| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAccepted-AOC 14 15 VINAY NAGAR VIJITEM PUBLIC SCHOOL QUARSI RAMGHAT ROAD ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.0 Cr | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹1.1 Cr+₹6.6 L (6.46%)Rejected-Finance A 4 GALI NO 1 ANANDPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹1.1 Cr+₹6.6 L (6.46%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹1.1 Cr+₹6.8 L (6.61%)Rejected-Finance 7 8 WEST PRATAP NAGAR MAHOLI ROAD MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹1.1 Cr+₹6.8 L (6.61%) | L3 | Rejected-Finance THIRD LOWEST |
| 4 | L4₹1.2 Cr+₹13.1 L (12.8%)Rejected-Finance | ₹1.2 Cr+₹13.1 L (12.8%) | L4 | Rejected-Finance FOURTH LOWEST |
| 5 | L5₹1.3 Cr+₹30.8 L (30.2%)Rejected-Finance | ₹1.3 Cr+₹30.8 L (30.2%) | L5 | Rejected-Finance FIFTH LOWEST |
| Sl No | Description | Qty | Unit | SUBHASH SINGH RANA L5 | M/S SHIVA ENGG AND CONTRACTOR L3 | M/S PRADEEP ASSOCIATES L2 | M/s Nimesh Brothers Construction Co L4 | GOMATINETRA CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth Work in Excavation of Foundation in dry ordinary soil including lift upto 1.5 M and Lead upto 30 M and including filling, watering and ramming excavated earth into the trenched or in to the space between the structure and the sides of foundation trenches or in to the plinth with removal and disposal of surplus earth, complete all as specified and as directed by engineer in charge. | 1,642 | cum | 50 ₹82,100 Lowest | 94 ₹1,54,348 | 95 ₹1,55,990 | 70 ₹1,14,940 | 50 ₹82,100 Lowest |
| 2.00 | C.C. (M-15) with cement, course sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P complete all as specified and as directed by engineer in charge. | 129 | cum | 6,900 ₹8,90,100 | 5,500 ₹7,09,500 | 5,550 ₹7,15,950 | 5,400 ₹6,96,600 | 3,800 ₹4,90,200 Lowest |
| 3.00 | C.C. (M-20) with cement, coarse sand, Crushed stone Aggregate 10 to 25 mm i/c cost of all Material Labour and T&P complete all as specified and as directed by engineer in charge. | 240 | cum | 7,500 ₹18,00,000 | 6,000 ₹14,40,000 | 6,280 ₹15,07,200 | 6,000 ₹14,40,000 | 4,500 ₹10,80,000 Lowest |
| 4.00 | R.C.C. in (M-25) with cement, coarse sand and Crushed stone Aggregate including all Cost of Material, Labour & T&P etc. complete all as specified and as directed by engineer in charge. | 480 | cum | 9,200 ₹44,16,000 | 7,700 ₹36,96,000 | 7,800 ₹37,44,000 | 7,200 ₹34,56,000 | 5,800 ₹27,84,000 Lowest |
| 5.00 | CC (M-25) in cement, course sand and Crushed stone grit including all Cost of Material, Labour & T&P etc.complete all as specified and as directed by engineer in charge. | 16 | cum | 5,600 ₹89,600 Lowest | 6,825 ₹1,09,200 | 7,200 ₹1,15,200 | 6,700 ₹1,07,200 | 6,000 ₹96,000 |
| 6.00 | Centering & Shuttering steel of CC work including all Cost of Material, Labour & T&P etc. complete. all as specified and as directed by engineer in charge. | 832 | Sqm | 300 ₹2,49,600 | 77 ₹64,064 | 70 ₹58,240 Lowest | 150 ₹1,24,800 | 400 ₹3,32,800 |
| 7.00 | Centering & Shuttering steel of R.C.C. work including all Cost of Material, Labour & T&P etc.complete all as specified and as directed by engineer in charge. | 1,032 | Sqm | 575 ₹5,93,400 | 155 ₹1,59,960 | 140 ₹1,44,480 Lowest | 700 ₹7,22,400 | 400 ₹4,12,800 |
| 8.00 | Surface Dewatering by 5 HP diesel pump set with all arrengement for construction of foundation. Assume shall be used for 20 hrs average per day for 20 days for work upto bed level.complete all as specified and as directed by engineer in charge, complete all as specified and as directed by engineer in charge. | 7,460 | kwh | 14 ₹1,04,440 Lowest | 24.5 ₹1,82,770 | 18 ₹1,34,280 | 20 ₹1,49,200 | 32 ₹2,38,720 |
| 9.00 | Supplying Laying of one layer of Tar felt 10 mm thick I.S.I. marked at the junction of wall and roof or any place i/c necessary overlap giving a coat of approved mastic paint below the tar felt i/c cost of all material labour and T&P.complete all as specified and as directed by engineer in charge. | 3 | Sqm | 540 ₹1,620 | 425 ₹1,275 | 430 ₹1,290 | 400 ₹1,200 Lowest | 1,000 ₹3,000 |
| 10.00 | Steel Reinforcement Work i/c Cutting, Bending, Binding & Placing of i/c cost of binding wire & Steel including all Cost of Material, Labour & T&P etc, complete all as specified and as directed by engineer in charge, | 45 | MT | 75,000 ₹33,75,000 | 66,000 ₹29,70,000 | 65,000 ₹29,25,000 Lowest | 75,000 ₹33,75,000 | 71,000 ₹31,95,000 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
31 Oct 2025, 3:00 pmClosed
SE IWC MATHURA
SE IWC CIVIL LINE MATHURA
Reconstruction work of Box Culvert at Km 5.110 of Mat Feeder.
2025_UPIDC_1084062_1
08/SE/2025-26
Open Tender
Civil Works
Item Wise
180 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,314
₹2.7 L
SE IWC MATHURA
8 Dec 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
31 Oct 2025
25 Oct 2025
27 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.34 MB
all.pdf
Tender Documents • 5.29 MB
BOQ_1986304.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .