| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 CrAccepted-AOC 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | ₹2.4 Cr | L1 | Accepted-AOC Quoted L1 rate |
| 2 | L2₹2.6 Cr+₹28.2 L (12.0%)Rejected-AOC NO 152 E V R NAGAR SRIRANGAM TIRUCHIRAPPALLI 5 | TIRUCHIRAPPALLI | TAMIL NADU | 620001 | ₹2.6 Cr+₹28.2 L (12.0%) | L2 | Rejected-AOC Quoted L2 rate |
Tender Value
₹2.4 Cr
EMD Value
₹2.4 L
Closing Date
5 May 2023, 3:00 pmClosed
Project Director
DRDA Tiruchirappalli
Strengthening of 1 road in Manapparai Block in Tiruchirappalli District under the scheme of MGSMT 2022-23 Package No.30
2023_RDTN_300331_30
DIPR/2018/Tender/2023 Dated 05.04.2023
Open Tender
Civil Works - Roads
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.4 L
DRDA Tiruchirappalli
12 Jul 2023
1 May 2023
5 May 2023
1 May 2023
5 May 2023
1 May 2023
4 May 2023
Amount
Strengthening to the Sooliyappatty-Podanguppatty via Engumampatty (R -21 -Km 0/0-3/820 Picking the existing mettaled surface and sectioning including all labour charges etc, complete.
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201 in all etc complete
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 0/0-1/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 1/0-2/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 2/0-3/0
Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for side berms KM - 3/0-3/820
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying 50mm consolidated thick bituminous macadam using 0.20cum fo 26.50-13.20mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRCmetal with 37Kgs of bitumen for pre mixing per 10sqm including hire charges and fuel charges for 20-30 to CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paver finisher,Vibratory/Pneumatic roller and all other tools and plant required ,including fuel and all other incidental charges etc., complete as per specification
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00-9.50mm,0.17cum of 9.50-2.36mm and 0.26cum of 2.36 and below with 47.28kgs of bitumen per 10 sqm including hire charges and fuel charges for 20-30 t CMP with bitumen boiler,tipper trucks,Paver Finisher/9m paverfinisher,Vibratory/Pneumatic roller and all other tools and plant required,including fuel and all other incidental chargesetc., complete as per specification
CH 220m Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff clay stiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravelly etc except sand and rock requiring blastingwith all incidental charges etc complete for foundation as per SS 20 B
Collection and supply of M-sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoring shuttering balingout water etc., complete For Abutment &wing
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Centering charges for the deck slab bottom to site including labour charges etc complete
Centering charges for the wall sides and deck slab sides to site including labour charges etc complete
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including charges etc., completefor Bed Block
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Deck Slab
Providing weepholes arrangements
Providing Bitumen pad arrangements
CH 2480m Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff clay stiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravelly etc except sand and rock requiring blastingwith all incidental charges etc complete for foundation as per SS 20 B
Collection and supply of M-sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoring shuttering balingout water etc., complete For Abutment &wing
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Centering charges for the deck slab bottom to site including labour charges etc complete
Centering charges for the wall sides and deck slab sides to site including labour charges etc complete
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including charges etc., completefor Bed Block
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Deck Slab
Providing weepholes arrangements
Providing Bitumen pad arrangements
CH 3430m Earth work excavation and depositingon bank with all lead and lift in all classes of soil such as hard stiff clay stiff black cotton hard red earth shales murrams, stoneyearth mixed wilht 50% fair mixed boulders, hard gravelly etc except sand and rock requiring blastingwith all incidental charges etc complete for foundation as per SS 20 B
Collection and supply of M-sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard speecifications
Cement concretein C M 1:4:8 mix using40mm ISS HBG metal includingcost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoringshutteringbalingout water etc., complete For foundation & basement
Cement concretein C M 1:3:6 mix using40mm ISS HBG metal including cost and conveyanceof all materials to siteand labour charges, cement which will be supplied bydept shoring shuttering balingout water etc., complete For Abutment &wing
Supplying & fabrication of steel for RCC works including cost and conveyance of steel to site including labour charges for cutting bending and tying rods and placing the grills in position for premeasurement asper steel schedule.
Centering charges for the deck slab bottom to site including labour charges etc complete
Centering charges for the wall sides and deck slab sides to site including labour charges etc complete
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all including charges etc., completefor Bed Block
RCC 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Deck Slab
Providing weepholes arrangements
Providing Bitumen pad arrangements
Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes.
Supplying and fixing Kilometer Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete
Providing and erecting of Retro - Reflectorised Cautionary, Mandatory and informatory signs (without definition board) including all charges etc. 60 cm Equilateral triangle cautionary signboard
Towards the charges for routline maintenance of the road work executed under MGSMT including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
SVT CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .