| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAccepted-Finance | L1 | Accepted-Finance 1 Lowest | |
| 2 | L2₹44.7 L+₹5.2 L (13.3%)Rejected-Finance | L2 | Rejected-Finance 2 Lowest |
| Sl No | Description | Qty | Unit | S Mohana Kumar L1 | D.JOHN L2 |
|---|---|---|---|---|---|
| 1.00Appendix -1, Initial rectification work | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 17 | cum | 2,223.24 ₹37,795.08 Lowest | 2,518.8 ₹42,819.6 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 17 | cum | 4,822.76 ₹81,986.92 Lowest | 5,463.89 ₹92,886.13 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 8,400 | sqm | 10.45 ₹87,780 Lowest | 11.83 ₹99,372 |
| 1.00 | OD109457/2025-2026:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 55kg/10m2) by manual means. | 8,400 | sqm | 248.31 ₹20,85,804 Lowest | 281.32 ₹23,63,088 |
| 1.00 | OD109458/2025-2026:Dry rubble masonry for retaining wall foundation and superstructure work including cost and conveyance of materials and all labour charges etc complete as per the directions of departmental officers at site | 140 | cum | 3,614.77 ₹5,06,067.8 Lowest | 4,095.32 ₹5,73,344.8 |
| 1.01 | 12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications | 0.21 | MT | 87,481.48 ₹18,546.07 Lowest | 99,111.37 ₹21,011.61 |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 3.5 | cum | 8,007.1 ₹28,024.85 Lowest | 9,071.57 ₹31,750.5 |
| 2.00Appendix -2 Pre monsoon work | |||||
| 2.00 | OD109461/2025-2026:Lifting conveying and fixing the old RCC covering slab of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc. | 5.2 | cum | 2,784.66 ₹14,480.23 Lowest | 3,154.85 ₹16,405.22 |
Tender Value
₹46.4 L
EMD Value
₹50,000
Closing Date
4 Nov 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
PWD Roads Division Thiruvananthapuram
GENERAL-RM 2025-26-RC 2 - Phase 1 -One year running contract for various PWd roads under Roads section Aryanadu in TVM district -4 road stretches for a length of 15 85km Vellanadu Valiyara Meppattumala Sangaramugham road km 0-000 to 5-000 Kuriyathi
2025_PWD_816098_1
PWD/RB/TR/13986/2025_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
360 days
TVM
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
10 Nov 2025
28 Oct 2025
6 Nov 2025
28 Oct 2025
4 Nov 2025
28 Oct 2025
Amount
Appendix -1, Initial rectification work
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD109457/2025-2026:Close graded premix surfacing / Mixed Seal Surfacing -Providing, laying and rolling of close graded premix surfacing material 20mm thickness composed of 11.2mm to 0.9mm Type A aggregate using penetration grade bitumen using VG 30 to required line,grade and level to serve as wearing course on previously prepared base,including mixing in a suitable plant,laying & rolling with a three wheel 8 to 10KN static roller & finishing to required level & grade as per technical specification clause 509 of MORD (usage of bitumen is 55kg/10m2) by manual means.
OD109458/2025-2026:Dry rubble masonry for retaining wall foundation and superstructure work including cost and conveyance of materials and all labour charges etc complete as per the directions of departmental officers at site
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
Appendix -2 Pre monsoon work
OD109461/2025-2026:Lifting conveying and fixing the old RCC covering slab of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc.
OD109460/2025-2026:Engaging wood cutter for cutting the branches of trees.
OD109464/2025-2026:Hire Charges for wood cutting equipment's , pulleys etc.
OD109462/2025-2026:Clearing chocked up side drain by manual means and depositing the waste material for a minimum distance of 5Km lorry conveyance as per clause 305. etc complete.
OD109465/2025-2026:Engaging tipper
OD109459/2025-2026:Engaging excavator
2.3.2.A:Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness In area of light jungle - By Mechanical Means
Appaendix -3 Preventive maintenance work
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
OD109578/2025-2026:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications<br> PCC Grade M15 ( Without formwork)
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
55.25:Lifting, conveying and fixing the newly casted RCC covering slabs of any thickness on top of drain in position including all labour charges and miscellaneous expenses etc complete
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD194857/2025-2026:Mixed seal surfacing Providing and rolling of close graded pre mix surfacing material of 20mm thickness composed of 11.2 mm to 9mm (Type A )aggregate using Bitumen VG -30 to required line ,grade and level to serve as wearing course on a previously prepared base, including mixed in suitable plant and rolling with a static roller 8-10 KN and finishing to required level and grades as per Technical specification.
OD109467/2025-2026:Filling up potholes with bituminous ready mix compound(25kg bag) and compacting by ramming to get a compact surface including of cost of materials, laying charges,transportation to site etc. complete.Rate isarrived for a bag of 25kg
D.JOHN (BID ID -2423966)
Bidder Name
S Mohana Kumar
D.JOHN
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1366755.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
preliminaryagreement1.pdf
Tender Documents • 0.06 MB
viewsbd13986.pdf
Tender Documents • 1.64 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
EPAYMENTFORM1.pdf
Tender Documents • 0.05 MB
AffidavitForm1.pdf
Additional Documents • 0.03 MB
integrity_pact.pdf
Additional Documents • 0.05 MB
BOQ_1366755.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .