| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.5 LAccepted-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | ₹2.5 L Quoted ₹2.8 L | 1 | Accepted-AOC L1 |
| 2 | 2₹2.9 LRejected-AOC | ₹2.9 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DAISY JOSE L1 | Steev thomas L2 |
|---|---|---|---|---|---|
| 1.00Sluice Construction | |||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 7.65 | cum | 283.39 ₹2,167.93 | 296.27 ₹2,266.47 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 7.65 | cum | 144.12 ₹1,102.52 | 150.67 ₹1,152.63 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 5.99 | cum | 11,537.64 ₹69,110.46 | 12,062.09 ₹72,251.92 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 479.2 | kilogram | 123.67 ₹59,262.66 | 129.29 ₹61,955.77 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 58.63 | sqm | 424.77 ₹24,904.69 | 444.08 ₹26,036.85 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 5.4 | sqm | 1,057.36 ₹5,705.51 | 1,105.43 ₹5,964.90 |
| 1.01 | 13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively. | 5.94 | sqm | 76.6 ₹455 | 80.09 ₹475.73 |
| 1.01 | 2.3.1:Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50 m and lift up to 1.5 m :All kinds of soil | 18 | cum | 749.58 ₹13,492.44 | 783.66 ₹14,105.88 |
| 1.01 | OD169/2025-2026:Extracting Existing Precast Sluice Structure from underwater & Conveying New - precast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of the hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage. | 1 | set | 72,383.08 ₹72,383.08 | 75,673.22 ₹75,673.22 |
Tender Value
₹2.5 L
EMD Value
₹6,337
Closing Date
18 Feb 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer MI Subdivision Aluva
Reconstruction of damaged sluice
2026_Irrig_836091_1
IRR/IA/TR/1945/2025_5_1_1/1
Open Tender
Civil Works - Others
90 days
THATHAPALLY
PLEASE REFER TENDER DOCUMENTS
10 documents required · 10 mandatory
₹560
Yes
₹6,337
Yes
13 Mar 2026
13 Feb 2026
19 Feb 2026
13 Feb 2026
18 Feb 2026
13 Feb 2026
13 Feb 2026 - 18 Feb 2026
Sluice Construction
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
13.59:Coal tarring two coats on new work using 0.16 litre and 0.12 litre coal tar per sqm in the first coat and second coat respectively.
2.3.1:Banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead up to 50 m and lift up to 1.5 m :All kinds of soil
OD169/2025-2026:Extracting Existing Precast Sluice Structure from underwater & Conveying New - precast slab, vertical post, bottom slab horizontal etc to the site and erecting in position in lines and level and form the sluice including hire charges of the hydraulic excavator for conveying tools, chain and labour for loading the slab to the excavator and unloading at site, labour for erecting bottom and vertical slab to the line and level etc complete without any damage.
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
60.8:Shutter for check dams- Supplying and providing Thambagam wood shutter planks 5cm thick including cost of materials and labour charges etc complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1407184.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.84 MB
Tendernotice_3.pdf
PDF • 0.05 MB
Tendernotice_4.pdf
PDF • 0.08 MB
BOQ_1407184.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid