| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹24.3 Laccepted-aoc | ₹24.3 L | accepted-aoc |
Tender Value
₹30.0 L
EMD Value
₹29,984
Closing Date
13 Jul 2026, 3:30 pmClosed
commissioner Proddatur Municipality
O/o of the commissioner Proddatur Municipality
Proddatur Municipality - Laying of CC Road from D No 8/136 in Gandhi Road to 8/170 at Maternity Hospital in 10th Election Ward under 15th FC 2024-25 (1st Installment) Untied Grant
950106
54/2026-27-E1, dt. 23.06.2026
OPEN - NCB
Road Work
YSR
5 documents required · 5 mandatory
₹1,062
₹29,984
17 Sept 2026
27 Jun 2026
27 Jun 2026
Collection, supply and Filling with Stone Crusher Dust (Finer than 3mm HBG m/c) in layers by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges etc., complete for finished item of work. (APSS NO. 309 & 310) (RBR - F NDN - 2)
Supply and placing separation membrane of impermeable plastic sheeting 125 micron thick under pavement slab including cost and conveyance etc., complete. As per SSR P25/177 (PH)
Plain Cement Concrete pavement M-30 (Grade) using 20 mm graded m/c metal with 43 grade OPC cement as per Clause 1501.2.2, using approved mix design, laid in approved fixed side formwork, spreading the concrete and compacted using plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, curing of concrete for 21 - days as per drawing and Technical Specification Clause 1501 MORD. RBR-CCPV-5
Cutting the concrete pavement to a depth of 25mm and filling with Bituminous hot sealing compound at every 4.50mts interval including cost and conveyance of materials etc., complete at site of work. As per local rates
Dismantling of existing damaged CC work including clearing away and carefully stacking materials useful for reuse and labour charges etc,. Complete. BLD - CSTN - 12 - 1 - ii
Earthwork in excavation for structures as per drawings and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal up to a lead of 50 mts dressing of sides and bottom as per Technical Specifications 305 MORD / 304 MORTH. (RBR-FNDN-1-A)
Carting of waste material with a initial lead up to 3.00 km including loading, unloading charges etc,. Complete. P38/SSR2018-19 (PH)
Collection, supply and Filling with Stone Crusher Dust (Finer than 3mm HBG m/c) in layers by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges etc., complete for finished item of work. (APSS NO. 309 & 310) (RBR - F NDN - 2)
Providing Nominal mix (1:2:4) P.C.C grade M-20 concrete using 20 mm nominal size Graded hard stone aggregate with OPC, mechanically mixed, placed and compacted by vibration including curing for 21 days complete as per drawings and technical specifications. RBR-FNDN-4-5
Plastering in CM (1:3) Prop, 12mm thick using OPC grade cement including cost and conveyance of all materials, labour charges, curing complete etc. BLD-CSTN-6-1
RCC M- 20 Nominal mix (Cement:fine aggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shuttering. BLD-CSTN-2-13
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications for Bars below 36 mm dia including over laps and wastage, where they are not welded BLD-CSTN-2-18
Supply, Delivery and fixing in Position of MS Grill Door for Culvert Slabs of approved design including cost and conveyance of all materials labour charges etc complete as SS of as desired by Engineer - In - Charges.
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
54.xlsx
TENDER_DOCUMENT • 0.01 MB
Bid doc for 3.1.doc
TENDER_DOCUMENT • 0.34 MB
Part II .doc
TENDER_DOCUMENT • 0.02 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .