works’, shall mean the place of work used by the
manufacturer, the Contractor, their collaborators/associates or Sub-Contractors for the
performance of the Contract.
28.16 Site Engineer ‘Inspector’ shall mean the Owner owner’s Engineers or any person nominated
by the time to inspect the equipment; stores or Works under the Contract and/or the duly
authorized representative of the Owner.
28.17 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice
issued by the Owner notifying the Contractor that his bid has been accepted.
28.18 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the
28.19 ‘Date of Contract’ shall mean the date on which Notice of Award of Contract/Letter of Award
has been issued.
28.20 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
28.21 A ‘Week’ shall mean continuous period of seven (7) days.
28.22 Writing’ shall include any manuscript, type written or printed statement, under or over
signature and/or seal as the case may be.
28.23 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’,
‘Requested’, ‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’,
‘Permitted’, or words and phrases of like importance are used the approval, judgment,
direction etc. is understood to be a function of the Owner/Engineer.
28.24 Test on completion shall mean such tests as prescribed in the Contract to be performed by
the Contractor before the work is taken over by the Owner.
28.25 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified
in the Contract Documents.
28.26 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of
the Works performed under the Contract, after successful commissioning/completion of
Performance and Guarantee Tests, as specified in the accompanying Technical
Specifications or otherwise agreed in the Contract.
28.27 ‘Guarantee Period’/’Maintenance Period’ shall mean the period during which the Contractor
shall remain liable for repair or replacement of any defective part of the works performed
under the Contract.
28.28 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man-
ship which cannot be detected during inspection, testing etc, based on the technology
available for carrying out such tests.
28.29 ‘Drawing’, ‘Plans, shall mean all:
Seal & Signature of Bidder
a) Drawings furnished by the Owner/Consultant as a basis of Bid/Proposals.
b) Supplementary drawings furnished by the Owner/Consultant to clarify and to define in
greater detail the intent of the Contract.
c) Drawings submitted by the Contractor with his bid provided such drawings are
acceptable to the Owner/Consultant.
d) Drawings furnished by the Owner/Consultant to the Contractor during the progress of
e) Engineering data and drawings submitted by the Contractor during the progress of the
work provided such drawings are acceptable to the Engineer/Owner.
28.30 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the
subject matter of the Contract.
28.31 Words imparting the singular only shall also include the plural and vice –versa where the
context so requires.
28.32 Words imparting ‘Person’ shall include firms, companies, corporations and associations or
bodies of individuals, whether incorporated or not.
28.33 Terms and expressions not herein defined shall have the same meaning as are assigned
to them in the Indian Sale of Goods Act (1930), failing that in the Indian Contract Act (1872)
and failing that in the General Clauses Act (1897) including amendments thereof, if any.
In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
a) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
28.34 GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act,
GST(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and
SGSCT Act, 2017and all related ancilliary legislations.
Seal & Signature of Bidder
28.35 Works contract means a Contract for composite supply and covered under the definition of
Works Contract as defined under Section 2(119) of the CGST Act, 2017 or SGST Act,
and similar provisions, applicable under the UTGST Act, 2017and the IGST Act,
29.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by
provisions in other parts of the Contract.
The goods supplied under this Contract shall conform to the standards mentioned in the
Technical Specifications, and, when no applicable standard is mentioned, to the
authoritative standard appropriate to the goods and such standards shall be the latest
issued by the concerned institution.
31.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices,
correspondences, operating and maintenance instructions, drawings or any other writing
shall be written in English language. The Metric System of measurement shall be used
exclusively in the Contract.
32.0 Price Basis:
32.1 The Price shall be quoted on firm basis except for supply of substation structure
materials (including nut-bolts) for which Price variation will be applicable.
32.2 The Price quoted by the bidder shall remain fixed for all the items except substation
structure materials (including nut bolts); during the bidder's performance of the contract and
shall not be subject to variation on any account save for change in quantity. A bid submitted
with an adjustable price quotation shall be treated as non-responsive and rejected.
For substation structure material(Applicable)
P0 SBLR SBIR Zn W
100 SBLRo SBIRo Zno W0
P = Price payable as adjusted in accordance with the above formula.
P0 = Price quoted/confirmed.
SBLR0 = Price of Steel Blooms- Retail
This price is as applicable for the month, ONE month prior to the date of
SBIR0 = Price of Steel Billets- Retail
This price is as applicable for the month, ONE month prior to the date of
Zn0 = Price of Electrolytic high grade zinc
This price is as applicable for the month, ONE month prior to the date of
Seal & Signature of Bidder
Wo = All India average consumer price index number for industrial workers, as
published by the Labour Bureau, Ministry of Labour, Govt. of India (Base:
This index number is as applicable for the month, THREE months prior to
the date of tendering
SBLR = Price of Steel Bloom-Retail
This price is as applicable for the month, TWO months prior to the date of
SBIR = Price of Steel Billets-Retail
This price is as applicable for the month, TWO months prior to the date of
Zn = Price of Electrolytic high grade zinc
This price is as applicable for the month, TWO months prior to the date of
W= All India average consumer price index number for industrial workers, as
published by the Labour Bureau, Ministry of Labour, Govt. of India (Base:
This index number is as applicable for the month, FOUR months prior to the
date of delivery
21.1 The price variation amount in the ex-works price of fabricated structure members (including
bolts & nuts) calculated by the above formula shall not be subject to any ceiling, whatsoever.
21.2 The price variation formula will be applicable from the date of inspection / waival of
inspection for the material offered.
21.3 The price variation will be applicable during contractual delivery period only. However, any
decrease in the price variation during delayed period shall be applicable.
21.4 Price variation shall not be allowed beyond the original delivery date unless specifically
stated in the time extension letter. As a rule, no price adjustment shall be allowed for the
period of delay for which the supplier is responsible; however purchaser will be entitled for
any decrease in the prices during this delayed period.
21.5 In case of non-publication of applicable indices on a particular month, which happens to be
the applicable month for price variation purpose, the published indices prevailing
immediately prior to the particular month shall be applicable.
21.6 If the price adjustment amount works out to be positive, the same is payable to the contractor
by the owner and if it works out to be negative, the same is to be recovered by the owner
from the contractor.
21.7 No price variation will be allowed on the freight and insurance component of FOR destination
21.8 The supplier has to submit PV bills (Negative / Positive) along with supporting documents /
IEEMA circulars necessary for calculation of PV bills along with bills for payment against SR
Notes. To claim the price variation successful bidder has to submit the supporting
documents duly notary certified copy of IEEMA circulars, PV calculation sheet etc. along
with their invoices.
21.9 The base date for the above Price Variation formula will be first day of the month prior to
opening month of the Tender.
Seal & Signature of Bidder
21.10 In the above price variation formula, subscript “0” refers to indices as on 30 days prior to the
date of Bid opening (referred to base date indices). Subscript “1” refers to the indices as on
60 days prior to date of inspection / waival of inspection of the material offered.’
33.0 Taxes and Duties:
Goods and Service Tax (GST):
33. 1 The F.O.R. Destination prices are excluding GST and Cess as applicable which will
be paid extra on a given taxable goods and/or services within the original contractual
delivery period. The amount and % of GST and Cess as applicable should clearly be
indicated separately. (GST/Cess means all applicable Tax/Cess under GST Laws. GST
Laws means IGST Act, GST(Compensation to the State for Loss of Revenue) Act, CGST
Act, UTGST Act and SGSCT Act, 2017 and all related ancilliary legislations).
33. 2 You shall have to submit a C.A Certificate & duly authorized Signatory of successful bidder,
certifying that you have not claimed Refund of any applicable GST and Cess, charged to
COMPANY or shall not claim any such Refund, on a future date, from the concerned
Authorities and if, any Refund, in respect of such GST and Cess, is claimed by you, it will
be immediately passed on to the COMPANY, without COMPANY making any specific
Claim, for the same, either from the Department or from you.
33. 3 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of
GST and Cess is not mentioned clearly unless the bidder has opted for Compostion
Scheme under GST Act, which should be clearly indicated in the price bid. COMPANY may
at its discretion consider such offer with presumption of highest applicable rate of GST and
Cess prevailing when the price quoted is inclusive of GST and Cess.
33. 4 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must
be clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the
contract, the rate mentioned in the price bid shall be final and any additional GST will have
to be borne by the tenderer. In no case additional amount towards tax or otherwise will be
paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be
applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
33. 5 Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further,
any additional liability of GST (later on due to wrong mentioning of GST rate, mis-
interpretation of HSN/SAC Code, etc.) over and above as charged in the invoice shall be
borne by the Supplier/Contractor. However, any refund received by the supplier / contractor
on account of GST charged from the company; such refund shall have to be passed on to
the company, along with interest if any. Such refund along with interest needs to be passed
on suo-moto by the supplier / contractor.
33. 6 Further, the Company has a right to recover the amount of GST along with penal interest
at the rate of 15% per annum if GST charged is not paid / short paid to the government or
fail to upload the details or uploads inaccurate particulars on GSTIN portal by the Supplier
/ Contractor within the stipulated time limit.
33. 7 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the
provision of GETCO’s statutory variation clause shall apply.
33. 8 INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion
of any other additional item of their inputs / input services under the ambit of the Input Tax
Credit provisions under the GST Act, subsequent to the date of submission of the offer, the
Seal & Signature of Bidder
same should be passed on to COMPANY and you should inform such changes to
COMPANY from time to time.
33. 9 GST, other taxes and other levies and duties including custom duty solely in respect of the
transaction between the owner and the contractor under this contract, if any, shall be
included in the bid price. These shall also be indicated separately wherever applicable as
mentioned in the Tender .
33. 10 As regards the income Tax, surcharge on income tax and any other corporate tax, including
GST if any the owner shall not bear any tax liability whatsoever. The bidder shall be liable
and responsible for payment of such taxes as attracted under the provisions of the law.
33. 11 Notwithstanding the tax liabilities as per the sub-clause 35.10 above the owner shall have
the right to make deduction at source from the amounts payable to the contractor in respect
of Income Tax (on the cost of items of supply included in the works contract) as may be
mandatory in terms of the law. The owner shall not bear any liability in this regard but shall
issue necessary certificate in respect of such deduction made.
33. 12 Whenever concessional rate of GST is indicated by the bidders, it shall be confirmed
whether any increase in the rates that becomes applicable during the performance of the
contract would be absorbed by the supplier. Bidder shall note that in case of absence of
such confirmation; the tenders will be evaluated taking into account the maximum rate of
GST applicable.
33. 13 In case any tax or duty is newly introduced by the Government applicable for this contract
with effect from the next day of the date submission of the bid and if the contractor is
required to pay additional tax or duty, then the owner shall reimburse the contractor the
additional tax or duty so paid by the contractor against submission by the contractor of
documentary evidence to the satisfaction of the owner. This provision will not be applicable
to transaction between the contractor and his sub-suppliers, sub-contractors for raw
materials etc and will be applicable only to the direct transactions between the contractors
and owner. Besides the said statutory variation, no other statutory variation shall be payable
33. 14 The owner’s liability for all taxes and duties including GST under the contract shall be limited
to those indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory
variations and variations as per Clause No. 35.9.
33. 15 If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or
reduced by reasons of the making, passing or promulgation of any law after the date of
submission of bid or by any order, regulation or bye-law having the force of law the amount
of such increase or reduction shall be added to or deducted from the “Contract Price” as
the case may be for direct transactions between contactor & owner. It is the Bidders
responsibility to furnish details of taxes, duties, levies etc. applicable as on the date of
submission of the bid.
33. 16 No claim for any increase towards the statutory variation regarding enhancement of existing
tax or duty or introduction of a new tax or duty applicable shall be entertained by the Owner
during the extended period of contract, if any, provided the extension of the contract is
required by causes attributable to the contractor. However, the decrease in any
taxes/duties shall be passed on to GETCO.
33. 17 The provision of statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty will be applicable only to the direct transaction between
the contractor and the owner.
33. 18 Before quoting, the bidder may ascertain from the concerned tax authorities of Government
for the applicability of Entry Tax, GST etc. in respect of this work and include the same in
Seal & Signature of Bidder
the quoted price. No separate claim in this regard will be entertained by the Owner, as it is
the responsibility of the Bidder to pay all these taxes.
34.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed
against the Owner or the Contractor in pursuance of the Contract. In addition, the Contractor
shall be responsible for payment of all Indian duties, levies and taxes including GST
lawfully assessed against the Contractor for his personal income & property only.
35.0 Price Inclusions (including Taxes & Duties) :
35.1 GOODS AND SERVICE TAX (GST): GST and Cess as applicable shall be payable/
receivable as mentioned in clause no.33 of GCC supra
35.2 The prices quoted shall be all inclusive of freight, transportation, loading, –unloading
& stacking at site of materials supplied by Contractor as well as owner supplied item if
35.3 No extra payment toward any type of templates and erection tools /materials will be
35.4 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess
as applicable or in the event of introduction of new tax/cess or cessation of
existing tax/cess subsequent to suppliers offer if it takes place within the original
contractual delivery date will be to COMPANY’s account subject to the claim being
supported by documentary evidence. However, if any decrease takes place after the
contractual delivery date, the advantage will have to be passed on to COMPANY.
35.5 Income Tax
Income-tax at source at the prevailing rate will be deducted from bills in accordance with the
provision of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
36.0 CONTRACT PERFORMANCE GUARANTEE
36.1 As a contract performance security, the successful bidder, to whom the work is awarded,
shall be required to furnish a performance guarantee as per clause No. 38 in form of Bank
guarantee from a Public Sector Indian bank/Scheduled, Commercial Bank in the form to be
furnished and it shall guarantee the faithful performance of the Contract in accordance with
the terms and conditions specified in these documents and specifications.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the
equipment furnished and erected under the Contract, as per the specifications and
b) The successful Bidder further guarantees that the equipment provided by him/his sub-
vendors and installed by him shall be free from all defects in design, material and
workmanship and shall upon written notice from the Owner fully remedy free of
expenses to the Owner such defects as developed under the normal use of the said
equipment within the period of guarantee specified in the relevant clause of the General
Terms and Conditions in the Part-I.
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire
contract. However, it is not to be construed as limiting the damages under clause entitled
“Equipment Performance Guarantee” in Technical Specifications, Part-II and damages
stipulated in other clauses in the Bid documents.
36.4 The Contract performance guarantee will be discharged without any interest on successful
completion of order and only after the performance guarantee condition is fulfilled. The
Seal & Signature of Bidder
Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of the
Contract in the prescribed form within fifteen(15) days of “Notice of Award of Contract”. The
performance guarantee(s) shall be as per terms prescribed.
GUARANTEES & LIABILITIES
37.1 The Contractor shall warrant that the whole project, in accordance with the Contract
documents and free from defects in material/equipment and workmanship for a period of
twenty four (24) calendar months commencing immediately upon the satisfactory
commissioning of the project and issuance of Taking Over Certificate (TOC). The
Contractor’s liability shall be limited to the replacement of any defective parts in the
equipment of his own manufacture or those of his Sub-Contractors under normal use and
arising solely from faulty design, materials and/or workmanship provided always that such
defective parts are repairable at the site and are not in meantime essential in the
commercial use of the equipment. Such replaced/defective parts shall be returned to the
Contractor unless otherwise arranged. No repairs or replacement shall normally be carried
out by the Engineer when the equipment is under the supervision of the Contractor’s
Supervisory Engineer.
37.2 In the event of any emergency where in the judgment of the Engineer, delay would cause
serious loss or damages, repairs or adjustment may be made by the Engineer or a third
party chosen by the Engineer without advance notice to the Contractor and the cost of such
work shall be paid by the Contractor. In the event such action is taken by the Engineer, the
Contractor will be notified promptly and he shall assist wherever possible in making
necessary corrections. This shall not relieve the Contractor of his liabilities under the terms
and conditions of the Contract.
37.3 If it becomes necessary for the Contractor to replace or renew any defective portions of the
works the provision of this clause shall apply to portion of the works so replaced or renewed
until the expiry of twelve (12) months from the date of such replacement or renewal. If any
defects are not remedied within a reasonable time, the Engineer may proceed to do the
work at the Contractor’s risk and cost but without prejudice to any other rights which the
Owner may have against the Contractor in respect of such defects.
37.4 The repaired or new parts will be furnished and erected free of cost by the Contractor. If
any repair is carried out on his behalf at the site, the Contractor shall bear the cost of such
37.5 The cost of any special or general overhaul rendered necessary during the maintenance
period due to defects in the equipment or defective work carried out by the Contractor, the
same shall be borne by the Contractor.
37.6 The acceptance of the equipment by the Engineer shall in no way relieve the Contractor of
his obligations under this clause
37.7 In the case of those defective parts, which are not repairable at site but are essential for the
commercial operation of the equipment, the Contractor and the Engineer shall mutually
agree to a programme of replacement or renewal, which will minimize interruption to the
maximum extent in the operation of the equipment.
37.8 At the end of the guarantee period, the Contractor’s liability ceases except for latent
defects. For latent defects, the Contractor’s liability as mentioned in Clause Nos.
through 37.7 above, shall remain till the end of 5 years from the date of completion of
guarantee period.
In respect of goods supplied by Sub-Contractors to the Contractor where a longer guarantee
is provided by such Sub-Contractor, the Owner shall be entitled to the benefits of such longer
Seal & Signature of Bidder
37.9 The provisions contained in this clause will not be applicable: a) If the Owner has not used
the equipment according to generally approved industrial practice and in accordance with
the conditions of operations specified and in accordance with operating manuals, if any. b)In
cases of normal wear and tear of the parts to be specifically mentioned by the Contractor in
37.10 The Guarantee period for individual equipment / item indicated in the tender
specification remains unchanged and shall have to be adhering to as indicated below.
220KV & 132 CT & PT–You have to give assurance for trouble free and maintenance free
performance for a period of 60 Months from the date of receipt of stores. During this period,
the CTs /PTs shall be repaired/reconditioned/replaced free of cost immediately in case of
38.0 Performance Guarantee:-
“The successful bidder shall have to submit the performance guarantee in the form of Bank
Guarantee worth 10% of the total contract value (end cost) to cover the entire execution.
The Performance Bank Guarantee (covering the execution of the contract) will be returned
ONLY on successful commissioning & issuance of TOC including material reconciliation &
as built drawings and on receipt of the Bank Guarantee towards Warranty worth 10% of the
total contract value(end cost), which will be retained till completion of the Guarantee period.
These Bank Guarantees shall be applicable for all the bidders irrespective whether they are
SSI/NSIC units.”
The above performance guarantee, to be submitted by successful tenderer, towards
execution period, is for the satisfactory execution of the contract.
Whereas the performance guarantee, to be submitted by successful tenderer, towards
warrantee, is for satisfactory performance of the materials which should be valid for
12/18/24/36/48/60 months from the date of commissioning OR 18/24/30/42/54/66 months
from the last date of delivery of supply whichever is earlier OR whatever applicable as per
technical specification
If the full Performance Guarantee amount / BG is not paid / submitted within
(Fifteen) days after the receipt of the order , then the order will be outrightly cancelled
at the risk & cost of the Tenderer (at the discretion of the Corporation) and without
entering into any correspondences and this will be binding on the Tenderer.
39.0 Time Schedule:
39.1 The basic consideration and the essence of the Contract shall be strict adherence to the
time schedule for performing the specified works.
39.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
39.3 The completion schedule as stated in the special conditions of contract shall be one of the
major factors in consideration of the bids.
39.4 The owner reserves the right to request for a change in the work schedule during pre- award
discussions with successful bidder.
39.5 The successful bidder will be required to prepare detailed PERT Network/ detailed M.S.
Project Bar chart and finalise the same with the owner as per the requirement of Clause no
40.0 TIME – THE ESSENCE OF CONTRACT
40.1 The time and the date of completion of the Contract as stipulated in the Contract by the
Owner without or with modifications, if any, and so incorporated in the Letter of Award, shall
be deemed to be the essence of the Contract. The Contractor shall so organize his
resources and perform his work as to complete it not later than the date agreed to.
Seal & Signature of Bidder
40.2 The Contractor shall submit a detailed PERT network/bar chart within the time frame
agreed consisting of adequate number of activities covering various key phases of the work
such as design, procurement, manufacturing, shipment and field erection activities within
fifteen (15) days of the date of Notification of Award. This network shall also indicate the
interface facilities to be provided by the Owner and the dates by which such facilities are
needed. The Contractor shall discuss the network so submitted with the Owner and the
agreed network shall form part of the Contract documents. During the performance of the
Contract, if in the opinion of the Engineer, proper progress is not maintained, suitable
changes shall be made in the Contractor’s operations to ensure proper progress without
any cost implication to the Owner. The interface facilities to be provided by the Owner in
accordance with the agreed network shall also be reviewed while reviewing the progress of
the Contractor.
40.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the
Contractor as directed by the Engineer.
40.4 Subsequent to the finalization of the network, the Contractor shall make available to the
Engineer a detailed manufacturing programme in line with the agreed Contract network.
Such manufacturing programme shall be reviewed, updated and submitted to the Engineer
every month thereafter.
40.5 The above bar charts/manufacturing programme shall be compatible with the Owner’s
computer environment and furnished to the Owner on such media as may be desired by
40.6 If the progress is found low, GETCO reserves the right to get the work executed through
any other agency at the risk & cost of contractor without assigning any reason(s) and/or
41.0 PENALTY FOR DELAY:
41.1 The tenderer should note that the completion time allowed for carrying out the work should
be strictly observed. Any delay that may take place in supply, erection and civil beyond
Contractual period stated shall be subject to the penalty at the rate of ½ % per week or part
there of plus GST as applicable on delayed portion, with a ceiling of 10 % of the total contract
value plus GST as applicable. For calculating the delayed portion date of actual receipt of
material at store shall be considered.
41.2 The penalty plus GST as applicable will be deducted from bills payable either against this
contract or from any Bank Guarantee or any other amount payable under any other contract
with the GETCO.
41.3 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner
shall be entitled to deduct the amount of Penalty for delay from the amounts payable
to the Contractors under any bills raised under this contract or any other amount
payable under any other contract with the GUVNL and its Subsidiary companies i.e.
GETCO, GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGCVL. It is permissible for the
Owner to adjust the amount of Penalty of delay against any Bank Guarantee furnished by the
Contractor under this contract or any other contract with GUVNL and/or its subsidiary
42.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
42.1 In case the Contractor’s performance is delayed due to any act of omission on the part of
the Owner or his authorized agents, then the Contractor shall be given due extension of
time for the completion of the Works, to the extent such omission on the part of the Owner
has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the
Engineer shall be final.
42.2 In addition, the Contractor shall not be entitled to any claim whether demonstrable or
reasonable compensation if such delays have resulted in any increase in cost
Seal & Signature of Bidder
43.0 Presentation of Bills
43.1 For supply : Monthly Bills for supply items for 80% value i.e. Ex-Works price with 100%
F&I and GST in original with one copy shall be submitted to Dy. CAO (Bills), at Corporate
Office for passing and processing for payment at Corporate Office. One copy of such bill is
to be submitted to Engineer in-charge i.e. concerned EE(Const) for their record &
preparation of all relevant documents.
43.2 10% payment out of balance 20% shall be released on completion of Sub –Station work,
handing over and acceptance by the Site Engineers in charge after rectification work if any
and settlement of material account according to actual quantity utilized for completion of
work. Bill for this payment shall be raised to Dy. CAO (Bills), Corporate Office with copy to
concern Ex. Engr. (Const).
43.3 Balance 10% payment for supply shall be released only after finalization of material account
and passing of final bill only. The contractor has to submit the final bill along with the material
consumption statement and other required data of the work carried out within 3 months from
the date of completion of work.
43.4 For Erection & Civil works: Monthly R.A Bills for erection 90% value of work executed and
GST in original with one copy shall be submitted to concerned EE(Const) for passing and
processing for payment.
43.5 Balance 10% payment for erection shall be released only after finalization of material
account and passing of final bill only. The contractor has to submit the final bill along with
the material consumption statement and other required data of the work carried out within
3 months from the date of completion of work.
43.6 All the bills in accordance with the above clauses must be submitted with the following
a) Item wise work done during billing period.
b) Item wise cumulative work done.
c) Account for material consumed and balance stock.
43.7 For non-submission or part submission of above information, an additional 5% amount of
the respective RA bill shall be withheld and shall only be released at the time of final bill.
CONTRACT SECURITY AND PAYMENTS
44.1 The payment to the Contractor for the performance of the works under the Contract will be
made by the Owner as per the guidelines and conditions specified herein. All payments
made during the Contract shall be on account payments only. The final payment will be
made on completion of all Works and on fulfillment by the Contractor of all his liabilities
under the Contract.
44.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
44.3 Further the payment shall be subject to fulfilling of following conditions:
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act
and submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
Seal & Signature of Bidder
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of Final Bill, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill as well as the final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and evidence
of payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
45.0 Payment Schedule
schedule shall be based on approved drawings & BOQ.
The tender BOQ is indicative. Supply & Erection of quantities shall be as per approved
Drgs. & BOQ and excess shall not be accepted.
45.1 Application for Payment
The Contractor shall submit application for the payment.
45.2 Each such application shall state the amount claimed and shall set forth in detail, in the
order of the Payment Schedule, particulars of the Works including the Works executed at
Site and of the equipment shipped/brought on to the site pursuant to the Contract up to the
date mentioned in the application and for the period covered since the last preceding
certificate, if any.
45.3 Every interim payment certificate shall certify the Contract value of the Works executed up
to the date mentioned in the application for the payment certificate, provided that no sum
shall be included in any interim payment certificate in respect of the works that, according
to the decision of the Engineer, does not comply with the Contract.
45.4 Mode of Payment
45.5 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank
or directly to the Contractor as per the payment schedule.
45.6 The payment of test charges, if any, payment, taxes and duties (whenever admissible)
inland transportation (including port handling), insurance and the erection portion of the
Works shall be made direct to the Contractor by the Owner.
45.7 All payments under the Contract shall be made as stipulated in the Contract after signing
the Contract Agreement. The payments linked with the dispatch of materials shall only be
made after production of all dispatch documents as specified in the relevant Contract
conditions which will interalia include the Material Inspection Clearance Certificate issued
Progressive payments linked with erection shall only be made after the issue of certificates
by the Engineer, one for the quantum of work completed and the other for the successful
completion of quality check points involved in the quantum of work billed.
45.8 Billing and breakup: Price breakup for supply items will be considered only for billing
purpose & not for actual payment. Payment for equipments supplied shall be released as
45.9 Inland Transportation & Insurance
Inland transportation (including port handling) and inland insurance charges shall be paid
to the Contractor on pro-rata to the value of the equipment received at site and on
Seal & Signature of Bidder
production of the invoices by the Contractor. However, wherever equipment wise inland
transportation charges have been called for in the ‘Bid Proposal Sheets’ and have been
furnished by the Contractor, the payment of inland transportation charges shall be made
after receipt of equipment at site based on the charges thus identified by the Contractor in
his Proposal and incorporated in the Contract. The aggregate of all such pro-rata payments
shall however not exceed the total amount quoted by the Bidder in his bid and incorporated
shall however not exceed the total amount quoted by the Bidder in his bid and incorporated
in the Contract.
46.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the
Contract the Contractor is liable, or any other retention award will be claimed by the Owner.
All such claims shall be billed by the Owner to the Contractor regularly as and when they
fall due. Such bills shall be supported by appropriate and certified vouchers or explanations,
to enable the Contractor to properly identify such claims. Such claims shall be paid by the
Contractor within thirty (30) days of the receipt of the corresponding bills and if not paid by
the Contractor within the said period, the Owner may then deduct the amount, from any
monies due or becoming due by him to the Contractor under the Contract or may be
recovered by sections of Law or otherwise.
47.0 Terms of Payment
The payment for materials to be supplied and erected shall be made as under only after
execution of the contract documents/furnishing of Security Deposit and on execution of
substation work.
47.1 For supply
(i) 80% of supply value for each consignment of Sub-Station material including accessories
on submission of invoice along with 100% GST, duties, F & I shall be paid from corporate
office within 30 days from actual material receipt date mentioned in SR Note after verifying
the following documents.
A. Tax invoice.
B. Delivery challan.
C. Endorsed RR / LR copy.
D. Dispatch clearance certificate / letter wherever applicable.
E. E Way Bill, if applicable
(ii) 10% payment out of balance 20% shall be released from corporate office on completion
of sub-station work, handing over and preliminary acceptance certificate issued by the site
engineers in charge after rectification work if any and settlement of material account
according to actual quantity utilized for completion of S/S. Supply to be made as per
approved drawing/ BOQ.
(iii) Balance10% of supply value shall be paid from corporate office on successful
commissioning of Sub-Station against completion certificate and only after settlement of
material account statement of items supplied, used, erected and successful commissioning
is settled for complete job and will be released only after passing of final bill.
(iv) Welfare Cess
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare
Cess Act and submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the
documentary evidence of registration. Only thereafter, the bill will be processed for
Seal & Signature of Bidder
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of Final Bill, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill as well as the final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and evidence
of payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of
documentary evidence of payment by observing due formalities.
47.2 For Erection works
(i) 90% payment of amount claimed covering various activities such as excavation, foundation,
erection, earthing, stringing of bus bar and earthwire including insulator hoisting works against
R.A. bills duly certified by EIC within 30 days from the date of R.A. bill.
(ii) Balance 10% of erection value shall be paid against commissioning of Sub-Station only
after settlement of material account statement of items supplied, used, erected and successful
commissioning of Sub-Station line the same amount will be release in final bill only and
payment will be made only after passing of final bill.
(iii) If net payable amount is more than Rs 5.0 Lacs, payment will be released from circle
office/corporate office.
(iv) Welfare Cess
The modality of payment/ reimbursement of welfare cess will be as under.
On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office.
Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
Before release of payment of Final Bill, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill as well as the final bill.
If the R.A.Bill happens to be first and final bill, then before release of payment, contractor has
to submit documentary evidence of registration under Welfare Cess Act and evidence of
payment of welfare cess.
The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
48.0 TAKING DELIVERY AND INSURANCE:
48.1 The contractor has to keep S/S materials in safe custody and transport to the respective sites
and will be fully responsible for any damage to or loss of all materials at any stage during
transportation or erection till taking over of the S/S by GETCO.
48.2 The Contractor has to open site store and ensure for safe custody of all the stored materials
at his own cost.
48.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment
and works from theft, fire pilferage and any other damages and loss. It shall be the
responsibility of the contractor to arrange for security till the works are finally taken over by the
48.4 STORAGE-CUM-INSURANCE:-The contractor shall take suitable storage-cum-erection
insurance cover at his cost to the extent of 100 % cost of S/S materials, which are required to
Seal & Signature of Bidder
complete the S/S. Contractor shall have to take comprehensive insurance policy against any
loss, damage, theft, pilferage, fire etc. for the complete period of storage, erection and
commissioning up to the time of taking over of the S/S by GETCO. The Contractor shall deal
directly and pursue the claim with the Insurance Company and shall be responsible in regard
to maintenance of all insurance coverage as well as for settlement of claim. The proof of
insurance policy taken by the successful Contractor shall be furnished to Engineer-In-Charge.
In absence of the above insurance policy, R.A. Bill payment will be with held.
48.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items, materials and
the GETCO shall be kept informed about it. Contractor shall replace the lost / damaged
materials / items promptly irrespective of the settlement of the claims by underwriter and ensure
that the work progress is as per agreed schedule. The loss, if any, such replacement will have
to be borne by the Contractor and GETCO will not entertain any claim / representation in this
regard. However it will be contractor's responsibility to insure the entire project till the S/S is
taken over by the GETCO.
49.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance Bidder’s attention is specifically invited to these clauses. Bid price
shall include all the costs in fulfilling all the insurance liabilities under the Contract.
49.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and interests of
the Owner against all perils detailed herein. The form and the limit of such insurance as
defined herein together with the under-writer in each case shall be acceptable to the Owner.
However, irrespective of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of Contractor alone.
The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall
be in the joint name of the Owner and the Contractor. The Contractor shall, however, be
authorized to deal directly with Insurance Company or Companies and shall be responsible
in regard to maintenance of all insurance covers. Further the insurance should be in freely
convertible currency.
49.2 Any loss or damage to the equipment during handling, transportation, storage, erection,
putting into satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the Contractor.
The Contractor shall be responsible for preference of all claims and make good the
damages or loss by way of repairs and/or replacement of the equipment, damaged or lost.
The transfer of title shall not in any way relieve the Contractor of the above responsibilities
during the period of Contract. The Contractor shall provide the Owner with copy of all
insurance policies and documents taken out by him in pursuance of the Contract. Such
copies of documents shall be submitted to the Owner immediately after such insurance
coverage. The Contractor shall also inform the Owner in writing at least sixty (60) days in
advance regarding the expiry/cancellation and/or change in any of such documents and
ensure revalidation, renewal etc., as may be necessary well in time.
49.3 The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks,
loss or damage in transit, theft, pilferage, earth quake, riot and strikes and malicious
damages, civil commotion, weather conditions, accidents of all kinds, etc. The scope of
such insurance shall be adequate to cover the replacement/reinstatement cost of the
equipment for all risks up to and including delivery of goods and other costs till the
equipment is delivered at Site. The insurance policies to be taken should be on replacement
value basis and/or incorporating escalation clause. Notwithstanding the extent of insurance
cover and the amount of claim available from the underwriters, the Contractor shall be liable
Seal & Signature of Bidder
to make good the full replacement/rectification value of all equipment/materials and to
ensure their availability as per project requirements.
49.4 All costs on account of insurance liabilities covered under the Contract will be on
Contractor’s account and will be included in Contract Price, However, the Owner may from
time to time, during the pendency of the Contract, ask the Contractor in writing to limit the
insurance coverage, risks and in such a case, the parties to the Contract will agree for a
mutual settlement, for reduction in Contract price to the extent of reduced premia amount.
The Contractor, while arranging the insurance shall ensure to obtain all discounts on premia
which may be available for higher volume or for reason of financing arrangement of the
49.5 The clause entitled ‘Insurance’, covers the additional insurance requirements for the portion
of the works to be performed at the Site.
50.0 Contract Quality assurance:
50.1 The Bidder shall include in his proposal the Quality Assurance Programme containing the
overall quality management and procedures which he proposes to follow in the performance
of the Works during various phases as detailed in relevant clause of the General Technical
50.2 At the time of Award of Contract, the detailed Quality Assurance Programme to be followed
for the execution of the Contract will be mutually discussed and agreed and such agreed
Programme shall form a part of the Contract.
50.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are
being supplied. Such details shall be accompanied by their list of previous supplies made
performance reports etc. However, in case of orders are placed, specific approval shall be
obtained from the owner for the vendor supplied materials. The quality assurance program
shall be furnished for each material separately for approval.
51.0 Erection Tools And Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special
equipment tools & tackles etc. which he proposes to bring to site for the purpose of erection,
handling, testing and commissioning including performance and guarantee tests of the
equipment. However such tools tackles brought to the site for purpose of erection, handing
testing & commissioning shall remain property of the contractor and can be taken back after
completion of the work.
52.0 Brand Names:
52.1 The specific reference in these specifications and documents to any material/equipment by
brand name make or catalogue number shall be construed as establishing standards of
quality and performance and not as limiting competition. However, Bidders may offer other
similar material/equipment provided they meet the specified standard, design and
performance requirements. The Bidder shall furnish adequate technical information about
such alternative material equipment to enable the Owner to determine its acceptability. The
Owner shall be the sole judge on the acceptability or otherwise of such alternatively
material/equipment.
52.2 The bidder shall note that standards for workmanship material and equipment, and
reference to brand name of catalogue numbers designed by the Owner in its Technical
Specifications are intended to be descriptive only and not restrictive. The Bidder may
substitute alternative standards, brand name and/or catalogue numbers in its bid, provided
that it demonstrates to the Owner’s satisfaction that the substitutions are substantially
equivalent or superior to those designed in the Technical Specification.
Seal & Signature of Bidder
53.0 CONTRACT DOCUMENTS
53.1 The term Contract Documents shall mean and include the following which shall be deemed
to form an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, General Terms
and Conditions of Contract and all other documents included under Part I and the
Special Conditions of Contract.
b) Specifications of the equipment to be furnished and erected under the Contract as
brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters
of clarifications thereto between the Contractor and the Owner prior to the Award of
Contract except to the extent of repugnancy.
d) All the materials, literature, data and information of any sort given by the Contractor
along with his bid, subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and
special terms and conditions of Contract, if any.
53.2 In the event of any conflict between the above mentioned documents the matter shall be
referred to the Engineer whose decision shall be considered as final and binding upon the
54.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
54.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract,
or any provision thereof, or any specification, plan, drawing, pattern, sample or information
furnished by or on behalf of the Owner in connection therewith, to any person other than a
person employed by the Contractor in the performance of the Contract. Disclosure to any
such employed person shall be made in confidence and shall extend only so far as may be
necessary for the purpose of such performance.
54.2 The Contractor shall not, without the Owner’s prior written consent, make use of any
document or information enumerated in various Contract documents except for the purpose
of performing the Contract.
54.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in
any other medium, photographs or other reproduction of the Works under this Contract, or
descriptions of the site, dimensions, quantity, quality or other information, concerning the
works unless prior written permission has been obtained from the Owner.
54.4 Any document, other than the Contract itself, enumerated in various Contract documents
shall remain the property of the Owner and shall be returned (in all copies) to the Owner on
completion of the Contractor’s performance under the Contract if so required by the Owner.
55.0 CONSTRUCTION OF THE CONTRACT
55.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered
into will be treated as a works contract for Civil, Supply and Erection work. However,
Separation of the Contract into Supply of Goods, Services and Civil Work, is only for
convenience and better economical management and for the ease of Accountancy
but the entire Contract, is to be assessed under GST Law, as a contract for composite
supply under the category of Works Contract, which is, as per the provisions of
Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a) of the
Seal & Signature of Bidder
Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions,
applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity,
would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST,
under the GST Law. However, Classification Codes for different segments or portions
of the Works Contract, may be specified separately, in the Supplies, with a final
common Classification Code of Works Contract Service.
55.2 In case of divisible supply and erection Contract, or where the Owner hands over his
equipment to the Contractor for executing, then the Contractor shall at the time of taking
delivery of the equipment/dispatch documents be required to execute an Indemnity Bond in
favour of the Owner in the form acceptable to the GETCO for keeping the equipment in safe
custody and to utilize the same exclusively for the purpose of the said Contract. Samples
of proforma for the Indemnity Bond will be furnished during award of Contract.
55.3 The Contract shall in all respects be construed and governed according to Indian Laws.
55.4 It is clearly understood that the total consideration for the Contract(s) has been broken up
into various components only for the convenience of payment under the Contract(s) and for
the measurement of deviations or modifications under the Contract(s).
56.0 JURISDICTION OF CONTRACT
56.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of
Vadodara shall have exclusive jurisdiction in all matters arising under this Contract.
57.0 EXECUTION OF CONTRACT:
57.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of
the final agreement to the Contractor for his scrutiny and approval.
57.2 The Agreement, unless otherwise agreed to, shall be signed within 30 days of the
acceptance of the Letter of Award, at the office the Owner at Vadodara on a date and time
to be mutually agreed. The Contractor shall provide for signing of the Contract, Performance
Guarantee, appropriate power of attorney and other requisite materials. In case the
Contract is to be signed beyond the stipulated time, the Bid Guarantee submitted with the
Proposal will have to be extended accordingly.
57.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided
with one signed original and the rest will be retained by the Owner.
57.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings,
and descriptive materials submitted with the bid including soft copy, to form a part of the
Contract immediately after issue of Letter of Award .
57.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the
Owner with copies of agreement within fifteen (15) days after the signing of the Contractor.
58.0 ENFORCEMENT OF TERMS
58.1 The failure of either party to enforce at any time any of the provisions of this Contract or any
rights in respect thereto or to exercise any option therein provided, shall in no way be
construed to be a waiver of such provisions, rights or options or in anyway to affect the validity
of the Contract. The exercise by either party of any of its rights herein shall not preclude or
prejudice either party from exercising the same or any other right it may have under the
59.0 COMPLETION OF CONTRACT
Seal & Signature of Bidder
59.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract
shall be deemed to have been completed on the expiry of the guarantee period as provided
for under the clause entitled ‘Guarantee’
60.0 REPLACEMENT OF DEFECTIVE PARTS AND MATERIALS
60.1 If during the performance of the Contract, the Engineer shall decide and inform in writing to
the Contractor that the Contractor has manufactured any equipment, material or part of
equipment unsound and imperfect or has furnished any equipment inferior to the quality
specified, the Contractor on receiving details of such defects or deficiencies shall at his own
expense within seven (7) days of his receiving the notice, or otherwise, within such time as
may be reasonably necessary for making it good, proceed to alter, reconstruct or remove
such works and furnish fresh equipment/materials up to the standards of the specifications.
In case, the Contractor fails to do so, the Engineer may on giving the Contractor seven (7)
days notice in writing of his intentions to do so, proceed to remove the portion of the works
so complained of and at the cost of the Contractor perform all such Works or furnish all
such equipment/ material provided that nothing in this clause shall be deemed to deprive
the Owner of or affect any rights under the Contract which the Owner may otherwise have
in respect of such defects and deficiencies.
60.2 The Contractor’s full and extreme liability under this clause shall be satisfied by the payment
to the Owner of extra cost, of such replacement procured including erection as provided for
in the Contract, such extra cost being the ascertained difference between the price paid by
the Owner for such replacements and the Contract Price by portion for such defective
equipment/materials/works and repayments of any sum paid by he Owner to the Contractor
in respect of such defective equipment/material. Should the Owner not so replace the
defective equipment/materials the Contractor’s extreme liability under this clause shall be
limited to repayment of all sums paid by the Owner under the Contract for such defective
equipment/materials.
61.0 PATENT RIGHTS AND ROYALTIES
Royalties and fees for patents covering materials, articles, apparatus, devices, equipment
or processes used in the works shall be deemed to have been included in the Contract
Price. The Contractor shall satisfy all demands that may be made at any time for such
royalties or fees and he alone shall be liable for any damages or claims for patent
infringements and shall keep the Owner indemnified in that regard. The Contractor shall,
at his own cost and expense, defend all suits or proceedings that may be instituted for
alleged infringement of any patents involved in the Works, and, in case of an award of
damages, the Contractor shall pay for such award. In the event of any suit or other
proceedings instituted against the Owner, the same shall be defended at the cost and
expense of the Contractor who shall also satisfy/comply with any decree, order or award
made against the Owner. But it shall be understood that no such machine, plant, work,
material or thing has been used by the Owner for any purpose or any manner other than
that for which they have been furnished and installed by the Contractor and specified under
these specifications. Final payment to the Contractor by the Owner will not be made while
any such suit or claim remains unsettled. In the event any apparatus or equipment, or any
part thereof furnished by the Contractor, is in such suit or proceedings held to constitute
infringement, and its use is enjoined, the Contractor shall at his option and at his own
expense, either procure for the Owner, the right to continue the use of said apparatus,
equipment or part thereof, replace it with non-infringing apparatus or equipment or modify
it, so it becomes non-infringing.
62.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the
Owner, for the failure, omission or neglect on the part of the Contractor to perform any acts,
matters, covenants or things under the Contract, or for damage or injury caused by the
alleged omission or negligence on the part of the Contractor, his agents, representatives or
his Sub-Contractors, or in connection with any claim based on lawful demands of Sub-
Contractors, workmen, suppliers or employees, the Contractor shall in all such cases
Seal & Signature of Bidder
indemnify and keep the Owner, and the Engineer and/or his representative, harmless from
all losses, damages, expenses or decrees arising of such action.
63.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only
at the end of the Guarantee/Warranty period, and till such time as the Contractual liabilities
and responsibilities of the Contractor, shall prevail. All other payments made under the
Contract shall be treated as on-account payments. The aggregate liabilities are limited up
to the total contract value.
64.0 ENGINEER’S DECISION
64.1 In respect of all matters which are left to the decision of the Engineer including the granting
or with-holding of the certificates, the Engineer shall, if required to do so by the Contractor,
give in writing a decision thereon.
64.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance
with the meaning and intent of the Contract, the Contractor may file with the Engineer, within
fifteen (15) days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of
the Engineer’s decision and the decision shall become final and binding.
64.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition
precedent to the right to request arbitration. It is the intent of the Agreement that there shall
be no delay in the execution of the works and the decision of the Engineer as rendered shall
be promptly observed.
65.0 POWER TO VARY OR OMIT WORK
65.1 No alterations, amendments, omissions, suspensions or variations of the Works
(hereinafter referred to as ‘variation’) under the Contract as detailed in the Contract
Documents, shall be made by the Contractor except as directed in writing by the Engineer,
but the Engineer shall have full powers subject to the provisions hereinafter contained, from
time to time during the execution of the Contract, by notice in writing to instruct the
Contractor to make such variation without prejudice to the Contract. The Contractor shall
carry out such variation and be bound by the same conditions as far as applicable as though
the said variations occurred in the Contract Documents. If any suggested variations would,
in the opinion of the Contractor, if carried out, prevent him from fulfilling any of his
obligations or guarantees under the Contract, he shall notify the Engineer thereof in writing
and the Engineer shall decide forthwith whether or not, the same shall be carried out and if
the Engineer confirms his instructions, the Contractor’s obligations and guarantees shall be
modified to such an extent as may be mutually agreed. Any agreed difference in cost
occasioned by any such variation shall be added to or deducted from the Contract Price as
the case may be.
65.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be
given to the Contractor to enable him to work his arrangement accordingly, and in cases
where goods or materials are already prepared or any design, drawings or pattern made
or work done as per the contract requires to be altered, a reasonable and agreed sum in
respect thereof shall be paid to the Contractor.
65.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either
then or later on, will in the opinion of the Contractor, involve a claim for additional payment,
the Contractor shall immediately and in no case later than thirty (30) days, after receipt of
Seal & Signature of Bidder
the instructions aforesaid and before carrying out the instructions, advise the Engineer to
that effect. But the Engineer shall not become liable for payment of any charges in respect
of any such variations, unless the instructions for the performance of the same shall be
confirmed in writing by the Engineer.
65.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree,
in writing, so to the extent of any change in the price, before the Contractor proceeds with
65.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said
sum, the decision of the Engineer shall prevail.
65.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power
to instruct the Contractor, in writing, during the execution of the Contract to vary the
quantities of the items or groups of items in accordance with the provisions of clause entitled
‘Change of Quantity’ in section GCC. The Contractor shall carry out such variations and be
bound by the same conditions as though the said variations occurred in the Contract
Documents. However, the Contract Price shall be adjusted at the rates and the prices
provided for the original quantities in the Contract.
66.0 ASSIGNMENT AND SUB-LETTING OF CONTRACT
66.1 The Contractor may, after informing the Chief Engineer (Project) & getting written approval,
assign or sub-let the Contract or any part thereof other than for raw material, for minor items
or for any part of the plant for which makes are identified in the Contract. Suppliers of the
equipment not identified in the Contract or any change in the identified suppliers shall be
subject to approval by the Chief Engineer. The experience of equipment vendors under
consideration by the Contractor for this Contract shall be furnished to the Chief Engineer
for approval prior to procurement of all such items/equipment. Such assignment/sub-letting
shall not relieve the Contractor from any obligation, duty or responsibility under the Contract.
Any assignment as above, without prior written approval of Chief Engineer, shall be void.
In case of Erection activity, the contractor may after getting written approval from
CE(Project), assign or sublet any part of erection or as a whole . To do so contractor have
to apply for such subletting with a clear proposal stating details & experience of the
subletting agency, along with the tender or within 30 days from the date of LOI & decision
thereof will be conveyed within 30 days there after by GETCO. The proposed erection
agency shall have experience of executing similar job of voltage class of 220Kv & above
and value equivalent to erection portion during last five years. The decision of competent
authority in this regard shall remain final and binding to the agency.
66.2 For components/equipment procured by the Contractor for the purposes of the Contract,
after obtaining the written approval of the Owner, the Contractor’s purchase specifications
and enquiries shall call for quality plan to be submitted by the suppliers along with their
Proposals. The quality plans called for from the Vendors shall set out, during the various
stages of manufacture and installation, the quality practices and procedures followed by the
Vendors’ quality control organization, the relevant reference document/standard used,
acceptance level, inspection documentation raised, etc. Such quality plans of the successful
vendors shall be discussed and finalized in consultation with the Engineer and shall form a
part of the Purchase Order/Contract between the Contractor and the Vendor. Within three
weeks of the release of the Purchase Orders/Contracts for such bought out
items/components a copy of the same without price details but together with detailed
purchase specifications, quality plans and delivery conditions shall be furnished to the
Engineer by the Contractor.
67.0 CHANGE OF QUANTITY
67.1 During the execution of the Contract, the Owner reserves the right to increase or decrease
the quantities of items under the Contract but without any change in unit price or other terms
Seal & Signature of Bidder
& conditions. Such variations unless otherwise specified in the accompanying GCC and/or
Technical Specifications, shall not be subjected to any limitation for the individual items but
the total variations in all such items under the Contract shall be limited to the extent of
30%(Thirty Percent ) of the contract price by way of suitable amendment to the contract.
67.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above. The base unit rates, as identified in the
Contract shall however remain constant during the currency of the Contract, In case the
unit rates are not available for the change in quantity, the same shall be subjected to mutual
67.3 As this is an EPC contract, Design will be done by the Contractor. Responsibility of material
will be that of the contractor.
68.0 PACKING, FORWARDING AND SHIPMENT
68.1 The Contractor, wherever applicable, shall after proper painting, pack and crate all
equipment in such a manner as to protect them from deterioration and damage during rail
and road transportation to the Site and storage at the Site till the time of erection. The
Contractor shall be held responsible for all damages due to improper packing.
68.2 The Contractor shall notify the Owner of the date of each shipment from his works, and the
expected date of arrival at the Site for the information of the Owner.
68.3 The Contractor shall also give all shipping information concerning the weight, size and
content of each packing including any other information the Owner may require.
68.4 The following documents shall be sent by registered post to the Owner within three days
from the date of shipment, to enable the Owner to make progressive payments to the
Application for payment in the standard format of the Owner
Pre-dispatch clearance certificate, if any
Test Certificate, wherever applicable
Insurance Certificate
68.5 The Contractor shall prepare detailed packing list of all packages and containers, bundles
and loose materials forming each and every consignment dispatched to Site.
The Contractor shall further be responsible for making all necessary arrangements for
loading, unloading and other handling right from his works up to the Site and also till the
equipment is erected, tested and commissioned. He shall be solely responsible for proper
storage and safe custody of all equipment.
69.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to
obtain the most efficient and economical design and to avoid unnecessary duplication of
efforts. The Engineer shall be provided with three copies of all correspondence addressed
by the Contractor to other Contractors and Consulting Engineers of the Owner in respect of
such exchange of technical information, wherever needed.
70.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or
agents nor any order by the Owner or the Engineer for payment of money or any payment
for or acceptance of, the whole or any part of the Works by the Owner or the Engineer, nor
any extension of time, nor any possession taken by the Engineer shall operate as a waiver
of any provision of the Contract, or of any power herein reserved to the Owner or any right
Seal & Signature of Bidder
to damages herein provided nor shall any waiver of any breach in the Contract be held to
be a waiver of any other or subsequent breach.
71.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner,
nor any extension of time for execution of the Works granted by the Engineer shall affect or
prejudice the rights of the Owner against the Contractor or relieve the Contractor of his
obligation for the due performance of the Contract, or be interpreted as approval of the
Works done or of the equipment furnished and no certificate shall create liability for the
Owner to pay for alterations, amendments, variations or additional works not ordered, in
writing , by the Engineer or discharge the liability of the Contractor for the payment of
damages whether due, ascertained, or certified or not or any sum against the payment of
which he is bound to indemnify the Owner, nor shall any such certificate nor the acceptance
by him of any sum paid on account or otherwise affect or prejudice the rights of the Owner
against the Contractor.
72.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at
his own cost submit periodic progress reports as may be reasonably required by the
Engineer with such materials as, in approved MS PROJECT ,charts, net-works,
photographs, test certificates, etc. Such progress reports shall be on monthly base for
supply items & fortnightly for erection activities in the form and size as may be required by
73.0 TAKING OVER
Upon successful completion of all the tests and commissioning by the Contractor, the
Engineer shall issue to the Contractor a Taking Over Certificate (TOC) as a proof of the
final acceptance of the equipment. Such certificate shall not unreasonably be withheld nor
will the Engineer delay the issuance thereof on account of minor omissions or defects which
do not affect the commercial operation and/or cause any serious risk to the equipment.
Such certificate shall not relieve the Contractor of any of his obligations which otherwise
survive, by the terms and conditions of the Contract after issue of such certificate.
In the event of completion of pre commissioning tests carried out jointly, if energization of
the substation is prevented for reasons not attributable to the successful bidder, the
Preliminary Acceptance Certificate shall be given within 30 days of pre commissioning tests
prior to Taking Over Certificate (TOC).
74.0 RISK DISTRIBUTION--TRANSFER OF TITLE
74.1 Transfer of title in respect of equipment and materials supplied by the Contractor to GETCO
pursuant to the terms of the Contract shall pass on to GETCO with negotiation of dispatch
74.2 This Transfer of Title shall not be construed to mean the acceptance and the consequent
“Taking Over” of equipment and materials. The Contractor shall continue to be responsible
for the quality and performance of such equipment and materials and for their compliance
with the specifications until “Taking Over” and the fulfillment of guarantee provisions of this
74.3 This Transfer of Title shall not relieve the Contractor from the responsibility for all risks of
loss or damage to the equipment and materials as specified under the clause entitled
“Insurance” of this Section
Seal & Signature of Bidder
75.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until
the successful completion of commissioning as defined else where in the Bid document.
76.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, wharf age and other expenses incurred due to delayed clearance of the
material or any other reason shall be to the account of the Contractor.
77.0 FORCE MAJEURE
77.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor
or the Owner as the case may be, which they could not foresee or with a reasonable amount
of diligence could not have foreseen and which substantially affects the performance of the
Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
b. Acts of any Government, domestic or foreign, including but not limited to war, declared
or undeclared, priorities, guarantees, embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause
notify the other in writing of such causes.
77.2 The Contractor or the Owner shall not be liable for delays in performing his obligations
resulting from any force majeure cause as referred to and/or defined above
The date of completion will, subject to hereinafter provided, be extended by a reasonable
time even though such cause may occur after Contractor’s performance of obligation has
been delayed due to other causes.
78.0 SUSPENSION OF WORK
78.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part
of the Works without invalidating the provisions of the Contract. Orders for suspension or
reinstatement of the Works will be issued by the Engineer to the Contractor in writing. The
time for completion of the works will be extended for a period equal to duration of the
78.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such
suspension of the works will be paid by the Owner, provided such costs are substantiated
to the satisfaction of the Engineer. The Owner shall not be responsible for any liabilities if
suspension or delay is due to some default on the part of the Contractor or his Sub-
79.0 CONTRACTOR`S DE FAULT
79.1 If the Contractor shall neglect to execute the works with due diligence and expedition or
shall refuse or neglect to comply with any reasonable order given to him, in writing by the
Engineer in connection with works or shall contravene the provisions of the Contract, the
Owner may give notice in writing to the Contractor to make good the failure, neglect or
contravention complained of. Should the contractor fail to comply with the notice within thirty
(30) days from date of serving the notice, then and in such case the Owner shall be at liberty
to employ other workmen and forthwith to execute such part of the works as the Contractor
may have neglected to do or if the Owner shall think fit, without prejudice to any other right
he may have under the Contract to take the work wholly or in part out of the Contractor’s
hands and recontract with any other person or persons to complete the works or any part
Seal & Signature of Bidder
thereof and in that event the Owner shall have free use of all Contractor’s equipment that
may have been at the time on the Site in connection with the works without being
responsible to the Contractor for fair wear and tear thereof and to the exclusion of any right
of the Contractor over the same, and
If the sum that the Contractor is entitled to be paid plus the costs incurred by the
Owner in completing the works, exceeds the Contract Price or the entire works if
entire works have been completed or the price for part of the works if part of the
works have been completed, the Contractor shall be liable for such excess.
If such excess in greater than the sums due to the Contractor, the Contractor shall
pay the balance to the Owner and if such excess is less than the sums due to the
Contractor, Owner shall pay the balance to the Contractor. For facilitating such
payment, Owner shall encash the Bank Guarantees of Contractor available with
Owner/s and retain such other payments due to the Contractor under Contract in
question or any other Contract that the Owner/s may have with the Contractor. Such
payment of excess amount shall be independent of the liquidated damages for delay which
the Contractor shall have to pay if the completion of work is delayed.
79.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his
liability to pay liquidated damages for delay in completion of Works .
79.3 Such action by the Owner as aforesaid the termination of the Contract under this clause
shall not entitle the Contractor to reduce the value of the Contract Performance Guarantee
nor the time thereof. The Contract Performance Guarantee shall be valid for the full value
and for the full period of the Contract including guarantee period.
80.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
80.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons
other than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall
in such an event give fifteen (15) days notice in writing to the Contractor of his decision to
80.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to
the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Owner, stop all further sub-contracting or purchasing activity related to
the work terminated, and assist Owner in maintenance, protection, and disposition of the
works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
80.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless
the Owner is satisfied that the legal representatives of the individual Contractor or of the
proprietor of the propriety concern and in the case of partnership, the surviving partners,
are capable of carrying out and completing the Contract the Owner shall be entitled to
cancel the Contract as to its in completed part without being in any way liable to payment
of any compensation to the estate of deceased Contractor and/or to the surviving partners
of the Contractor’s firm on account of the cancellation of the Contract. The decision of the
Owner that the legal representatives of the deceased Contractor or surviving partners of
the Contractor’s firm cannot carry out and complete the Contract shall be final and binding
on the parties. In the event of such cancellation the Owner shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
and/or the surviving partners of the Contractor’s firm liable to damages for not completing
81.0 FRUSTRATION OF CONTRACT
Seal & Signature of Bidder
81.1 In the event of frustration of the Contract because of supervening impossibility in terms of
Section 56 of the Indian Contract Act, parties shall be absolved of their responsibility to
perform the balance portion of the Contract, subject to provisions contained in sub-clause
81.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except
for reason of willful or flagrant breach by the Owner) and/or Contractor then the works under
the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for
financing to the Contractor in accordance with the terms of the Contract within three months
of the event, the parties hereto shall be relieved from carrying out further obligations under
the Contract treating it as frustration of the Contract.
81.3 In the event referred to in sub-clauses 81.1& 81.2 above the parties shall mutually discuss
to arrive at reasonable settlement on all issues including amounts due to either party for the
work already done on quantum merit_ basis which shall be determined by mutual
agreement between the parties.
82.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or
any one on his or their behalf in relation to the obtaining or to the execution of this or any
other Contract with the Owner, shall in addition to any criminal liability which it may incur,
subject the Contractor to the cancellation of this and all other Contracts and also to payment
of any loss or damage to the Owner resulting from any cancellation. The Owner shall then
be entitled to deduct the amount so payable from any monies otherwise due to Contractor
under the Contract.
83.0 DISPUTE RESOLUTION MECHANISM
83.1 Amicable Settlement:
Any dispute, difference, controversy or claim between the Parties arising out of or relating to
this contract, including interpretation, breach, termination or validity (hereinafter referred to
as “Dispute”), shall, upon written request of either Party, be referred to the authorized
representatives of the Disputing Parties for resolution. The authorized representatives shall
promptly meet and attempt to negotiate in good faith a resolution of the Dispute within thirty
(30) days of the service of the request.
83.2 Arbitration Under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act,
If the Parties fail to amicably resolve the Dispute as per Clause 83.1 above, or if contrary
claims remain unresolved, then, notwithstanding anything to the contrary elsewhere in the
Contract, the same shall be referred to arbitration under the provisions of the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act, 1992 (hereinafter referred to as “the Act”)
as amended from time to time, and the rules framed thereunder. The decision, award and
proceedings of the Tribunal shall be final, binding and conclusive upon the parties, subject
only to such remedies as may be available under the Act and any other applicable law in
83.3 Continuity of Performance:
During the pendency of any Dispute or arbitration proceedings, both Parties shall continue to
perform their respective obligations under the Contract.
83.4 Non-Affectation of Powers:
Reference to any Dispute resolution procedure, including arbitration, shall not affect the right
of the Owner and/or Engineer-in-Charge to take possession of or utilize the Contractor’s tools,
Seal & Signature of Bidder
plants, materials, stores or works as per the terms and conditions of the Contract, nor shall it
entitle the Contractor to stop the progress of work or affect the Owner’s rights under the
Contract to get work executed through alternate means, if so required under the contract.
83.5 Limitation:
Neither Party shall be entitled to invoke dispute resolution or arbitration under this clause
later than thirty (30) days after the expiration of the defects liability period, unless otherwise
provided under the Act.
84.0 ARBITRATION
84.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not
become final or binding as aforesaid shall be settled by arbitration in the manner hereinafter
84.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the
Contractor and the Owner and the third to be appointed as an umpire by both the arbitrators
in accordance with the Indian Arbitration Act. If either of the parties fails to appoint its
arbitrator within sixty (60) days after receipt of a notice from the other party invoking the
Arbitration clause, the arbitrator appointed by the party invoking the arbitration clause shall
become the sole arbitrator to conduct the arbitration.
84.1.2 The arbitration shall be conducted in accordance with provisions of Indian Arbitration Act
1996 or latest amendment thereof.
84.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time
for making the award. In the event of any of the aforesaid arbitrators dying, neglecting,
resigning or being unable to act for any reason, it will be lawful for the party concerned to
nominate another arbitrator in place of the outgoing arbitrator.
84.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction,
certification or valuation of the Engineer in accordance with the Contract, and neither party
shall be limited in the proceedings before such arbitrators to the evidence or arguments put
before the Engineer for the purpose of obtaining the said decision.
84.4 No decision given by the Engineer in accordance with the foregoing provisions shall
disqualify him as being called as a witness or giving evidence before the arbitrators on any
matter whatsoever relevant to the dispute or difference referred to the arbitrators as
84.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to
carry out their respective obligations under the Contract.
84.6 All questions, disputes or differences, whatsoever which may at any time arise between
the parties to this contract in connection with the contract or any matter arising out of or in
relation there to shall be referred to the “Gujarat public works contracts disputes arbitration
tribunal” as per the provisions of the Gujarat public works contracts disputes arbitration
tribunalact,1992.
The reference to arbitration proceedings under this clause shall not
a) Affect the right of the Engineer -in charge to take possession of all or any tools, plants,
materials and stores, in or upon the work or site therof or belonging to the contractor or
procured by him and intended to be used for the execution of the work or any part thereof.
b) Preclude the Engineer-in charge from utilizing the materials purchased by the Contractor
in any work or from removing such materials to other place, during the period the work
is stopped or suspended in pursuance of notice given to the contractor under General
Seal & Signature of Bidder
c) Entitle the contractor to stop the progress of the work or carrying out the additional or
altered work in accordance with the prevision of General Conditions for the work where
there is no specifications.
d) Preclude the GETCO from getting the work done by another agency. Neither party is
entitled to bring a claim to arbitration latest by thirty days after the expiration of the
defects liability period.
The provisions of the Arbitration Act,1992, Gujarat Public Works Contract Disputes
Arbitration Tribunal Act, 1992, and rules made there under shall apply to the arbitration
proceeding under this clause. “
This clause is intentionally left blank, as all arbitration matters are governed by Clause
above, in compliance with the Gujarat Public Works Contracts Disputes Arbitration Tribunal
Act, 1992 and GUVNL guidelines
85.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments
claimed and the payments received vis-à-vis the works executed, for reconciliation of
accounts with the Owner. The Contractor shall also prepare and submit a detailed account
of Owner Issue materials received and utilized by him for reconciliation purpose in a format
to be discussed & finalized with the Owner before the award of Contract.
86.0 LABOUR LAWS:
86.0.1 Persons below the age of 18 years shall not be employed for the work. No female worker
shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
86.0.2 Contractor shall maintain a valid labour license under the contract Labour (Regulation and
abolition) Act for employing necessary manpower required by him. In the absence of such
license, the contract shall be liable to be terminated without assigning any reason thereof.
86.0.3 The Contractor shall at his own expenses comply with all labour laws and keep the GETCO
indemnified in respect thereof. Some of the major liabilities under various labour and
industrial laws which the Contractor shall comply with, are as under:
i) Payment of contribution by way of Employer’s Contribution towards provident Fund,
Family Pension Scheme, Deposit Linked Insurance Scheme, Administrative
charges, etc. at the rates made applicable from time to time by the Government of
Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labour at the rate of Rs. 30/- or later
prevailing rate with the Office of Commissioner of Labour as per the Contract Labour
(Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labour (Regulation and Abolition) Act
and Rules framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of
one day for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per
Industrial Dispute Act. Any payment to the Contractor’s employee arising out of any
claim of disputes under the Industrial Disputes Act 1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
Seal & Signature of Bidder
The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various labour laws, in force from time to time, from Statutory
Authorities like State Government/ Government o India, which the Contractor shall have to
86.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding
deduction against employees Provident Fund and Family Pension Scheme in respect of
each concerned employee. Provident Fund and Family pension Scheme at the rate of 18%
(or at the rate made applicable by the Government from time to time of the wages. The
Contractor’s contribution and his workers contribution towards Provident Fund and Family
Pension Scheme shall be deposited by the Contractor with Regional Provident Fund
Commissioner, Ahmedabad.
86.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a
member of the Provident Fund, as the contribution to the Deposit Linked Insurance Scheme
with Regional Provident Fund Commissioner, Ahmedabad.
86.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates
86.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labour, shall be provided by the Contractor to his workers. He shall maintain Leave
Records, Leave Cards, for individual laborer which shall be duly verified, approved and
certified by the authorized Officer of the GETCO.
86.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and
under the liability insurance. The purchaser shall not be responsible for any payments of
compensation to the workers/supervisor of the contractor for fatal or non-fatal accidents
during the pendency of the contract.
86.6 The contractor shall employ adequate number of experienced skilled at site for daily
supervision and for maintenance of various registers and records required under the law
and contract. No payment for supervision shall be admissible.
86.7 CONTRACTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of
the GETCO also, Engineer-in-Charge and his staff against all actions, proceedings, claims,
demands, costs and expenses whatsoever, arising out of or in connection with the matters
referred herein above elsewhere and against all actions, proceedings, claims, demands,
costs and expenses which may be made against the GETCO or Government for or in
respect of performance of his obligation under the contract documents. The GETCO shall
not be liable for intervention of authority Government for or in respect of performance of his
obligation under the contract documents. The GETCO shall not be liable for or in respect of
or in consequence of any accident or injury to any workman or other person in the
employment of the Contractor or his Sub-Contractor and the contractor shall indemnify and
keep indemnified the GETCO against all claims, demands, proceedings, cost, charges and
expenses whatsoever in respect thereof or in relation thereto.
86.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be effected for all the Contractor’s employee engages in the performance
of this contract. If any of the work is sublet, the Contractor shall required the Sub-Contractor
to provide workmen’s employer’s liability insurance for the latter’s employees, such
employees shall be covered under the Contractor’s Insurance.
Seal & Signature of Bidder
86.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labours/ Workers as per
rates fixed under the minimum wages act. The wages of every Contract Labour
employed by him under this contract shall also be paid by him before the expiry of
7th day of the last day of the month in respect of the wages are payable (i.e. wages
of a month have to be paid by him in the first week of the next month). Any default
will result in cancellation of contract forthwith or else the contractor shall be
punishable to the extent of Rs. 100/- per each day or as per the prevailing rules of
b) The Contractor shall give his Telephone Number and Address to the GETCO, so
that, in case of labour trouble etc. the Contractor can be contacted. The Contractor
shall arrange to have his office outside the factory work premises and the Contractor
shall arrange to have his office outside the factory work premises and the Contractor
shall keep himself present throughout the working hours.
86.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender
will not be considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by RPFC, along
with the tender.
87.0 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within
contractual period of delivery or in case the stores are found not in accordance with
prescribed specification and/or the approved sample, the GETCO shall exercise its
discretionary power either:
87.1 To recover, from the contractor as agreed, by way of penalty clause above, or
87.2 To purchase from elsewhere after giving due notice to the contractor on account and at
the risk of the contractor for such stores not so delivered or other similar description
without canceling the contract in respect of the consignment not yet due for delivery or
88.00 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the
GETCO shall be final. In the event of action taken under clause above, the contractor
shall be liable to pay for any loss which the GETCO may sustain on that account, but
the contractor shall not be entitled to have any saving on such purchases made against
The decision of the GETCO shall be final as regards to the acceptability of stores
supplied by the contractor and the GETCO shall not be required to give any reason in
writing or otherwise at any time for rejection of the stores.
89.0 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder
has to reduce all the quoted rates proportionately. The reduction on overall basis will
not be accepted (i.e. all unit rates of erection schedule shall be reduced proportionately
by difference in percentage). The confirmation for matching end cost shall be given
within 7 (seven) days from the letter from GETCO.
90.0 INTRODUCTION OF LEAVY OF TCS.
TCS @ 0.075% / 0.1% will be payable extra subject to fulfilment of the conditions
of sub section (1H) of section 206C of Income Tax Act, 1961. The format of
undertaking is attached as schedule – 20 in the tender.
Seal & Signature of Bidder
90.0 Deduction of TDS under GST:
“TDS under GST @ 2 % (1 % CGST & 1 % SGST or 2 % IGST, as applicable) or at
the applicable rate from time to time, will be deducted from the bill of the
Suppliers / Contractors at the time of credit or payment. TDS certificates in the
prescribed format will be issued as per prescribed rules under GST
91. Bidder should follow the GOI guideline of Restrictions under rule 144 (xi) of the General
Financial Rules (GFRs), 2017 vide office memorandum no. F.No.6/18/2019-PPD Dt:
23.07.2020. The copy of subject memorandum is attached in technical specification
92. Responsibility for correctness of the information submitted in the bid lies with bidder. If
any information furnished in the bid is proved to be false at a later date, GETCO reserve
right to reject the bid and the bid will not only be rejected but the bidder will be
BLACKLISTED as per GUVNL Policy
93. Use of ‘Call Before u Dig’ (CBuD) mobile application:
Bidder is note that it is mandatory to use ‘Call Before u Dig’ (CBuD) mobile application
for all excavators prior to any type of excavation / digging
GENERAL INFORMATION (TECHNICAL)
1.1. CODES, STANDARDS & REGULATIONS
The design, manufacture, erection and testing of the equipments and material to be supplied shall
comply with latest revisions of relevant Indian Standards or equivalent IEC standards.
In addition, the Indian Electricity Rules, Electricity Act 2003,Statutory requirements of Central Govt.,
GERC and State Government of Gujarat( applicable codes), shall also be complied with. Any
complications arising out of it will be set right by the bidder without any implication to Corporate.
The bidder shall submit his offer as per information given in submission of tender.
Drawings, Data and Documents
The bidder shall furnish following documents/ information along with offer in spiral bound volumes.
General description of equipment offered specifying the important features, make, technical
parameters, materials of construction etc. To enable GETCO to have proper understanding of the
material offered and its operation.
The following drawings and documents shall be furnished to GETCO by the successful bidder for
approval of GETCO, within the period stipulated in the draft contract/mutually agreed terms at the
time of placement of order, the bidder shall submit a list of all such drawings and documents he
proposes to submit. The list will be approved by GETCO and may be modified, if necessary. Each
drawing /document in the list shall be identified with a serial number, description and scheduled
date of submission. This should be submitted in a spiral bound volumes.
1.2. MAJOR DOCUMENTS & DRAWINGS REQUIRED FOR APPROVAL:
Switchyard Single Line Diagram
Switchyard Layout Plan and Sections.
Protection SLD with all details of relays and wiring
Control room Layout
Seal & Signature of Bidder
Equipment Earthing Philosophy supported by all drawings and description of
Earthing Layout showing Earth Mat(s),treated and untreated earth electrodes
supported by complete Earthing system ( mat) design calculations
Illumination Layout for switchyard and control room with design calculations
Erection Key Diagram with BOQ
Equipment Clearance Check Diagram ( Clearances shown for each and every
portion of switch yard ,inter-equipments ,equipments to tower/structures )
Direct Stroke of Lightning Protection Layout with full design calculations.
Sag Tension Calculations
Other Design Calculations required for Sub-Station
SS ( gantry )Structure drawings along with design calculations ( wherever design
of structure is given by GETCO it can be exempted)
All the equipment’s Structure drawings along with Design Calculations.
Control and power cable philosophy and cable schedules for all the bays.
Drawings for all the equipments & materials as per bidding schedule supported
by required calculations related to design/rating /temp rise
Field Quality Plan for Sub-Station
1.3. FOR REFERENCE
OEM’s Complete and comprehensive instruction manuals with drawings for operation and
maintenance of the equipments supplied by the bidder. This shall also include the
Static and dynamic loading of all major equipment
Inter panel wiring of all equipment
Inter panel wiring and terminal block arrangement
External connection diagram, panel wise and scheme wise
Composite drawings showing circuit of switchgear remote panels and other
items to complete circuit for its proper functioning.
Log sheets indicating daily/ hourly recording of power system parameters to be noted down
by GETCO operating person. The parameter shall indicate loading of various electrical
equipment, quality of power supply, energy consumption and maximum demand of sub-
Preventive maintenance schedule for each equipment.
Procedure for shutdown and energization of switchyard and HT equipment.
Safety procedures for safe operation of equipment and complete system.
Test procedure for site tests.
1.4. AS- BUILT DRAWINGS
On completion of installation, testing and commissioning, the bidder shall incorporate revisions/
modification if any, in the reproducible and submit ‘as built’ drawing for GETCO’s record in spiral
bound volumes and soft copy. The drawings shall be in Auto cad DXF format.
1.5. TEST AND INSPECTION FOR INDIVIDUAL ITEM
Routine test/ Acceptance tests shall be carried out on all equipment at manufacture’s works as per
appropriate IS/IEC. The bidder shall make reasonable facilities, at his cost for inspection and testing
of the equipment/material by GETCO’s Officials. No equipment shall be dispatched to site without
provisional certificates of acceptance issued by GETCO. Inspection and test shall be carried out at
the place of manufacture as well as on receipt of the equipment at site if required. Inspection and
tests do not relieve the bidder of his contractual obligations regarding performance of the equipment
at site/in actual use.
Seal & Signature of Bidder
The bidder shall submit the brief summary of all type test certificates for similar equipment
supplied by him elsewhere and the actual type test certificates as and when asked. In case type
test certificates for similar equipment is not available, the same shall be conducted in the presence
of GETCO’s Authorized representative if GETCO so desires, without any financial implications to
the GETCO. The type test report shall not be older than 5 year from the date of tender opening
(Technical bid opening).
The supplier of the equipment shall ensure that the equipment available at his works for
routine test/type test/acceptance test are duly calibrated and necessary certificate shall be made
available to the inspecting officer of GETCO.
As far as possible, the supplier of equipment shall give a minimum of 15 days notice of
readiness of material and give the inspection call accordingly. If on arrival of inspecting officer at
the works, the material is not found to be ready, the concerned supplier of equipment shall be liable
for additional expenditure GETCO may incur on account of retention or re-deputation of the
inspecting officer.
The officer deputed for inspecting for particular lot of material according to intimation from
you may also like to check Quality Control Plan and for that purpose he may demand the Test
Reports of raw material being procured.
1.6. FUNCTIONAL AND COMPOSITE TESTING
Following test shall be conducted on equipment after completion of erection in the presence of
Engineer -in-charge from point of view of completeness in the presence of GETCO’s Authorized
Representative.
Visual inspection of total system.
Checking of continuity of power and control cables.
Checking of insulation by secondary injection or by primary injection.
Calibration of meters by secondary injections or by primary injection.
Checking of protective schemes.
Setting of relays and the checking of their operation with one lower and one
higher setting.
Checking of control scheme of breakers, etc. as per approved drawing and as
per actual requirement.
Checking of alarm and as per actual simulation of faults.
Checking of nameplate data of complete system.
Verification and measurement of earthing resistance.
Checking of cable terminations and laying, dressing etc. in the equipment kiosk
and control panels.
Checking of safe accessibility of components.
All the equipments and materials shall be passed through checks and test as per approved Field
The insulation resistance test shall be carried out on the following equipments.
EHV installation - by 5000 V Megger
HV installation above 11 KV - by 2500V Megger
Power circuit of voltage up to 1KV- by 1000 V Megger
A.C. & D.C. auxiliary circuits - by 500 V Megger
1.7. BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts in M.S. Project and project schedules
indicating starting and completion dates of each activity, such as preparation & approval of
drawings, manufacturing/supply/ delivery, civil works, erection, testing, pre commissioning and
commissioning etc.
1.8 SCADA & Protection Architecture
SCADA & Protection architecture is based on IEC-61850 ring topology using ‘Bay Oriented’
approach. This concept includes Protection IEDs, Bay Control Units BCUs, LAN equipments etc.
are to be installed in dedicated chambers (Yard-kiosks) close to primary equipments of switch-yard.
Seal & Signature of Bidder
All such equipments are to be connected through fiber optic cable in ring fashion. HMI PCs, DR
work station PC, DAS metering PC, ABT metering PC, GPS, Gateway for RTU, Gateway for RCC
and Printers are connected via switches and placed in Control Room.
Identification labels shall be provided on all equipments as per client’s approval. All labels shall be
engraved on plastic (white letters with black background) and all text shall be in English language.
Any exclusion /deviation from specification shall be clearly spelt out and listed at one place only
and bidder shall substantiate the same with appropriate reasons. In the absence of clearly spelt
out and mutually agreed deviation, it shall be considered that the bidder has undertaken to comply
with the technical specification totally, in letter and spirit.
It will be responsibility of the successful bidder to obtain necessary approval of statutory authority
as per rules of Govt. of Gujarat and Central Electricity Authority for the work under his scope before
energizing/ charging the equipment/system. However bidder shall be extended all assistance by
the GETCO in regard to application for the same.
The installation for the equipment shall include civil works and necessary material required to
complete the Installation. It may be noted that foundation details for structure should be got
approved from GETCO.
Before dispatch to the Site, but before energization, all components/ accessories which are
intended to be painted shall be thoroughly cleaned of rust, scales, greases, etc. and painted with
two coats of proper primer. This shall be followed by two coats of finishing paint of the colour
specified/approved by the GETCO. Damage to the painting surface during transit/ erection shall be
made good by the bidder free of cost before the equipment is finally accepted by the Engineer- In
For installation work at site, the bidder shall be fully responsible for arranging the supply of required
tools and tackles, welding sets, pipe bending machine, cable crimping tools, labours, scaffolding,
The power connection will be provided by GETCO at one point only at the prevailing tariff, from
where the bidder has to arrange for temporary connection and further distribution of supply at his
own cost. Similarly, bidder has to arrange for water by pipeline or by water tankers or by drilling
bore in S/S at his cost.
The installation of energy meter, cut out, switches etc. for construction power shall be as per
prevailing norms of Distribution Department of GETCO. The test report and other requirement to
release the connection shall be as per prevailing rules of Distribution Department of GETCO.
On completion of the installation but before energizing the system, all installation shall be physically
checked and properly tested. These checks and tests shall be conducted by the bidder under the
supervision of Engineer In-charge and bidder shall furnish the final status and test results shall be
made good by the bidder free of cost within contract completion period.
All clamps, brackets, bolts, nuts, screws, markers, ferrules, lugs and glands and other hardware
necessary for erection work, shall include in the scope of work and shall be arranged by the bidder.
2.0 GALVANISING
All the Equipments/material shall be hot dip galvanized. Wherever it is not feasible to provide
galvanized equipment/material shall be painted to withstand heavily polluted atmospheric
conditions. Painting should be done with two coats of Red oxide & two coats of epoxy paints of
3.0 APPROVED MAKES OF EQUIPMENTS /ITEMS OF SUPPLY.
Seal & Signature of Bidder
Bidder have to supply material through approved vendor of GETCO who meet the PQR
requirement as per respective specification.
4.0 INSPECTION AND TESTING OF EQUIPMENT
Manufacturing Progress reviews, inspection & testing of equipment covered under the technical
specification shall be carried out by the GETCO’s Authorized Representative at the manufacturer’s
works/premises prior to dispatch, to ensure that their quality & workmanship are in conformity with
the contract specifications and approved drawings.
4.2 RESPONSIBILITY FOR INSPECTION
Any inspection by the GETCO’s Authorized Representative does not relieve the Bidder from his
responsibility of quality assurance and quality control functions.
As such, any approval which the Inspecting Engineer of the GETCO may have given in respect of
equipment and other particulars and the work or workmanship involved in the contract (whether
with or without test carried out) shall not bind the GETCO to accept the plant & equipment, should
it on further tests at site be found not comply, with the requirements of the contract. If required,
audit wing of GETCO HO Inspection Department shall also be entrusted with inspection of
particular item/equipment received at site.
The bidder is to meet the inspection & testing requirements for the equipment coming under the
statutory regulations e.g. weights & measures, safety, IE rules, etc. and submit calibration
certificates and documents from appropriate authority to the GETCO Inspecting Engineer for the
same, on demand.
4.3 EXTENT OF INSPECTION
The extent of inspection & testing by the GETCO shall vary from equipment to equipment as per
design requirements, if necessary.
Extent of inspection to be carried out shall be finalized with the Bidder after award of the contract
on the basis of scope of supply, technical specification and approved GA drawings.
Following standard bought-out items shall be accepted on the basis of manufacturer’s test
LV current transformers.
Standard AC motors up to 10 KW rating and smaller KW rating.
Push button in manufacture’s standard enclosure.
Starters in manufacture’s standard enclosure.
Thermocouples.
Level switches.
Pressure switches.
Pressure gauges.
Lighting fittings, switches, fans, wires, plug, sockets etc.
4.4 METHOD OF GIVING INSPECTION CALLS
Inspection calls shall be given by the Bidder to Chief Engineer (Projects) GETCO, HO, Baroda in
accordance with mutually agreed program with 15 days’ clear time for all equipments. Four sets of
relevant test certificates and inspection report of the Bidder/ Sub-bidder after satisfactory
completion of internal inspection and test shall be submitted along with acceptance/routine test
certificate of the tests witnessed by GETCO Inspector.
The GETCO reserves the right to visit at any stage of manufacture at plant and ask for additional
inspection & tests if it is found necessary after completion of detailed design & engineering and
approval of drawings.
Seal & Signature of Bidder
The GETCO or his duly authorized representative shall on giving written instructions to the bidder,
setting out any grounds of objection which he may have in respect of the work, be at liberty to reject
all or any part of plant/equipment or workmanship which are not in conformity with the contract
4.5 BIDDER’S RESPONSIBILITY
The Bidder shall provide all reasonable facilities to the Inspecting Engineer of the GETCO to the
Bidder’s or their sub-bidder’s premises at any time during contract period, to facilitate him to
carryout inspection & testing of equipment during manufacture of equipment.
The Bidder shall delegate a representative/coordinator to deal with GETCO on all inspection
The Bidder shall comply with instructions of the GETCO’s Inspecting Engineer fully.
The Bidder shall ensure that the equipment and materials once rejected by the Inspecting Engineer
are not reused in the manufacturing of the equipment and materials. Where parts rejected by the
Inspecting Engineer have been rectified as per agreed procedures laid down in advance, such
parts shall be segregated for separate inspection and approval, before being used in the work.
5.0 INSPECTION WAIVER
For certain standard bought-out items and the products of reputed firms where the GETCO has
earlier experience on the quality of their products, the GETCO may consider allowing of inspection
waiver for such items. The Chief Engineer (Projects) GETCO, Baroda shall issue approval of
inspection waiver certificate after scrutiny of bidder’s internal inspection report, test certificates and
other documents. However, it is not binding upon GETCO to give waiver on bidder’s request.
GETCO may weigh the important issues like quantity of material, cost of material, importance of
material, distance of travel & time of travel required to inspect before deciding the waiver of the
6.0 OTHER CONDITIONS
Any clarification / amendment necessary, in any or more clauses incorporated in the present A/T,
you will have to make a detailed reference to the GETCO latest within ten days from the receipt of
A/T. If you fail to do so, no request for any clarification / amendment shall be considered thereafter.
Please also note that all the points which need clarification / amendment should be brought out at
once. No piecemeal clarification/amendment will be entertained.
Seal & Signature of Bidder
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be
performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and
coordination of the works to be performed at Site. Such person shall function from the Site
office of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act,
and the Payment of Wages Act (both of the Government of India) and the rules made there
under in respect of any employee or workman employed or engaged by him or his Sub-
Contractor. He shall abide by labour laws .
2.2 All initial registration and statutory inspection fees, if any, in respect of his work pursuant to
this Contract shall be to the account of the GETCO. Should any such inspection or
registration need to be re-arranged due to the fault of the Contractor or his Sub Contractor,
the additional fees to such inspection and/or registration also shall be borne by the
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all equipment brought to the Site for the purpose of erection,
testing and commissioning of the equipment to be supplied & erected under the Contract.
The Owner shall continue to hold the lien on all such equipment throughout the period of
Contract. No material brought to the Site shall be removed from the Site by the Contractor
and/or his Sub-Contractors without the prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the
Owner in reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such
time as the Owner may approve and the Owner shall give the Contractor reasonable
facilities for carrying out the works.
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site,
except by the special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose
of the Contract. Any written order or instruction of the Engineer or his duly authorized
representative shall be communicated to the said authorized resident representative of the
Contractor and the representative shall be available at a stated address for this purpose.
Seal & Signature of Bidder
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who
may be performing other works on behalf of the Owner and the workmen who may be
employed by the Owner and doing work in the vicinity of the Works under the Contract. The
Contractor shall also so arrange to perform his work as to minimize, to the maximum extent
possible, interference with the work of other Contractors and their workmen. Any injury or
damage that may be sustained by the employees of the other Contractors and the Owner,
due to the Contractor’s work shall promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of
his employees and workmen at Site. The Engineer shall be at liberty to object to the
presence of any representative or employee of the Contractor at the Site, if in the opinion
of the Engineer such employee has misconducted himself or is incompetent or negligent or
otherwise undesirable and then the Contractor shall remove such a person objected to and
provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity
plans and schedules for carrying-out each part of the works. Any review of such plan or
schedule or method of work by the Engineer shall not relieve the Contractor of any of his
responsibilities towards the field activities. Such reviews shall also not be considered as
an assumption of any risk or liability by the Engineer or the Owner or any of his
representatives and no claim of the Contractor will be entertained because of the failure or
inefficiency of any such plan or schedule or method of work reviewed. The Contractor shall
be solely responsible for the safety, adequacy and efficiency of plant and equipment and
his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site
including the safety of all persons employed by him or his Sub–Contractor and all the
properties under his custody during the performance of the work. This requirement shall
apply continuously till the completion of the Contract and shall not be limited to normal
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if
any, photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities
shall highlight comparison to the schedules. The report shall also indicate the reasons for
the variance between the scheduled and actual progress and the action proposed for
corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours
schedule for the month, detailing the man hours scheduled for the month, skill-wise and
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken
over by the Engineer. No claim will be entertained by the Owner or by the Engineer for any
Seal & Signature of Bidder
damage or loss to the Contractor’s works and the Contractor shall be responsible for
complete restoration of the damaged works to original conditions to comply with the
specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees
with experience of his particular work. No person below the age of eighteen years shall be
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole
responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government
agency under any of the provisions of the Minimum Wages Act, Workmen Compensation
Act, Contract Labour Regulation Abolition Act or any other law due to act of omission of the
Contractor, the Owner may make such payment and shall recover the same from the
Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make
available at site, land for construction of Contractor’s field office, workshop, stores, etc.
required for execution of the Contract. Any such temporary construction shall be done by
the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer.
Until and unless the Contractor has handed over the vacant possession of land allotted to
him for the above purpose, the payment of his final bill shall not be made.
13.2 Electricity:
The concerned EE (Const.) shall apply for 11KV Transformer Center at the site of new
Substation and for which concerned DISCOM shall erect the required line and install the
transformer Center, for which, the cost is to be borne by GETCO. Subsequently, the Agency
finalized for EPC contract by GETCO, shall apply for temporary connection to the concerned
DISCOM Sub-Division paying required Service Charges and Deposit. Such temporary
connections to be released on the name of EPC-Contractor on recommendation of the
concerned EE (Const.). The power so consumed shall be charged at the prevailing tariff
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings
required for pre-assembly, erection, testing and commissioning of the equipment covered
under the Contract. He shall submit a list of all such materials to the Engineer before the
commencement of work at Site. These tools and tackles shall not be removed from the Site
without the written permission of the Engineer.
14.2 The Contractor shall provide necessary first-aid facilities for all his employees,
representatives and workmen working at the Site. Enough number of Contractor’s
personals shall be trained in administering first-aid.
14.3 Cleanliness
Seal & Signature of Bidder
14.3.1 The Contractor shall be responsible for keeping the entire area allotted to him clean and
free from rubbish, debris etc. during the period of Contract. The Contractor shall employ
enough number of personnel to keep the work area clean. Materials and stores shall be so
arranged to permit easy cleaning of the area. In areas where equipment might drip oil and
cause damage to the floor surface, a suitable protective cover of a flame resistant, oil proof
sheet shall be provided to protect the floor from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
horizontal and vertical control points will be established and marked by the Engineer at site
at suitable points. These points shall be used as datum for the works under the Contract.
The Contractor shall inform the Engineer well in advance of the times and places at which
he wishes to do work in the area allotted to him so that suitable datum points may be
established and checked by the Engineer to enable the Contractor to proceed with his
works. Any work done without being properly located may be removed and/or dismantled
by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize
fire hazards to the extent practicable. Combustible materials, combustible waste and
rubbish shall be collected and removed from the Site at least once each day. Fuels, oils
and volatile or inflammable materials shall be stored away from the construction and
equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained
for fire fighting. Enough of such trained personnel must be available at the Site during the
entire period of the Contract.
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor shall
make suitable security arrangements ensure the protection of all materials, equipment and
works from theft, fire, pilferage and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment furnished and erected
by the Contractor shall be the responsibility of the Contractor as detailed in relevant clauses
of Technical Specifications. The Contractor shall provide, in addition, test instruments,
calibrating devices, etc and labour required for successful performance of these trials. If it
is anticipated that the above test may prolong for a long time, the Contractor’s workmen
required for the above test shall always be present at Site during such trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly
received, unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s
information only. The Contractor shall submit to the Engineer every week a report detailing
all the receipts during the week. However, the Contractor shall be solely responsible for any
Seal & Signature of Bidder
shortages or damages in transit, handling and / or in storage and erection of the equipment
at Site. Any demurrage, wharf age and other such charges claimed by the transporters,
railways etc, shall be to the account of the Contractor.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all
equipment materials received by him for the purpose of erection and keep such record open
for the inspection of the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment
stored shall be properly protected to prevent damage either to the equipment or to the floor
where they are stored. The equipment from the store shall be moved to the actual location
at the appropriate time so as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried
by heating before they are installed and energized. Motor bearings, slip ring, commutators
and other exposed parts shall be protected against moisture ingress and corrosion during
storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance atleast once in three months from the date of receipt till the date of
commissioning and a record of such measured insulation values maintained by the
Contractor. Such records shall be opened for inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly
protected and stored in a suitable manner to prevent damage or deterioration in quality by
19.8 All the materials stored in the open or dusty location must be covered with suitable
weatherproof and flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked
for him, the Engineer will have the right to get it moved to the area earmarked for the
Contractor at the Contractor’s cost.
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all
equipment, which require indoor storage. Normally, all the electrical equipment such as
motors, control gears, generators, exciters and consumables like electrodes, lubricants etc.
shall be stored in the closed storage space. The Engineer, in addition, may direct the
Contractor to move certain other materials, which in his opinion will require indoor storage,
to indoor storage areas, which the Contractor shall strictly comply with.
20.0 CONSTRUCTION MANAGEMENT
20.1 The field activities of the Contractors working at Site will be coordinated by the Engineer
and the Engineer’s decision shall be final in resolving any disputes or conflicts between the
Contractor and other Contractors and the tradesmen of the Owner regarding scheduling
and coordination of work. Such decision by the Engineer shall not be a cause for extra
compensation or extension of time for the Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to
be designated by the Engineer. The Contractor shall attend such meetings and take notes
of discussions during the meeting and the decision of the Engineer and shall strictly adhere
to those decisions in performing his works. In addition to the above weekly meeting, the
Engineer may call for other meetings either with individual Contractors or with selected
number of Contractors and in such a case the Contractors if called, will also attend such
Seal & Signature of Bidder
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance
of his works in accordance with the specified construction schedule. If at any time, the
Contractor is falling behind the schedule, he shall take necessary action to make good for
such delays by increasing his work force or by working overtime or otherwise accelerate
the progress of the work to comply with the schedule and shall communicate such actions
in writing to the Engineer, satisfying that his action will compensate for the delay. The
Contractor shall not be allowed any extra compensation for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional labour and/or
materials or supply or any other services to the Contractor except for the coordination work
between various Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other
Contract Documents and any other supplementary data complete with all the latest
revisions thereto. The Contractor shall also maintain in addition the continuous record of
all changes to the above Contract Documents, drawings, specifications, and supplementary
data, etc. effected at the field and on completion of his total assignment under the Contract
shall incorporate all such changes on the drawings and other Engineering data to indicate
as installed conditions of the equipment furnished and erected under the Contract. Such
drawings and Engineering data shall be submitted to the Engineer in required number of
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including
construction equipment, tools and tackles for the purpose of the works under intimation to
the Engineer. All such goods shall, from the time of their being brought vest in the Owner,
but may be used for the purpose of the works only and shall not on any account be removed
or taken away by the Contractor without the written permission of the Engineer. The
Contractor shall nevertheless be solely liable and responsible for any loss or destruction
thereof and damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be
due or owing to him by the Contractor, under, in respect of or by reasons of the Contract.
After giving a fifteen (15) days notice in writing of his intention to do so, the Owner shall be
at liberty to sell and dispose off any such goods, in such manner as he shall think fit and to
apply the proceeds in or towards the satisfaction of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the
direction of the Engineer the materials such as construction equipment, erection tools and
tackles, scaffolding etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He shall
also be responsible for protection of all persons including members of public and employees
of the Owner and the employees of other Contractors and Sub-Contractors and all public
and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms
and Conditions of Contract, the following provisions will also apply to the portion of works
to be done beyond the Contractor’s own or his Sub-Contractor’s manufacturing Works.
Seal & Signature of Bidder
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the
Workmen’s Compensation Act, 1948 (Government of India). This policy shall also cover the
Contractor against claims for injury, disability, disease or death of his or his Sub-
Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s- As per statutory
Compensation Provisions
Employee’s liability As per statutory Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries,
disabilities, disease or death of members of public or damage to property of others, due to
any act of omission on the part of the Contractor, his agents, his employees, his
representatives and Sub-Contractors or from riots, strikes and civil commotion.
24.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his
Sub-Contractors, his agents and his employees have to perform work pursuant to the
24.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent
both in time and amount to take care of all his liabilities either direct or indirect, in pursuance
of the Contract.
25.0 UNFAVOURABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be
performed without subjecting the equipment and materials to adverse effects during
inclement weather conditions, like monsoon, storms etc. and during other unfavorable
construction conditions. No field activities shall be performed by the Contractor under
conditions, which might adversely affect the quality and efficiency thereof, unless special
precautions or measures are taken by the Contractor in a proper and satisfactory manner
in the performance of such Works and with the concurrence of the Engineer. Such
unfavorable construction conditions will in no way relieve the Contractor of his responsibility
to perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which
he may come across during the course of performance of his Works either during
excavation or elsewhere, are properly protected and handed over to the Engineer. Similarly
the Contractor shall ensure that the bench marks, reference points, etc, which are marked
either with the help of Engineer or by the Engineer shall not be disturbed in any way during
the performance of his Works. If any work is to be performed which disturbs such reference
the same shall be done only after these are transferred to other suitable locations under the
direction of the Engineer. The Contractor shall provide all necessary materials and
assistance for such relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and
equipment belonging to him or to GETCO or to others, working at the Site. The Contractor
Seal & Signature of Bidder
shall also be responsible for provision of all safety notices and safety equipment required
both by the relevant legislations and the Engineer, as he may deem necessary.
27.4 All equipment used in construction and erection by Contractor shall meet
Indian/International Standards and where such standards do not exist, the Contractor shall
ensure these to be absolutely safe. All equipment shall be strictly operated and maintained
by the Contractor in accordance with manufacturer’s Operation Manual and safety
instructions and as per Guidelines/rules of GETCO in this regard.
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be
carried-out in accordance with the relevant provisions of Factories Act 1948, Indian
Electricity Act 1910 and associated Laws/Rules in force from time to time. A register of
such examinations and tests shall be properly maintained by the Contractor and will be
promptly produced as and when desired by the Engineer or by the person authorised by
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the
Site including safe means of access, railings, stairs, ladders, scaffoldings etc. The
scaffoldings shall be erected under the control and supervision of an experienced and
competent person. For erection, good and standard quality of material only shall be used
by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical
equipment belonging to the Owner or other Contractors under any circumstances,
whatsoever, unless expressly permitted in writing by GETCO to handle such fuses, wiring
or electrical equipment
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to
the other Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the
c. Obtain permission of the Engineer detailing the sockets to which the appliances may
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of
which shall be an earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission.
No weight of any description will be imposed on any cable and no ladder or similar
equipment will rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared
safe by the Engineer and a permit to work shall be issued by the Engineer before any repair
work is carried out by the Contractor. While working on electric lines/equipment, whether
live or dead, suitable type and sufficient quantity of tools will have to he provided by the
Contractor to electricians/workmen/officers.
27.14 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his
Seal & Signature of Bidder
employees due to any reason, whatsoever, it shall be the responsibility of the Contractor to
promptly inform the same to the Engineer in prescribed form and also to all the authorities
envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the
work is being carried out in such a way that it may cause accidents and endanger the safety
of the persons and/or property, and/or equipment. In such cases, the Contractor shall be
informed in writing about the nature of hazards and possible injury/accident and he shall
comply to remove shortcomings promptly. The Contractor after stopping the specific work
can, if felt necessary, appeal against the order of stoppage of work to the Engineer within
3 days of such stoppage of work and decision of the Engineer in this respect shall be
conclusive and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work
due to safety reasons and the period of such stoppage of work will not be taken as an
extension of time for completion of work and will not be the ground for waiver of levy of
liquidated damages.
27.17 It is mandatory for the Contractor to observe during the execution of the works,
requirements of Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted
around fire prone areas and adequate fire fighting equipment shall be provided at crucial
d) There shall be a suitable arrangement at every work site for rendering prompt and
sufficient first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers,
use of gum boots for working in slushy or in inundated conditions are essential
requirements to be fulfilled.
27.18 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions
of applicable laws pertaining to the safety of workmen, employees, plant and equipment as
may be prescribed from time to time without any demur, protest or contest or reservations.
In case of any discrepancy between statutory requirement and GETCO Safety Rules
referred above, the latter shall be binding on the Contractor unless the statutory provisions
are more stringent.
a. Fatal injury or accident-Rs. 1, 00,000/- :
These are causing death per person applicable for death/
b. Major injuries or accident causing Rs. 20,000/- injury to
25% or more permanent disablement per person : any person,
to Workmen or employees : whosoever.
Permanent disablement shall have same meaning as indicated in Workmen’s
Compensation Act. The compensation mentioned above shall be in addition to the
compensation payable to the workmen/employees under the relevant provisions of the
Workmen’s Compensation Act and rules framed there under or any other applicable laws
as applicable from time to time. In case the Owner is made to pay such compensation then
the Contractor is liable to reimburse the Owner such amount in addition to the compensation
indicated above.
Seal & Signature of Bidder
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the
equipment shall be in accordance with the relevant Codes and accepted good engineering
practice, the Engineer’s drawings and other applicable Indian recognized codes and laws
and regulation of the Government of India.
Seal & Signature of Bidder
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions
particular to the Contract. The provisions herein are to be read and understood in
conjunction with the relevant provisions elsewhere in the General Conditions of Contract
(GCC) and Erection Conditions of Contract (ECC). The intent of provisions herein are
specific to this contract and are, in general, supplementary to related provisions under GCC
and ECC. However, in certain provisions which are contrary to those in GCC and ECC, the
provisions in these Special Conditions of Contract will prevail.
The tender fee plus GST as applicable specified in notice inviting tender is payable by
Demand Draft (DD) at Vadodara drawn on any Scheduled Bank in favour of Gujarat Energy
Transmission Corporation Ltd. The same will be furnished in Cover-1 of Bid along with EMD
(Bid Security).
3.0 Earnest Money Deposit (EMD):(Ref.Cl.12.1 of GCC)
The EMD is payable as under:
50 % of EMD by DD in favour of Gujarat Energy Transmission Corporation Ltd. on any
Scheduled Bank in Vadodara. Balance 50 % by Bank Guarantee (valid till 6(Six) months
from the date of submission of the tender) from any Nationalized Bank in the format
provided herein. However, 100% EMD submitted by DD is acceptable.
Payment by Cheque/Co.op Bank Guarantee/ Company Guarantee is not permissible.
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the
same will make the Bid invalid.
5.0 QUALIFYING REQUIREMENT
3. Valid Electrical Contract License
4. Registered under GST
5. PF Registration Certificate.
6. The bidder should not have been referred to NCLT under Insolvency &
Bankruptcy Code (IRP has been appointed or Liquidation proceedings have
been initiated under IBC).Undertaking to be submitted as per GETCO’s
prescribed Format.
Note: Sr.No. 1 & 2 are mandatory documents.
Sr.No. 3 to 6 are Non-mandatory documents but required to submit by the
1.Technical Requirement:
1.1. Bidder shall have executed minimum 2 Nos. of EPC contracts of 132kV or higher voltage
class substation at two different locations within last Seven years with State or Central
Transmission Utility or major industries. 132kV or higher voltage class Substations include
minimum three nos. Bays (minimum one feeder bays, & minimum one Transformer bay) At
Seal & Signature of Bidder
least one Sub-Station out of above commissioned as above shall be performing satisfactorily
for at least one year.
Bidder shall have executed minimum 2 Nos. of EPC contracts of 66kV or higher voltage class
substation at two different locations within last Seven years with State or Central Transmission
Utility or major industries. 66kV or higher voltage class Substations include minimum three
nos. Bays (minimum one feeder bays, & minimum one Transformer bay). At least Two Sub-
Station out of above commissioned as above shall be performing satisfactorily for at least one
Bidder quoting in this category has to furnish certificate regarding satisfactory operation of
Nos. substation for at least one year. (EPC Contract include minimum 03 nos. of bays
consisting minimum 01 no. feeder bay and 01 no. Transformer Bay.)
Sub-Contractors’ experience may be considered if it is officially recognized by Order
Placing authority of the State Power Utility/ Government organizations / PSU only
The bidder should invariably furnish the Performance certificates in support of their
Qualifying requirements and the Performance certificates shall be issued by an officer
not below the rank of Superintending Engineer or equivalent cadre of State power utility
/ Government organizations / PSU / Major Industry only otherwise the bid will become
2.FINANCIAL CRITERIA:
2.1a Bidder’s Minimum Average Annual Turnover(MAAT) for best three years out of last five
financial years as shall not be less than the 50% of estimated amount of this tendered.
Note: - For the purpose of arriving at MAAT, Revenue from operation shall be considered
only excluding non-recurring income / other income / interest income etc
2.1.b Last Financial Year Liquid Assets should not be less than 20% of estimated amount of
Note: - For the purpose of arriving at LA, Current Assets Less Inventories shall be considered.
2.1 c Bidder’s Net worth for last financial year should be positive.
Note:- Net worth means paid up share capital, Share Application Money pending allotment*
and reserves# less accumulated losses and deferred expenditure to the extent not written
# Reserves to be considered for the purpose of net worth shall be all reserves created out of
the profits and securities premium account but shall not include reserves created out of
revaluation of assets, write back of depreciation and amalgamation
* Share Application Money pending allotment will be considered only in respect of share to
Bidder to evidence the meeting of financial criteria shall submit:
( i) CA Certificate with valid UDIN Number failing which certificate shall not be considered for
the purpose of evaluation and
( ii) Audited Balance Sheet and Profit & Loss account along with the schedules referred therein
and the Auditor’s Report for the preceding five financial years, in line with one of the following
Seal & Signature of Bidder
III ) In case last financial year’s closing date was within 6 months prior to bid due date and
audited Balance Sheet and Profit & Loss account of last financial year are not available, bidder
has the option to submit the financial details of five previous years immediately prior to the last
financial year. For example, in case bid due date is up to 30th September and financial details
of immediate preceding financial years (year ending 31st March of same year) are not
available, the financial details of the five previous years immediately prior to the last financial
year may be submitted.
b ) Otherwise it is compulsory to submit the financial details of immediate preceding five
financial years.
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC,
the following documents/details are to be furnished by the Bidder:
1. GST Registration No. date/ issuing authority.
2. Regn. No. under Shops & Estt. Act/ issuing authority
3. Details of Partners/Directors of the Firm/Company.
4. Experience Record and details of orders pending / executed for various utilities
5. Last five years Audited Accounts
6. Detail of Manufacturing /Fabrication facilities if applicable
7. Factory Registration/license details if applicable
7.0 COMPLETION PERIOD
7.1 Overall Completion periods for this Contract shall be 15(Fifteen) Months from the date of
7.2 No mobilization period, idling or stoppage period will be allowed during this period of the
7.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the GETCO/Engineer and is complete in
all respects as per the terms and conditions of this Contract.
8.0 Instructions before submitting your bid.
The Bid evaluation shall be carried out on total end cost.
1. All the drawings, i.e. elevation, side view, plan, cross sectional view etc., in AutoCAD DXF
format and manuals in PDF format, for offered item shall be submitted by successful
bidder. Also the hard copies as per specification shall be submitted.
2. The bidder shall submit Quality Assurance Plan (QAP) & Field Quality Plan (FQP) with the
3. The bidder must fill up all the point of GTP for offered item/s. Instead of indicating refer
drawing, or as per IS/IEC”, the exact value/s must be filled in.
4. All the points other than GTP, which are asked to confirm in technical specifications must
be submitted separately with the bid.
5. Please note that the evaluation will be carried out on the strength of content of bid only.
No further correspondence will be made.
6. The bidder shall bring out all the technical deviation/s only at the specified annexure.
7. Design and engineering of SLD (Single line Diagram), layout drawing, sectional view, BOQ,
DSLP, Earth mat design, lighting & Illumination calculation of switchyard and all drawings
shall be carried out by successful bidder.
8. Preparing of Erection Key Diagram (EKD) indicating all the quantity required for successful
erections, testing and commissioning of substation & shall be submitted for approval. All
equipments, material shall be supplied as per approved EKD (Drawing/BOQ).
9. Bar chart with completion period in MS Project shall be submitted.
Seal & Signature of Bidder
10. After the commissioning of S/S, contractor shall arrange thermoscaning of entire
switchyard & submit detailed reports. However this will not be contractual hold point.
GETCO reserves the right to ask the contractor to conduct the same on entire S/S under
full load condition.
11. Following conditions shall be applicable for Annexure-B Items:
1) ‘PROPERTY OF GETCO’ must be embossed on each kit.
2) Guarantee/Warrantee of all kits shall be 3 years after successful commissioning at
GETCO substation.
9.0 Addendum to the technical specifications.
The addition /alternations mentioned here under will supersede the related clauses of respective
technical specifications, if differs with original clause.
All the hardwares, conductor accessories, clamps and connector used in switchyard
erections shall have corona free performance and related type tests as per standards shall
have to be submitted.
1. The complete design, detailed engineering are to be done by the successful bidder.
2. Design calculations for SC forces , thermal capability of bus and each equipment
component of GIS , vibration, DSLP , Earth Mat , Illuminations , structures and other
calculations required for GIS are to be submitted by successful bidder.
3. All the drawings are to be submitted by the successful bidder and got approved from
GETCO before execution.
4. Detailed Engineering BOQ to be submitted by the successful bidder and got approved
after due scrutiny considering actual requirement, standard clearances (CLD) etc.
10. Special Notes: (Not Applicable)
The procedure to be followed for elimination of Bidders for Interse Revised Bidding shall be as
Sr. No. No. of Particulars
1 1 No scope of bidding. Re-invite tender
2 2 Scope of Interse Revised Bidding. No elimination.
3 3 or 4 Scope of elimination:
(A) Within 10% of L-1 bidder price - No elimination.
(B) Above 10% of L-1 Bidder price - Eliminate H1
4 5 or more Scope of elimination:
bidders (A) Within 10% of L-1 bidder price - No elimination.
(B) Above 10% of L-1 Bidder price - H1 and H2 to be
Successful bidder has to arrange for training at their expense at GETCO premises covering
erection, O&M, testing & commissioning aspect of transformer C.B, C/R panels, one day for each
equipment. This training program is to be organized prior to erection of these equipments.
Complete training materials in soft & hard copy shall be given to participants.
12.Progress Report (Refer Cl. No. 9.00 of ECC)
The successful bidder shall submit progress report monthly for supply activities &
fortnightly for erection activities along with site photographs.
13. Bidder’s Responsibility
Seal & Signature of Bidder
As it is not possible to specify / indicate the detailed requirement of whole substation it
is a responsibility of the bidder for the complete design, manufacturing, supply at site,
storage, preservation, erection, testing and commissioning of the substation as per the
technical specifications.
14. Payment (refer GCC Cl. No 47.0)
1) Successful bidder must submit “No Claim certificate “along with final bill.
2) Tender specification gives only BOQ asking for unit rate & accordingly bidder
shall quote the prices against each unit and payment will be made accordingly.
Price break up if any for supply items will be considered for billing purpose & not for actual
15. Clarification
Clarification on the tender document if any shall reached to ACE (P&C) on or Before 10 days
of due date. Clarification received there after will not be considered & out Rightly ignored.
16. Bonus: (Not Applicable)
17. Rain period:
No further extension will be given against rain period and this rain period shall be considered as
working period. While quoting the bid, Bidder have to consider this period.
18. Commercial :
1) All the Annexure, forms ,certificate are the standard documents of tender however, only related
document based on the qualifying requirement are applicable.
2) The Bid evaluation shall be carried out on final end cost only.
3) Welfare Cess will be applicable on Supply, Erection and Civil Portion. Welfare Cess shall be
paid by concerned bidder only.
4) The following is the method of award of contract:
_ LOI shall be issue to bidder having lowest end cost.
_ Bidder have to accept the LOI within 5 days.
_ GETCO shall issue LOA (Letter of Award) mentioning the end cost of package covering break
up of Supply and Erection part and acceptance to be given by bidder within 5 days.
_ Bidder have to pay Security Deposit as per Tender terms and condition within 15 days.
_ A/T shall be issued from above.
_ Commencement period shall be from LOA date and same shall be consider for schedule
19) SECURITY DEPOSIT-CUM-PERFORMANCE GUARANTEE DEPOSIT
19.1 The successful bidder has pay security deposit-cum-performance deposit within 15 days of
receipt of LOA i.e. Letter of Award.
19.2 The successful bidder will be required to pay an amount equivalent to 10 % of the value of
the order (END cost) as a Security Deposit for satisfactory execution of the contract and as
performance guarantee. Such Security Deposit will be payable either in DD payable at
Vadodara / Bank guarantees from Scheduled / Nationalized Banks will be acceptable, if the
amount of security deposit payable exceeds 50,000/- Bank Guarantees will be furnished.
The Bank Guarantees furnished should have clear one time validity till the
completion of the order in all respect and up to the expiry of the Guarantee period of
25 Months (2 years +1 month) from the date of Commissioning of Substation. Bank
Guarantee for interim period will not be allowed. If by any reason the contract period is
extended, then contractor should undertake to renew the Bank Guarantee at least one
Seal & Signature of Bidder
month before the expiry of the validity failing which Board will be at liberty to redeem the
same, without entering into further correspondence in the matter.
19.3 No interest will be allowed on amount of Security deposit.
19.4 The Security Deposit-cum-performance Guarantee deposit as above on total shall be
kept deposited up to 2 years + 1 month from the date of charging of line/Feeder
19.5 This security deposit is for the performance of contract and the same is liable to be forfeited
by the GETCO in event of non fulfillment of the term and conditions of this contract by the
19.6 Corporate Guarantees are not admissible.
19.7 The ‘Signing of Contract‘ and ‘Contract Agreements’ will be done as per prevalent GETCO
Terms and Conditions on the basis of LOA.
20. All the equipments/ hard-wares proposed to be supplied shall have valid type test
certificates from any accredited NABL laboratory as per respective technical specification .
21. Items/materials proposed to be supplied by bidder of similar or higher rating shall be in
service for a period of minimum 3 years. (Supporting documents/certificates of original
customer to be submitted.
Seal & Signature of Bidder
ON LETTER HEAD OF SUPPLIER / CONTRACTOR
Additional Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Co. Ltd.,
Corporate office,
I, _______________________________(Name of the authorized signatory) having age ___,
Designation ____________ M/s __________________________(Name of the seller with
address ) having PAN (10 digits) do hereby declare that GETCO has awarded the order of
(Description of Supply order / EPC order) having (Order no and date) and we hereby
undertake that we, M/s ___________________________ have
1. The sales / gross receipts / turnover of more than Rs. 10 Crores in immediately
preceding financial year and,
2. Total receipts from GETCO for consideration for sale of goods as per the contracts
awarded is likely to exceed Rs 50.00 lacks during the FY _________.
And hence, we are liable to charge and collect TCS @ 0.075% / 0.1% (Strike out whichever
is not applicable) from GETCO during FY ________. We also undertake that the TCS
collected from GETCO shall be paid to Government Treasury within the prescribed time limit
and necessary TCS returns in prescribed format will be filled by us.
We further undertake that TCS certificate in form 27 D will be submitted to GETCO within
days from the end of respective Quarter. In case, if we fail to pay TCS to Government
Treasury within prescribed time limit or fail to filed TCS returns in prescribed time limit or fail
to submit the TCS certificate within 30 days from the end of quarters, GETCO is entitled to
recover the amount of TCS so collected from this contract or any other contract or from any
other amount payable to us.
(Name of Authorized Signatory)
Seal & Signature of Bidder
To be submitted with Q.R BID
Tender No: ACE(P&C)/Contract/TRB/220/132KV/AsojS/S /E-498
Tender for Design, engineering, manufacturing, supply, erection, testing & commissioning of
01Nos. of 220/132kV 150MVA Transformer No-5 Bay at 400kV Asoj ss under Jambuva circle on
EPC basis excluding Civil works.In connection with above subject, I / we confirm the following:
In connection with above subject, I / we confirm the following:
a) I/ We, the undersigned, have read and understand the Tender Specification No.
ACE(P&C)/Contract/TRB/220/132KV/Asoj S/S /E-498
b) The supply and erection price components in the bid are firm prices in line with Tender
Specifications and shall stand valid till completion of the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation.
Further, I / we also agree that additional conditions / deviations, if any found in bid, the offer shall
be out rightly rejected without assigning any reason thereof.
Signature of Authorized representative
of Company / Agency
Seal & Signature of Bidder
To be submitted with Q.R BID ( On letter head with following declaration)
Declaration regarding “ Relationship with Employee”
Relationship with Employee :
Every bidder should, at the time of submission of bid, give a declaration as under.
“ If in any Bidder Company/firm, the interest (i.e. Shareholding in company and
share inpartnership firm) of any employee of the tendering Company or his/her
relative as defined in Section 2(77) of the Company’s Act 2013 is 10% or more,
the tendering company will not deal with such company/firm at all. Tenderer
therefore, must specifically disclose this fact in his technical Bid. Non-disclosure
of such facts would immediately disqualify the tenderer for further dealing with
the tendering company”
Signature of Signature of Authorized
representative of Company / Agency
Seal & Signature of Bidder
To be submitted with Q.R BID ( On letter head with following declaration)
Declaration regarding “Conflict of Interest amount Bidders/Agents”
A bidder shall not have conflict of interest with other bidders. Such conflict of interest can lead to anti-competitive
practices to the detriment of Procuring Entity’s interests. The bidder found to have a conflict of interest shall be
disqualified. A bidder may be considered to have a conflict ofinterest with one or more parties in this bidding
process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any of them; or
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts them in a position
to have access to information about or influence on the bid of another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a bidderin more than one Bid
will result in the disqualification of all bids in which the parties are involved. However, this does not limit the
inclusion of the components/ sub-assembly/ assemblies from one bidding manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal manufacturers, one agent
cannot represent two manufacturers or quote on their behalf in a particular tender enquiry. One manufacturer
can also authorise only one agent/ dealer. There can be only one bid from the following:
1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or technical
specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units,or more than one unit
having common business ownership/ management, only one unit should quote. Similar restrictions would
apply to closely related sister companies. Bidders must proactively declare such sister/ common business/
management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as amended from time to
Every bidder should, at the time of submission of bid, give a declaration, that bidder shallnot have conflict
of interest with other bidders for particular quoted item, as above.
Signature of Authorized
representativeof
Company / Agency
Seal & Signature of Bidder
Please submit along with Technical Bid
CERTIFICATE OF TECHNICAL COMPLIANCE
We, M/s. _______________________ hereby certify that there is no deviation to the Technical
specifications and amendments, if any, against this tender.
We further confirm to submit Guaranteed Technical Particulars, valid type test reports,
drawings, calculations, etc., as per requirements of BOQ, Technical Specifications and
relevant IS/IEC; for offered items/equipments/materials, in the event of an order on us, within
commencement period without affecting delivery schedule and without any price
implication to GETCO.
We confirm to provide valid authorization and service back up guarantee from OEM for all
offered items/equipments/materials, in the event of an order.
NAME & SIGNATURE OF AUTHORISED PERSON
COMPANY’S ROUND SEAL
Seal & Signature of Bidder
(To be submitted With QR BID)
Vendor must fill up below details & should place at the top of the Technical Bid.
[IN PERCENTAGE]
Please quote your
a. GST registration no & date
d. PAN No. & Date :
e. PF Registration No. :
3. PENALTY TERMS AGREE :
(Please specify YES / No.)
4. SECURITY TERMS AGREE :
(Please specify YES / No.)
5. P.B.G. TERMS AGREED (Wherever applicable) :
(P.B.G. – Performance Bank Guarantee)
6. PAYMENT TERMS AGREE :
(Please specify YES / No.)
7. work involved :
8. TELEPHONE NOS.& FAX NO. :
9. AUTHORISED PERSON OF THE FIRM :
10. NAME OF THE PROPRIETOR, :
PARTNERS, DIRECTORS
[AS THE CASE MAY BE],
ALONG WITH ADDRESS, TELEPHONE,
11. If Vendor Registration is Done :
(Please Furnish the details of Vendor
Registration No. )
Signature of Authorized representative
of Company / Agency
Seal & Signature of Bidder
CONTRACT AGREEMENT
(Non judicial stamp paper of Rs. 300/- )
This agreement is made at Vadodara, the _________________day of __________in the Christian
year Two Thousand Five between
as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to context
include its successors or permitted assigns) of the one part and the Gujarat Energy Transmission
Corporation Limited, having their Corporate Office at Race Course, Vadodara, (hereinafter called
“Corporation” which expression shall unless excluded by or repugnant to the context include its
successors or assigns) of the other part.
“WHEREAS” the aforesaid Corporation has accepted the tender of the aforesaid contractors for
_____________________________________________ as per Corporation’s Order No.
____________________________________ hereinafter called “The works” and more particularly
described enumerated or referred to in the specification, terms and conditions prescribed in the
order letter, covering letter arid other letters and schedule of price which for the purpose of
identification have been signed by Shri __________________________________________ on
behalf of the Contractors and by __________________________________________on behalf of
the Corporation, a list where of is made out in the schedule hereunder written and all of which said
documents are deemed to form part of this contract and included in the expression ‘The Works”
wherever herein used, upon the terms and subject to the conditions hereinafter mentioned.AND
WHEREAS THE GETCO has accepted the tender of the contractor for the work of Design,
engineering, manufacturing, supply, erection, testing & commissioning of 01Nos. of 220/132kV
150MVA Transformer No-5 Bay at 400kV Asoj ss under Jambuva circle on EPC basis excluding
Civil works of Gujarat State for the sum of
Rs._______________(Rupees_______________________________) upon the terms and
subject to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED THAT
1. The contractors shall do and perform all works and things in this contract mentioned and
described or which are implied therein or there from respectively or are reasonably necessary for
the completion of the works as mentioned and at the times, in the manner and subject to the
terms conditions and stipulations contained in this contract, and in consideration of the due
provision, executions, construction and completion of the works agreed to by the contractors as
aforesaid, the Corporation doth hereby covenant with the contractor to pay all the sums of money
as and when they become due and payable to the contractors under the provisions of the
contract. Such payment to be made at such times and in such manner as is provided by the
2. The conditions and covenants stipulated hereinbefore in this contract, are subject to and
without prejudice to the rights of the Corporation to enforce penalty for delays and / or any other
rights whatsoever including the right to reject and cancel on default or breach by the contractors
of the conditions and the covenants as stipulated in the general conditions, specifications, forms,
or tender schedule, drawing, etc. attached with Corporation’s Order
The contract value, extent of works / supply, completion / delivery dates, specifications and other
relevant matters may be altered by mutual agreement and if so altered shall not be deemed or
construed to mean or apply to affect or alter other terms and conditions of the contract and the
general conditions and the contract so altered or reverse shall be and shall always be deemed to
have been subject to and without prejudice to said stipulation.
Seal & Signature of Bidder
List of documents forming part of the contract:
1) Corporation’s Tender Specification No-.
Tender Notice No . ACE(P&C)/Contract/TRB/220/132KV/Asoj S/S /E-498
2) Corporation’s Contract booklet – “Tender & Contract of Works”.
3) Corporation’s A/T No
4) A/T Acceptance letter no.
5) Memorandum & Article of Association.
6) Board Resolution authorizing person to sign on behalf of firm.
In witness whereof the parties hereto have set their hands and seals this day and month year first
Signed, Sealed and Delivered by
In the presence of, signature with names and
Signed, Sealed and Delivered by
for and on behalf of Gujarat Energy Transmission Corporation Limited,
Sardar Patel Vidyut Bhavan,
Race Course, Vadodara -390
In the presence of, signature with names and
Seal & Signature of Bidder
BANK GUARANTEE FOR E. M. D. --- Please refer attachment for EMD (attached
NAME OF DISIGNATED BANKS:
Bank Guarantees to be submitted against SD / EMD as per Cl. No. 12 of GCC & against
Performance Guarantee as per Cl. No. 8 of SCC & wherever applicable shall be
furnished by following banks:
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent
All Nationalized Banks.
Guarantees issued by following Banks will be accepted as SD / EMD for the period up to
31-03-2027. The validity cut-off date in GR is with respect to date of issue of Bank
Guarantee irrespective of date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagarik Sahkari Bank Ltd
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
Seal & Signature of Bidder
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
38. The Baroda Central Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-Operative Bank
42. The Banaskantha Mercanttile Co-Operative Bank
43. Gujarat Gramin Bank
Bank Guarantee of other than above mentioned banks towards EMD, SD Cum
Performance Bank Guarantee for Supply & Warranty will not be acceptable.
Seal & Signature of Bidder
NON JUDICIAL STAMP PAPER OF RS. 300/- (Stamp Paper Validity Six months)
[For Execution of Contract and Performance Guarantee (PG) for Warranty period
---- Please refer attachment attached separately )
NAME OF DESIGNATED BANKS:
NAME OF DISIGNATED BANKS:
Bank Guarantees to be submitted against SD / EMD as per Cl. No. 12 of GCC & against
Performance Guarantee as per Cl. No. 8 of SCC & wherever applicable shall be
furnished by following banks:
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent
All Nationalized Banks.
Guarantees issued by following Banks will be accepted as SD / EMD for the period up to
31-03-2027. The validity cut-off date in GR is with respect to date of issue of Bank
Guarantee irrespective of date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagarik Sahkari Bank Ltd
Seal & Signature of Bidder
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
38. The Baroda Central Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-Operative Bank
42. The Banaskantha Mercanttile Co-Operative Bank
43. Gujarat Gramin Bank
Bank Guarantee of other than above mentioned banks towards EMD, SD Cum
Performance Bank Guarantee for Supply & Warranty will not be acceptable.
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK
1. A/T no. and date to be written on every page, of Bank Guarantee & its Extension.
2. If B/G amount is more than Rs.50, 000/- , kindly take sign of two bank officer
with their respective Employee code no.
3. Valid Confirmation letter of the concerned Bank in an approved format should be
attached with every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should
not be beyond six months, in any case.
5. Round seal and signature of two Bank officers should be affixed on every B/G paper.
Seal & Signature of Bidder
ON STAMP PAPER OF 300/-
FORM OF BANKER’S UNDERTAKING
[For Performance Guarantee (PG) for Warrantee Period
As per Commercial Terms and Conditions of Tender ]
Bank Guarantee No._______________ Issued on dated:______________
We Bank of _______________________________________ (Name & Address of issuing
Bank) hereby agree unequivocally and unconditionally to pay immediately on demand in
writing from the Gujarat Energy Transmission Corporation Ltd. or any Officer
authorized by it in this behalf any amount up to and not exceeding
to the said Gujarat Energy Transmission Corporation Ltd. on Behalf of
who have entered into a contract for the supply/works specified below -
This agreement shall be valid and binding on this Bank up to and inclusive of
__________and shall not be terminable by notice or by change in the constitution of the
Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our
liability hereunder shall not be impaired or discharged by any extension of time or variations
or alterations made, given conceded or agreed, with or without our knowledge or consent,
by or between parties to the said within written contract.
“NOTWITHSTANDING anything contrary contained in any law for the time being in force
or banking practice, this Guarantee shall not be assignable, transferable by the beneficiary
(i.e. GETCO). Notice or invocation by any person such as assignee, transferee or agent of
beneficiary shall not be entertained by the Bank. Any invocation of the Guarantee can be
made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee
is restricted to __________(Rupees_____________________________
____________Only). Our of guarantee shall remain in force until
__________________(Date of validity of the Guarantee). Unless demands or claims under
this Bank Guarantee are made to us in writing on or before________ (Date of validity of
the Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and
we shall be released and discharged all liabilities there under:
Please mention here complete Postal Signature of the Bank’s
Address of the Bank with Branch code, Authorized Signatory with
Telephone and Fax Nos. Official Round Seal
Seal & Signature of Bidder
NAME OF DESIGNATED BANKS:
Bank Guarantees to be submitted against SD / EMD as per Cl. No. 12 of GCC & against
Performance Guarantee as per Cl. No. 8 of SCC & wherever applicable shall be
furnished by following banks:
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent
All Nationalized Banks.
Guarantees issued by following Banks will be accepted as SD / EMD for the period up to
31-03-2027. The validity cut-off date in GR is with respect to date of issue of Bank
Guarantee irrespective of date of termination of Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagarik Sahkari Bank Ltd
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
Seal & Signature of Bidder
38. The Baroda Central Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-Operative Bank
42. The Banaskantha Mercanttile Co-Operative Bank
43. Gujarat Gramin Bank
Bank Guarantee of other than above mentioned banks towards EMD, SD Cum
Performance Bank Guarantee for Supply & Warranty will not be acceptable.
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK
1. A/T no. and date to be written on every page, of Bank Guarantee & its Extension.
2. If B/G amount is more than Rs.50, 000/- , kindly take sign of two bank officer
with their respective Employee code no.
3. Valid Confirmation letter of the concerned Bank in an approved format should be
attached with every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should
not be beyond six months, in any case.
5. Round seal and signature of two Bank officers should be affixed on every B/G paper.
Seal & Signature of Bidder
INDEMINITY BOND IN STAMP PAPER OF RS.300/-
KNOW ALL MEN BY THESE PRESENTS that we, Messers ___________________
Contractor” which expression shall, where the context so admits, include their heirs, executors,
administrators and legal representatives, successors and permitted assigns) are hereby held and
firmly bind unto the Gujarat Energy Transmission Corporation Ltd (hereinafter called “the GETCO”
which expression shall, where the context so admits, include its successors and assigns) to refund
the full amount of materials supplied by the GETCO under the terms and conditions of A/T No.
________________ against any loss damage or deterioration of whatsoever nature occurs to said
materials supplied by the GETCO and which are in the custody of the contractor at their works site,
on behalf of the GETCO, at ____________ (name of line) _______________ and / or if any of
the said materials, when inspected by any officer authorized by the GETCO in this behalf, is found
to be damaged, lost, deteriorated in quality or quantity, the contractor hereby agrees to bind himself
to indemnity and at all times keep indemnified the GETCO against all loss, damage and
deterioration to the any material supplied by the GETCO during his custody and to pay the full
amount forthwith to the GETCO and here by within 30 days the market value of such materials
which is lost, damaged or deteriorated in full to the GETCO and shall also hereby authorize the
GETCO to deduct the said sum from any sum due to the contractor or any sum which may at any
time become due to the contractor under the above referred contract or any other contract entered
into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and
protection and preservation of the said materials against all risks, excluding war risks and against
loss, damage and deterioration of whatsoever nature in respect of the said materials while it
remains in the custody and possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized
Now the conditions of the above written bond are such that the contractor shall pay the full amount
forthwith to the GETCO in the event of loss, damage or deterioration or whatsoever except due to
circumstances arising out of war in respect of the materials supplied by the GETCO and shall fully
and effectually indemnify and keep indemnified to the GETCO against such loss, damage and
deterioration in time.
The contractor shall keep the said materials open at all times for inspection by the officers
authorized by the GETCO and produce at anytime when demanded.
THE WITNESS WHERE OF : We the
(Signature of contractor)
hereto signed at ___________________
In the presence of
____________address ______________ (Signature)
_____________address ______________ (Signature)
Seal & Signature of Bidder
(To be submitted on firms letter-head)
Ref. No. Date :
The Additional Chief Engineer (Procurement & Contracts)
Gujarat Energy Transmission Corporation Ltd.
Sardar Patel Vidyut Bhavan
Sub: Design, engineering, manufacturing, supply, erection, testing & commissioning of
01Nos. of 220/132kV 150MVA Transformer No-5 Bay at 400kV Asoj ss under Jambuva
circle on EPC basis excluding Civil works.
Ref: LOI/LOA/AT No:
We hereby acknowledge, agree and accept your LOI/LOA/A /T under reference
above with terms and conditions mentioned therein.
(Authorized Signature)
Designation _________________
Seal & Signature of Bidder
SAFETY CUM INDEMNITY BOND
(On Non-Judicial Stamp paper of value not less than 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, _______ by this SAFETY CUM
INDEMNITY BOND Executed on this _____________ Day of _________ 2014. I/We Having
Registered Office _______________________________(herein after called “THE
CONTRACTOR” which expression shall mean and includes my /our heirs, executors,
administrators and legal representatives, successors and permitted assigns) do hereby
binds myself/oursees and also our company/firms after having the power to bind by this
promise and undertaking in favour of the Gujarat Energy Transmission Corporation
Limited (GETCO), Vadodara a State Transmission Utility under The Electricity Act,
having its registered office at Sardar Patel Vidyut Bhavan, Race course, Vadodara.(
hereinafter called as GETCO, which expression shall mean and include its legal
representative, administrators assigns) has agreed under the terms and conditions of the
contract no.______ dated_______made between __________ and ___________for the contract
of the ____________value of __________ interalia on production of Safety Cum Indemnity
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time
to time to the extent of ______ Rupees________only against any losses or damages, costs,
charges and expenses caused to or suffered by reason of the CONTRACTOR while Project,
R&M, O&M work including work carried out by outsourcing agency, failing to take proper
care or not complying the guidelines given hereunder as per Annexure-A and instructions
which may be given from time to time during the continuance of the contract and we
further undertake to unconditionally pay the amount claimed by the GETCO on demand
and without demur to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under
LOA no._____, dated ______ for _________ issued by the GETCO after having observing
necessary formalities, the details of which is described in the order no.______ dated ______
and whereas the said job/works will be /likely to be done in places covered under
Employees’ State Insurance Act,1948 (ESI) and /or the Workmen Compensation Act,1923
and /or other laws relating to the Labour Management and Welfare Act. (Respective
And whereas according to the condition of the Contract the CONTRACTOR is under
obligation to execute this Safety cum Indemnity Bond before the commencement of actual
execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow
the guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to
whether there has been any breach of the guidelines as per Annexure-A of this bond and
as to the extent of the loss, damages, costs, charges and expenses caused to or suffered
We the CONTRACTOR further agree that our liability under this bond shall not be
discharged because of the change in the constitution of the GETCO or for the extension
of the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the
GETCO from all claims, actions, proceedings and risk, damage danger to any person
whether belonging or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims,
compensation, damages any proceedings in respect of any of its employee / workmen
under the Workmen Compensation Act or any other laws for the time being in force.
Seal & Signature of Bidder
c. That, if during the course of execution of work as stated in the contract order mentioned
hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with
guidelines as per Annexure-A or terms and conditions / formalities within the meaning of
Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or any other
laws relating to the Labour Welfare for the time being in force, and also has not observed the
safety norms in accordance with the law prevailing at the place of work/job to the satisfaction
of the GETCO, the GETCO shall have the right to stop the execution of work/job and the period
of such stoppage shall not be taken into account for the calculation of the total period of
completion of work for which the CONTRACTOR is responsible to complete the work/job and
it will be deemed that discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay
any such compensation mentioned hereinabove, whether on failure of the CONTRACTOR or
for any other reason, the GETCO shall have the right to recover the said amount from any
amount receivable by GETCO or any bank guarantee deposited or anything payable whether
in connection with this contract or other contract by the CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation
of any guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum
Indemnity Bond, GETCO shall have right to terminate the contract of work issued to the
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in
addition to the compensation and liability as per statutory requirement, contractor / agency
is hereby agreed to pay the penalty amount as given below:
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac 5000/-+ GST
2 Above1 Lac to 10 Lacs 40000/- + GST
4 > 100 Lacs 0 % of contract value +GST
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement
of claims under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work
is performed or as per GETCO norms shall have the jurisdiction to decide the rights & liabilities
of the parties while adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h.This Safety cum Indemnity Bond shall continue and hold good until it is released by the
GETCO in Writing on the CONTRACTOR’s application after the Contractor has discharged all
his obligations under the order mentioned hereinabove and submitted a “NO DEMAND
CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity Bond shall
be valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are
in addition to And not by way of limitation or substitution for any other guarantee, indemnities
Hereto before given to the GETCO by the CONTRACTOR and this indemnity does not Revoke
or limit such indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto have
executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal & Signature of Bidder
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
Safety Related Check List during Construction of Sub - Station
Contractor License / Registration No.: .......................................... Validity .......................
A. SUB STATION CIVIL WORKS:
SN Description of Activity Feed back Remarks
I): SAFETY DURING EXCAVATION :
1. Check Sub station area has been protected by constructing Yes/No.
boundary wall all around the sub station to avoid entry of
passerby / unauthorized person or animal in the sub station.
2. De watering arrangement is available (If necessary ) Yes/No.
3. Check proper / adequate arrangement is made for extension of Yes /No.
electric supply. (Proper size of cable, Use of fuse, No loose
connection and no naked wire connection to Pumps /
Illumination / Electric compressors etc. if applicable).
4. Check arrangement of illumination at construction site is Yes/No.
Check dumping of Excavated soil (Minimum 1.5 Mts. Or half Yes /No.
the depth of the pit which ever is more from the edge of the pit.)
6. Check Shoring & Shuttering to protect the loose rock / soil Yes /No.
against fall, (if required).
7. Check lone worker is not be allowed to work in the excavated Yes /No.
Ensure Laying of temporary cables used for operation of Yes/No.
Machines used during construction should not cause any
danger for electrocution of persons / animals.
9. Ensure that before undertaking excavation, the soil has been Yes/No.
tested and in case of availability of any explosive / dangerous
gas, necessary arrangement must be made to remove / dilute
10. such gases. of underground installations such as sewers, water
The positions Yes/No.
pipes and electrical cables has been verified and in case of their
existence, they must be isolated before further excavation works
to ensure Human Safety.
11. Check that the scaffolds are not overloaded in any case. Yes /No.
Scaffolds are to be erected and supported properly.
12. Stability of the soil of the excavated pit for safe working is to Yes/No.
be checked and certified by a competent person daily before
start of work. A register at site is maintained where competent
person can certify accordingly. No manhole should remain
uncovered during night & off days.
Seal & Signature of Bidder
SN Description of Activity Feed back Remarks
13. Check the provision of sufficient strong ladder of suitable length Yes/No.
is available near the working place during excavation.
25. Check if any permission is required from local statutory body Yes/No.
before excavation.
15. Check for No undercutting / toe cutting in soil. Yes/No.
16. Check after excavation the work should be speedily completed Yes/No.
without delay and back filling done at the earliest.
17. Check for any possibility of seepage of water from nearby pond Yes/No
/ river has been estimated and taken care of.
18. Check to avoid slide / collaps of side walls of excavated pit, the Yes/No.
excavation is to be done in trapezoidal cross - section.
(a) II ): Safety precaution during Storage, Handling and Use of Blasting Material:
1 Check that the adequate arrangement is made for the storage of Yes/No.
blasting material at safe place. (Temporary Magazine is to be
installed observing all norms) as per Indian Explosive Act.
2. Check that the blasting materials is handled by licensed blaster Yes/No.
with due care at site. (If applicable)
3. Check smoking is prohibited in the vehicle carrying explosives. Yes/No.
4. Check that the Blaster is holding proper license issued by the Yes/No.
appropriate authority. As per Indian Explosive Act.
5. Check that the length of the fuse wire used during blasting Yes /No.
operation is adequate.
6. Check while transportation, no unauthorized person is allowed Yes/No.
in vehicle carrying explosives.
7. Check that the loading and unloading of explosives is being Yes/No.
done carefully.
8. Check explosives and detonators or blasting caps is not being Yes/No.
transported in the same vehicle.
9. Check while transportation the detonators and explosives are Yes/No.
not carried loose or mixed with other materials.
10 Check surplus explosives shall not be stacked near working area Yes/No.
during loading / unloading.
11 Check explosives shall not be held in hands when lightening the Yes/No.
Check that blasting in the open has been carried out during the Yes /No.
12 fixed hours every day or on fixed days in the week so that the
public at large should know about this.
13. Check that arrangement has been made to display sufficient Yes/No.
warnings / sign board to enable the people to get out of the
blasting area to get off the danger zone
25. Check that the danger zone has been suitably cordoned off. Yes/No.
15. Check during blasting operations begin / after the firing Yes/No.
of explosives shall follow the loud siren.
16 Check that during blasting operation, Labour / Workmen / Yes/No.
Passerby are at safe places and arrangement is made to inform
Seal & Signature of Bidder
SN Description of Activity Feed back Remarks
caution markings (Red Flag) / Public Notices etc.
17 Check that PPEs i.e. Safety helmets, Safety Shoes, is used by Yes/No.
blaster and their gang members during blasting and also the
persons supervising the blasting operations.
18. For covered blasting ensure placement of cover plates of proper Yes/No.
thickness and sufficient numbers of sand filled bags.
19. Ensure that permission for blasting has been obtained from the Yes/No.
appropriate authority.
(b) III) Safety during casting of Foundation / Concreting :
1. Check construction materials are stacked at safe place and also Yes/No.
does not cause any danger. (Away from pit) i.e. 1.5 Mtrs. or half
the depth of the pit which ever is more.)
2. Check proper arrangement of illumination at Construction Site Yes /No.
of Sub station is available.
3. Check that the Concreting Mixer/ Vibrator machines etc are Yes/No.
placed at a safe place (Not very near to any pit at least 1.5 Mtr.
from the edge of the pit) to avoid transfer of vibrations and
should be operated by skilled persons.
4. Check proper / adequate arrangement is made for extension of Yes/No.
electric supply. (Proper size of cable, Use of fuse, No loose
connection for De watering Pumps / Illumination / Electric
compressors etc. if applicable).
5. Check for laying of temporary cables used during construction Yes/No.
activities should not cause any danger for electrocution to
persons / animals.
6. All bracing, struts and shuttering in excavations shall be Yes/No.
adequately secured so as to prevent their accidental
7. Ensure Shuttering and timbering has been made as detailed in Yes/No.
I:S: 3764 for protecting the loose rock / soil against fall.
8. Check for proper placing of Hydraulic jacks with stability and Yes/No.
constant watch of these instruments (which are continuously
loaded) to avoid any danger of displacement causing sever
B. SAFETY DURING STRUCTURE, EQUIPMENT ERECTION & CABLE LAYING ETC. :
SN Description of Activity Feedback Remarks
1. Check Back filling done prior to erection activity. Yes/No.
2. Check the derrick used before structure erection has been Yes/No. Test certificate is
checked for adequate strength / size and no joints are required apart
permitted. from visual
3. Check that the pulleys used before structure erection / Yes /No. Test certificate is
Equipment Erection has been checked for adequate required apart
strength / proper size (diameter), also in case of open type from visual
pulleys proper locking arrangements like providing of inspection.
Seal & Signature of Bidder
SN Description of Activity Feedback Remarks
made Safe working load should be punched.
4. Check the ropes used before structure erection / Yes/No. Test certificate is
Equipment Erection has been checked for adequate required apart
strength / physical condition (free from break of strands from visual
and knots etc. inspection.
5. Check that the lifting tools and tackles are in healthy Yes/No. Test certificate is
condition and has been tested periodically. required apart
6. Check permission has been obtained from Aviation Yes/No.
Authority for erection of Lightning Mast which comes in
the vicinity of flying zone. (Where necessary )
7. Check that all Nuts and Bolts are fitted in the structure Yes/No.
before undertaking the job of other section of the structure
and are tightened.
8. Check area has been cordoned off to prevent injuries to Yes/No.
unauthorized persons from hitting against
structural component or falling in the excavated pits.
9. Check that danger plates are available on all the equipment Yes/No.
& structures in the switchyard.
10. Check demarcation of feeder is done for Double Circuit Yes/No.
11. Check only erection team members are allowed to stand Yes/No.
near the structure / Equipment while erection is in process
and should wear the safety helmet / Safety Shoes.
12. Check proper guying arrangement has been made while Yes/No.
lifting structure / Equipment, if necessary.
13. Check that proper arrangement is made while lifting the Yes/No.
structure members and fixing them at height i.e. Proper
size and strength of the hook used for lifting the
structure members.
25. Check sufficient numbers of guys are made while lifting Yes/No.
the assembled structure / heavy loads and also avoiding
use of single sheeve pulleys while lifting the assembled
structure / heavy load.
15. Check arrangement has been made for equipment Yes/No.
identification.
16. Check that required painting made on tower falling in the Yes/No.
vicinity of aviation zones. (Where necessary.)
17 Check no live wires nearby. Take shut down if necessary. Yes/No.
18. Check the structure has been permanently earthed. Yes/No. "
19. Check crane are preferably be used for erection of pipe Yes/No.
structure in the sub station building works (if required.)
20 Check all safety procedures for erection work like use of Yes /No.
safety helmets, Safety belts, use of guy wires, lowering /
lifting of tools by rope etc. are strictly adhered to during
structure erection works is in progress in the switchyard.
21 Check that correct size of spanner (Box or ring type) as
Seal & Signature of Bidder
SN Description of Activity Feedback Remarks
as DE spanners is being used. Yes/No.
22. Check working area of the structure has been demarcated Yes/No.
during erection.
23. Check heavy structures are lifted with crane with proper Yes/No.
24. Only polypropylene ropes are to be used to tie the Yes/No.
aluminium tube / Bus bar since this is soft material and
will not damage aluminium tube / Bus bar during
25. erection.that R clips in insulator caps are fixed properly to
Ensure Yes /No.
avoid disconnection of insulator discs.
26. Ensure that all the necessary security pins (split pins) are Yes/No.
27. Check all nuts of jumper fittings are properly tightened Yes/No.
and live metal clearance have been maintained
as per GETCO specification.
28. In case of tension fitting dead end joint dimensions Yes/No.
before & after the compression are checked and
No damaged component of any hardware fitting should Yes/No.
be used on works.
30. Length of jumpers has been measured properly to give it Yes/No.
a parabolic shape. No sharp bend should exist.
31. Check surge counter erection facilitates proper reading Yes/No.
and that earthing is done with minimum bends.
32. Check Surge monitor has been earthed by connecting it Yes/No.
to main earth mat with (G I Flat 75 x 12 mm) and earth
pit separately as per drawing.
33. Check the alignment of earth switch with isolator, earth Yes/No.
switch of isolator is put into operation and the contacts
are cleaned. After completion of pre commissioning
checks and formats are dully filled and signed.
34. Ensure that the rubber beedings are kept in good Yes/No.
Check CT has been placed on the support structure very Yes/No.
carefully and all nuts have been tightened. Earthing is
done as per drawing.
36. Ensure the lattice structure of CT has been earthed at two Yes /No.
37. Check the marshalling box in the switchyard has proper Yes/No.
illumination arrangement.
38. Check the capacitor unit is short circuited & earthed, Yes /No.
until erection and commissioning works are being done
on CVT. (The capacitor get charged by the electrical
fields in the vicinity and they keep these charges for a
long time, which can be dangerous to human life. Hence
the shorting of capacitor unit is necessary). It should be
removed before tests /use.
39. Check Fuses in the marshaling box are OK. Yes/No.
Seal & Signature of Bidder
SN Description of Activity Feedback Remarks
40. Check proper earthing of CVT tank has been done. Yes/No.
41. Check all housing accessories, mounting stools including Yes/No.
bolts / Nuts for fixing Line Trap and insulators are of non
magnetic material.
42. Check H.F. point of CVTs on which the coupling device Yes /No.
is not mounted has been earthed.
43. Check the remaining CVTs have been earthed thro' Yes /No.
coupling device.
44. Cable drums after visual inspection should be Yes/No.
stored preferably in the covered area. Cable ends should
45. Ensure each cable and conduit run should be tagged with Yes/No.
cable identity numbering as per the approved that appear
in the cable and conduit schedule.
46. The tag should be of aluminium plate with ID number Yes/No.
punched on it and securely attached to the cable conduit
by not less than two turns. Cable tags should of rectangular
shape for power cables and of circular shape for control
47. Check underground cable markers should project 150 mm Yes/No.
above ground and spaced at an interval of 30 Mts. They
shall be located on both sides of road and drain crossing
and also at every change in direction.
48. Check cable tags should be provided inside the Yes/No.
switchgear, motor control centres, control and relay panels
etc. wherever required for cable identification, where a
number of cables enter together through a gland plate.
49. The cable (power and control) between LT stations, Yes/No.
Control room, DG set building and fire fighting pump
house should be laid in the buried cable trenches. In
addition to the above, for lighting purpose also, buried
cable trench can be used in outdoor area.(as per
Technical specification of specific contract)
50. Cable route and joint markers and RCC warning covers Yes/No.
should be provided wherever required. The voltage grade
of cables should be engraved on the marker.
51. Tray Identification Number on each run of trays at an Yes/No.
interval of 10 Mtrs should be painted.
52. In case the outer sheath of a cable is damaged during Yes/No.
handling / installation, the same should be repaired to the
satisfaction of the site. In case any other part of a cable is
damaged, the same should be replaced by a healthy cable.
Power cables should be at the top most layers. The armor
of control cable is to be earthed.
53. All cable termination should be appropriately tightened to Yes/No.
ensure secure and reliable connections. All the exposed
parts of cable lugs should be covered with tape, sleeve or
Power and control cables are laid on separate cable trays Yes/No.
Seal & Signature of Bidder
SN Description of Activity Feedback Remarks
55.Co-axial cable is laid separately from power cable. Yes/No.
56.All cable trays, racks and metallic ducts have been Yes/No.
grounded by connecting each to earth / mat. (As per
57. Check sections of cable trays have been bridged by copper Yes/No.
jumpers/ GI to retain continuity of earthing. (As per
58. Check earthing of panel is done by the erection contractor Yes/No.
for connecting it with switchyard earth mat. ( As per
59. Auxiliary bus wiring for AC and DC supplies, Voltage Yes/No.
Transformer circuits, annunciation circuits and other
common services is provided near the top of the panels
running through out the entire length of the panels.
60. All internal wiring to be connected to external equipment Yes/No.
is terminated on terminal blocks, preferably vertically
mounted on the side of each panel.
61. Check whether Mimic Diagram is available preferably Yes/No.
made of anodized aluminium or plastic of approved fast
colour material and screwed on to the panel that can be
easily cleaned.
62. Check the panels all equipment mounted on front and rear Yes/No.
side as well as equipment mounted inside are provided
with individual name plates with equipment designated
63. Check on top of each panel on front as well as rear side, Yes/No.
large and bold name plates are provided for circuit /
feeder designation.
64. Check all front mounted equipments are provided at the Yes/No.
rear with individual name plates engraved with tag
numbers corresponding to panel internal wiring to
facilitate easy tracing of the wiring.
65. Check the name plates mounted directly by the side of the Yes/No.
respective equipments should not be hidden by equipment
66. Check availability of 240V single phase 50 HZ, AC socket Yes/No.
with switch suitable to accept 5 Amps and !5 Amps pin
round standard plug, is provided in the interior of each
cubicle with ON-OFF switch for connection of hand
61. Check that panels are provided with a fluorescent lighting Yes/No.
fixture rated with 240 Volts single phase, 50 Hz supply for
the interior illumination of the panel during maintenance.
The fittings are complete with switch fuse unit and
switching of the lighting is controlled by the respective
panel door switch. Adequate lighting with fuse unit is also
provided for the corridor in control panels.
Seal & Signature of Bidder
68.Check control panels are provided with necessary Yes/No.
arrangements for receiving, distributing, isolating and
fusing of DC and AC supplies for various control,
signalling, lighting and space heater circuits. The
incoming and sub circuits are separately with switch fuse
69. Check panels are provided with a space heater rated for Yes/No.
240 V, single phase, 50 Hz, AC supply for the internal
heating of the panel to prevent condensation of moisture.
70. Check all panels are equipped with an earth bus securely Yes/No.
71. Check when several panels are mounted adjoining each Yes/No.
other, the earth bus is made continuous with necessary
connectors and clamps for this purpose.
72. Check provision is made for extending the earth bus bars Yes/No.
to adjoining panels on either side.
73. Check provision is made on each bus bar of the end panels Yes/No.
for connecting earthing grid.
74. Check all metallic cases of relays, instruments and panel Yes/No.
mounted equipment including gland plates are connected
to the earth bus by copper wires of specified size.
75. Check the colour code of the earthing wire is green. Yes /No.
76. Check that earthing made with equipment is with Nuts and Yes /No.
Bolts i.e. For such connection lugs should be pressed and
tightened to the terminals through Nuts and Bolts.
77. Check that no equipment is mounted on the panel doors. Yes/No.
78. Check each switch should bear clear inscription identifying Yes/No.
79. Check those who have sufficient knowledge of steel Yes/No.
structural job have been employed in steel structural works
Check necessary instruction has been communicated by Yes/No.
supervisor before start of the day's works to workmen
under his control.
81. Storing of equipments is to be made properly to avoid any Yes /No.
accident during handling.
82. Check all Nuts and bolts are properly raised or lowered Yes /No.
preferably using closed loop pulleys and gully bags / hand
bags tied at the end for carrying nuts and bolts.
83. Check that Fire resistant sheets are used before entrance Yes/No.
of control cable in control room.
84. Check air compressor tubing properly tightened. Yes/No.
85. Check all carrying connectors / clamps properly tightened. Yes/No.
c. CONDUCTOR LAYOUT DURING CONSTRUCTION STAGE
SN Description of Activity Feed back Remarks
1. Check all members are fixed in structure and ensure proper size Yes/No.
of Nuts and Bolts are rigidly tightened and punching / tacking /
tack welding is done in towers / structures before undertaking
conductor laying job.
2. Ensure proper scaffolding arrangements made during laying of
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1.Part view R20- PARTLAYOUT 400KV ASOJ SS DT 21.08.25.pdf
2.Project perticulars.pdf
3.R20- PARTLAYOUT PLAN OF 400KV ASOJ SS DT 21.08.25-Model.pdf
4.TS SS STR R11 22.06.2022.pdf
5.AL59 ZEBRA MOOSE GETCO- R3 Print copy.pdf
6.EARTH WIRE - R4 - Print copy.pdf
7.EARTH WIRE ACCESSORIES 7-3.15 PRINT COPY.PDF
8.G.I. EARTHING STRIPS.PDF
9.HW ACCS AL59 CONDUCTOR PRINT COPY R2 JULY 2022.pdf
10.LT Control Power Cable Print COPY.PDF
11.MQP SUPPLIER COPY.PDF
12.MS PLAIN TOR BAR.PDF
13.R1 - STEEL DRUM.pdf
14.R5 - Silicon Rubber Insulator - Print Copy.pdf
15.SS HW 220 400KV SS PRINT COPY.PDF
16.WEDGE CONNECTORS R1 July-22.pdf
17. TS ILLUMINATION R8 101016.pdf
18 Amendment-I for Illumination TS.pdf
19 Amendment-II for Illumination TS.pdf
20 TYPICAL FITTING LAYOUT OF STD CR ILLUMINATION FOR 66KV SS-R1.pdf
21. TYPICAL SCHEMATIC DIA FOR STD CR ILLUMINATION FOR 66KV SS-R1.pdf
22. STANDARD LIGHTING POLES 24.12.19.pdf
23.66 kV CT PT - PH R2 Jun-22.pdf
24.66 kV Isolator R6 June- 22.pdf
25.66 KV LA R6 June 22.pdf
26.132 kV CT PT R11 Jun -22.pdf
27.220 132 KV 66kV CB (R5) with FDN plan.pdf
28.220 kV CT PT R10 Jun -22.pdf
29.400 kV CT R6 Jun -22.pdf
30.400 220 132 66 KV BPI R4 June-22.pdf
31.400 220 132 kV LA R6 June 22.pdf
32.400 220 132 kV DB Tandem Isolator R6 June 22.pdf
33.400kv SF6 CB with CSD sp- sp R6 June 2023 with FDN plan.pdf
34.400kv SF6 CB with PIR sp sp R6 June 23 with FDN plan.pdf
35.Amendment - 22.06.2023.pdf
36.Amendment-1 to TS of 66kV CRP_ 180423.pdf
37.Amendment-1 to TS of 400_220_132 kV CRP_ 180423.pdf
38.Connection Of Four Electrode Method Of Measuring Soil Resist.pdf
39.DETAILS OF EARTHING FOR D.P.STRUCTURE-Model.pdf
40.DETAILS OF PANEL EARTHING-Model.pdf
41.EARTHING NOTES-Model-3.pdf
42.EARTHING NOTES-Model-4.pdf
43.MAINTENANCE FREE EARTHPITS R3 29.05.20-Normal Soill.pdf
44.MAINTENANCE FREE EARTHPITS R3 29.05.20-Rocky Soill.pdf
45.MEASUREMENT OF EARTH RESISTIVITY-Model.pdf
46.R1 Lightning Arrestor DT 070916.pdf
47.R1 TYPICAL EARTHING ARRANGEMENT FOR CVT-PT DT 070916.pdf
48.R1 Typical Earthing Arrangement for Power Tran DT 070916.pdf
49.SLIDING GATE-Model.pdf
50.Standard Earthing Philosophy of GETCO R1 010708.pdf
51.Standard Guideline for Earthing of EHV SS- GETCO R3 250517.pdf
52.Terminal Connectors R2 June 22.pdf
53.TS - Bay MK - R2 June 22.pdf
54.TS - CT-PT-CVT JB - R1 June 22.pdf
55.TS - Yard LT ACDB - R2 June 22.pdf
56.TS Cable Tray.pdf
57.TS General Erection R1.pdf
58.TS_66 KV Control and Relay Panels_R6_211123 Final.pdf
59.TS_400_220_132 kV Control and Relay Panels_R8_160922.pdf
60.TS_Protection Relays for 66 kV System_R2_260722 1.pdf
61.TS-Maintenance Free Earthpit 040615.pdf
62.TYPICAL ARRANGEMENT OF EARTH TEST PIT(CHEAK PIT)-Model.pdf
63.Typical Arrangement of Riser for Earthing System-Model.pdf
64.Typical Arrangement of Welding Joint(NEW)-Model.pdf
65.TYPICAL EARTHING ARRANGEMENT FOR BMK-Model.pdf
66.TYPICAL EARTHING ARRANGEMENT FOR BPI-Model.pdf
67.Typical Earthing Arrangement for Circuit Breaker-Model.pdf
68.TYPICAL EARTHING ARRANGEMENT FOR CT-Model.pdf
69.TYPICAL EARTHING ARRANGEMENT FOR EQUIPMENT OF CAPACITOR BANK.pdf
70.TYPICAL EARTHING ARRANGEMENT FOR ISO.-Model.pdf
71.TYPICAL EARTHING ARRANGEMENT FOR LM-Model.pdf
72.Typical Earthing Arrangement for Switch Yard Gate-Model.pdf
73.TYPICAL EARTHING ARRANGEMENT FOR TOWER WITH PEAK-Model.pdf
74.TYPICAL EARTHING ARRANGEMENT FOR TOWER WITHOUT PEAK-Model.pdf
75.TYPICAL EARTHING ARRANGEMENT OF CABLE TRENCH-Model.pdf
76.Amendment- Structure weight.pdf
77.EMD BG Format.pdf
78.ERECTION Circular-1.pdf
79.ERECTION Circular-2.pdf
80.Form of LD undertaking 1A.pdf
81.Form of LD undertaking 1B.pdf
82.Letter for CBuD.pdf
83.MAAT LA Networth Form.pdf
84.ON - Ammendment for ROW clause Tender Copy.pdf
85.ONLINE SCHEDULE TECH - E-498.pdf
86.Online Schedule-QR-E-498.pdf
87.Public Procurement Circular of GOI.pdf
88.RoW policy 2021.pdf
89.Safety regulation for transmission line.pdf
90.SD cum PBG Format.pdf
91.STD FQP TR LINE JUNE-2014.pdf
92.TTR Validity ammentment -2.pdf
93.Tender Specification Part-1 TR bay 400KV Asoj-E-498.pdf
94.Ammendment-1 Part-1 TR bay 400KV Asoj-E-498.pdf
95.Tender Notice TR bay 400KV Asoj-E-498.pdf
96.BOQ Switchyard Protection-Scada for Ref.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .