Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance | -20.91% | ₹7.9 L | L1 | Admitted-Finance |
| 2 | L2₹8.4 L+₹57,710 (7.33%)Admitted-Finance | -15.11% | ₹8.4 L+₹57,710 (7.33%) | L2 | Admitted-Finance |
| 3 | L3₹8.6 L+₹68,754.50 (8.74%)Admitted-Finance | -14.00% | ₹8.6 L+₹68,754.50 (8.74%) | L3 | Admitted-Finance |
| 4 | L4₹8.8 L+₹92,933 (11.8%)Admitted-Finance | -11.57% | ₹8.8 L+₹92,933 (11.8%) | L4 | Admitted-Finance |
| 5 | L5₹8.8 L+₹93,132 (11.8%)Admitted-Finance | -11.55% | ₹8.8 L+₹93,132 (11.8%) | L5 | Admitted-Finance |
Tender Value
₹9.9 L
EMD Value
₹19,900
Closing Date
3 Aug 2026, 6:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA MATHANIYA
CONSTRUCTION OF EMBANKMENT AND GRAVEL AT VARIOUS LOCATIONS IN MUNICIPAL AREA MATHANIYA
2026_DLB_576991_1
NPM NIT NO 1477 DATE 23-07-2026
Open Tender
Civil Works
Percentage
NAGAR PALIKA MATHANIYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
NAGAR PALIKA MATHANIYA/ MD RISL
₹19,900
Yes
7 Aug 2026
23 Jul 2026
4 Aug 2026
23 Jul 2026
3 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) | 1 | Cum | 178.5 | ₹178.5 |
| 2 | Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 1 | Cum | 1,106 | ₹1,106 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_1025611.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .