Loading…
Loading…
Updated dates
Tender Value
₹39.2 L
EMD Value
₹78,400
Closing Date
9 Jun 2026, 6:00 pm4d left
GE IMA Dehradun
GE IMA Dehradun
SPECIAL REPAIR TO FE STORE NEAR HELIPAD AND IFA OFFICE IN NORTH COMPLEX AT IMA DEHRADUN
2026_MES_764893_1
GE/IMA/T-39 OF 2026-27 9670/E8
Open Tender
Civil Works
180 days
GE IMA Dehradun
As per tender docus/NIT
7 documents required · 7 mandatory
₹500
GE IMA Dehradun
₹78,400
Yes
12 May 2026
12 May 2026
16 Jun 2026
12 May 2026
9 Jun 2026
26 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Material and labour for brick work with sub class 'B' brick straight or curved on plan exc. 6 m mean radius built in cement mortar 1:6 including demolition of brickwork or stone/boulder masonry, built in cement mortar including all quoins, arches, pillars, etc, but excluding ashlar facings, dressed stonework and precast concrete articles complete all as specified and directed. | 6 | Cum | - | - |
| 2 | Taking down cement plaster on brick or stone walls, etc. including raking out joints, hacking for key, scrubbing down with water, etc. complete all as specified and directed. | 625 | Sqm | - | - |
| 3 | Material and labour for 15 mm thick rendering on brick work or concrete surface in cement mortar 1:6, surface finished even and smooth (without using extra cement) complete all as specified and directed. | 510 | Sqm | - | - |
| 4 | Material and labour for 15 mm thick rendering on brick work or concrete surface in cement mortar 1:4, surface finished even and smooth (without using extra cement) complete all as specified and directed. | 60 | Square metre | - | - |
| 5 | Material and labour for preparation of surfaces of wall and applying two coats of weather coat exterior paint over a coat of primer including sanding/grinding complete all as specified and directed.
Make : Asian paints Apex (Ultima)/Berger Paints weather coat Glo/Shalimaar Paints weather PRO+ | 400 | Sqm | - | - |
| 6 | Material and labour for broken stone or boulders hardcore of gauge nexc. 63 mm, deposited, spread and levelled in layers nexc. 15 cm thick, watered and rammed to a true surface complete all as specified and directed. | 30 | Cum | - | - |
| 7 | Material and labour for PCC 1:4:8 type D-2 (using 40 mm graded stone agg) as in foundation, filling, mass concrete and sub base of floor including demolition of existing old concrete complete all as specified and directed. | 22.5 | Cum | - | - |
| 8 | Material and labour for machine cut Kota stone 20 to 25 mm thick in floorings over and including cement screed base 20 mm thick in CM 1:4 laid and jointed with grey cement slurry and pointed in grout to match the shade of the slab including rubbing and mirror polishing to be matched with existing floor upto satisfactIon of Engineer-in-Charge incl demolition complete all as specified and directed. | 300 | Sqm | - | - |
| 9 | Material and labour for machine cut Kota stone 20 to 25 mm thick in skirtings, dado and pillar over cement screed base 10 mm thick in CM 1:3 laid and jointed with grey cement slurry and pointed in grout to match the shade of the slab including rubbing and mirror polishing to be matched with existing floor incl demolition complete all as specified and directed. | 12 | Sqm | - | - |
| 10 | Taking down chowkhats or frames exc 1.5 sqm and n.exc 4 sqm each (without taking off shutters from the frame) and removing from the site complete all as specified and directed. | 2 | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Genpage39.pdf
Tender Documents • 1.32 MB
BOQ_856694.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid