| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC | ₹8.7 L | L1 | Accepted-AOC Agreement executed on 07/08/2024 |
| 2 | L2₹9.1 L+₹38,034.32 (4.36%)Rejected-AOC | ₹9.1 L+₹38,034.32 (4.36%) | L2 | Rejected-AOC Higher rate and hence not admitted |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical L4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical L5 |
Tender Value
₹13.9 L
EMD Value
₹34,790
Closing Date
9 Jul 2024, 2:00 pmClosed
ASSISTANT EXECUTIVE ENGINEER
ASSISTANT EXECUTIVE ENGINEER RWSS KOZHIKODE
DEPOSIT PROJECT NO 1322 23 BALANCE FUND RWSS TO CHERUVANNUR LAYING PIPE LINE TO VARIOUS PLACES IN CHERUVANNUR ZONE IN KOZHIKODE CORPORATION
2024_KWA_677351_1
RWS/KWA/KKD/05/2024-25
Open Tender
Civil Works - Water Works
Item Rate
90 days
Cheruvannur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
₹34,790
7 Aug 2024
3 Jul 2024
11 Jul 2024
3 Jul 2024
9 Jul 2024
3 Jul 2024
3 Jul 2024 - 5 Jul 2024
Amount
WORKING CHARGES
15.43.2:Dismantling manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in-Charge:Bituminous road
15.2.1:Demolishing cement concrete manually / by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in-Charge.Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.5:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50 m, in Ordinary Rock.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.9.7:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 75 mm nominal outside diameter pipes.
100.31.2.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class II.
100.41.39:Supply, stacking, spreading and consolidating of Quarry Muck in the trench of pipe line, including carriage, loading, unloading & stacking up to any lead.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
OD234343/2023-2024:Supplying and fixing 150mm CI surface box embeded with RCC slab of size 0.6x0.6x0.15<br>and160mm or above size PVC pipe acting as protection tube with including all cost of conveyance, labour charges<br>etc.complete<br>
OD234344/2023-2024:Making connections from 63/75/90/110/140/160/200/250mm dia pvc pipe line to the proposed line by cutting and providing suitable size pvc Tee, the charges including all provisions for BT cutting, earth work excavation in all classes of soil, bailing of water , fencing, labour for controlling traffic and valves, providing and filling quarry muck in the trenching work etc complete.
OD234345/2023-2024:interconnections from 350 mm dia DI pipe line to the proposed line by cutting and providing suitable size Tee, 2 nos MJ collar, CID joint etc., the charges including all provisions for BT cutting, earth work excavation in all classes of soil, bailing of water , fencing, labour for controlling traffic and valves, providing and filling quarry muck in the trenching work etc complete.
COST OF MATERIALS
100.98.235:Supply of PVC Pipe, 10kg/cm2, 75mm Dia.
OD234347/2023-2024:Supply of PVC specials @3% cost of PVC pipes
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
road restoration pwd road
3.6:Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
4.2.A.1:Construction of granular sub-base by providing graded material, spreading in uniform layers with a motor grader on a prepared surface, mixing by mix in-place method with rotavator at OMC, and compacting with a vibratory roller to achieve the desired density, complete as per clause 401. Grading-III -For lower sub-base - Mix in Place Method
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
5.1.a:Providing and applying primer coat with bitumen emulsion ( SS) on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means.
5.2.b:Providing and applying tack coat with bitumen emulsion (RS) using emulsion pressure distributor at the rate of 0.25 - 0.30 kg per sqm on the prepared Granular Surface cleaned with mechanical broom.
5.3.2.a:Providing and laying bituminous macadam with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with a bituminous binder (VG 30), transported to the site, laid over a previously prepared surface with paver finisher to the required grade, level, and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction For Grading II - (19 mm nominal size)
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
5.6.2.a:Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.4 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II (13.2 mm Nominal Size)
jeshil.p
MUHAMMED UVAIS C H
P NAGARATHNAN
RAMACHANDRAN C K
SUBASH P K
Bidder Name
jeshil.p
P NAGARATHNAN
RAMACHANDRAN C K
SUBASH P K
MUHAMMED UVAIS C H
YADHU KISHAN
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1053268.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .