Loading…
Loading…
Tender Value
₹3.5 Cr
EMD Value
₹3.5 L
Closing Date
7 Apr 2026, 7:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer, Panchyat Irrigation Division Devbhumi Dwarka
Restoration work of Reclamation scheme at Vi. Kalavad Simani Ta. Khambhaliya Di. Devbhumi Dwarka
283957
14 Of 2025-26
Open
Civil - All
Devbhumi Dwarka
6 documents required · 6 mandatory
₹6,000
Yes
Executive Engineer Panchayat Irrigation Division Devbhumi Dwarka
₹3.5 L
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
7 Apr 2026
9 Mar 2026
BOQ(Bill Of Quantity)
SR. NO. ITEM QUANTITY UNIT AMOUNT (INR)
Excavation in all sort of strata and formations incl. depositing the unuseful
excavated stuff as and where directed incl sorting and stacking useful materials
as directed upto 200 mt lead and all lift etc. complete incl.
A) IN OVERBURDEN INCL. HARD MURRUM. 12200.00 Cum 79.00
Saurashtra-Kutch Region SOR 2024-25, CH.1 Item No. 4 Page No.
Providing & Laying in position controlled cement concrete using cement sand &
crushed metal aggregate by machine mix incl. necessary formworks, compaction
2 by mechanical vibrator curing as directed with all lead and lift etc complete. 2130.00 Cum 4890.00
Excluding the cost of steel. (i)For bucket and endsill Etc (C) Concrete grade M25
and MSA-40mm(Graded)
Saurashtra-Kutch Region SOR 2024-25, CH.2 Spillway, Item No. 7(i)(C) Page No.
Providing,cutting,bending,binding and fixing in position as per drawing .TMT BAR
, reinforcement for R.C.C. works and anchor bars incl cost of black annealed 16 to
18 BWG M.S.. Wire etc.complete with all lead and lift.
Saurashtra-Kutch Region SOR 2024-25, CH.2 Spillway, Item No. 11 Page No.
Providing and laying STONE LOANCHING APRON by using 50% stone which
4 having weighing not less than 40 Kg or as specified incl hand packing and filling 1280.00 Cum 765.00
the interstices by spouls etc complete with all lead and lift.
Saurashtra-Kutch Region SOR 2024-25, CH.5 Checkdam, Item No. 15 Page No.
Construction of New Earthen bund And Strengthening of existing earthen bund
5 by obtaining earth from deepening village pond using watering / Pneumatic 86000.00 Cum 104.93
Temping work etc. Complete as suggested by Engineer in charge
6 Providing Excavator on hourly basis. Excavator-200 400.00 Hr 2400.00
Saurashtra-Kutch Region Irrigation, S.O.R. 2024-25, Data sheet Item No.83
7 Providing DUMPER/TRIPPER (10 T Capacity) on hourly basis. 250.00 Hr 900.00
Saurashtra-Kutch Region Irrigation, S.O.R. 2024-25, Data sheet Item No.84
Providing and laying dry rubble stone pitching without base, inverted
8 filter/murrum bedding and header stone including hand packing & trimming & 33550.00 Sqm 253.00
dressing slopes etc complete. b) 23 cms thick stone pitching
Saurashtra-Kutch Region SOR 2024-25, CH.1 Earthen Dam, Item No. 16, Page No.
Construction of temporary earthen bund, dewatering to facilitate excavation &
9 other aligned activities for proposed repairing work including removal of 1.00 Job 901200.00
temporary earthen bund and disposal within 1 Km of the same etc complete.
Total Cost (Rs.)
I/ We am /are willing to carry out the work at ………% above/below percent(should be written in figures and words)
of the estimated rates mentioned above.
Amount of tender works out as under.
*Estimate amount *Estimate amount
Put to tender Rs. Put to tender Rs. …
Deduct :………….% below Rs……………….. Add :..: ……………..% above Rs………
Net Rs Total Rs………………..
In Words Rupees In Words Rupees
*( Please strike out whichever is not applicable)
Note-1:- All works shall be carried out as per Public Works Department, Hand Book & other specifications of Division or as directed.
Note-2:- All the columns in Schedule should be filled in digitally & the total of the entries in the last column should be struck by the contractor under his
Note-3:- Rates quoted include clearance of the site (Prior commencement of work & at its close) in all respects & hold good for work under all conditions,
Note-4 The payment shall be made after availability fund. The contractor has no any claim in this regard.
Note-5 The Contractor shall exhibit a board with detailed specification and details of work as directed by the Engineer-In-Charge for which no extra
Note-6 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
Note-7 GST and Income tax TDS will be deducted at a source while making payments of bills
Note-8 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt.G.R.:PRC-10/2017 Cement Consumption/16/ C Date :
Note-9 The rates to be quoted by the contractor must be inclusive of all duties, taxes, and other levies Except GST payable by the contractor under the
Contractor Executieve Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
DTP Final Kalavad Simani.pdf
BOQ Kalavad.pdf
web tn 14 of 2025-26.pdf
NIT Kalavad.pdf
Download all tender documents and submit your bid