Loading…
Loading…
Tender Value
₹3.8 L
EMD Value
₹7,520
Closing Date
16 Jul 2026, 6:00 pm
Er. Rakesh Kumar
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
Please refer to BOQ
2026_PWDJK_314941_8
26 of 2026-27 dated 06-07-2025
Open Tender
Civil Works
30 days
Samba
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
₹7,520
EXECUTIVE ENGINEER PWD (RnB) DIVISION SAMBA
7 Jul 2026
7 Jul 2026
17 Jul 2026
7 Jul 2026
16 Jul 2026
7 Jul 2026
9 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within 50 meters lead. For thickness of tiles 10 mm to 25 mm | 140 | Sqm | 57 | ₹7,980 |
| 2 | Providing and laying in situ seven course water proofing treatment with APP (Atactic poly- propylene) modified Polymeric membrane over roof consisting of first coat of bitumen primer @ 0.40 litre per sqm, 2nd, 4th & 6th courses of bonding material @ 1.20 Kg/ sqm, which shall consist of blown type bitumen of grade 85/25 conforming to IS: 702, 3rd and 5th layers of roofing membrane APP modified Polymeric membrane of specified thickness, weight and centre core, HMHDPE film sandwiched on both sides with polymeric mix and the polymeric mix is protected on both side with 20 micron HMHDPE film. 7th, the top most layer shall be finished with brick tiles of class designation 10 grouted with cement mortar 1:3 (1cement:3 fine sand) mixed with 2% integral water proofing compound by weight of cement over a 12 mm layer of cement mortar 1:3 (1 cement: 3 fine sand) and finished neat (item of laying brick tiles shall be paid for separately.) Modified Polymeric membrane 2.0 mm thick of 3.0 Kg/ sqm weight consisting of five layers prefabricated with centre core as 100 micron | 140 | Sqm | 758.35 | ₹1,06,169 |
| 3 | Providing and laying integral cement based water proofing treatment including preparation of surfaces as required for treatment of roofs, balconies, terraces etc consisting of following operations. a) Applying a slurry coat of neat cement using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over the RCC Slab including adjoining walls upto 300mm height including cleaning the surface before treatment. b) Laying brick bats with mortar using broken bricks/ Brick Bats 25mm to 115mm size with 50% of Cement mortar 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20mm thick layer of cement mortar of mix 1:5 (1 Cement : 5 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineerin-charge to required slope and treating similarly the adjoining walls upto 300mm height including rounding of Junctions of walls and slabs) c) After two days of proper curing applying a second coat of cement slurry using 2.75kg/sqm of cement admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge. d) finishing the surface with 20mm thick joint less cement mortar of mix 1:4(1 cement: 4 coarse sand) admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300mm/sq 3mm deep. e) The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by Engineerin-charge. With average thickness of 120mm and minimum thickness at khurra as 65 mm | 140 | Sqm | 1,404.65 | ₹1,96,651 |
| 4 | Finishing walls with Acrylic smooth exterior paint of required shade: Old work (one or more coats applied @ 0.90 liters/ 10sqm) | 72 | Sqm | 78.95 | ₹5,684.4 |
| 5 | Engaging of labour for clearance and removal of malba as per direction of engineer-in-charge | 20 | No | 500 | ₹10,000 |
| 6 | Temporary removal / shifting of Solar Panel as per necessity at site as per direction of engineer-in-charge | 1 | complete job | 50,000 | ₹50,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_1020293.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid