| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | L1 | Accepted-AOC l1 | |
| 2 | L2₹12.3 L+₹30,775 (2.56%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹12.6 L+₹54,000 (4.49%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹12.6 L+₹57,250 (4.76%)Rejected-Finance | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹32,800
Closing Date
1 Jan 2021, 6:00 pmClosed
Executive Engineer Kozhikode
Office of The Executive Engineer Harbour Engineering Division Kozhikode,Puthiyanirathu, Elathur PO, Kozhikode 673 303
LAC - ADS - Construction of Disaster Shelter cum Community Hall in Santhi Nagar Colony, West hill, Kozhikode - Flooring and Providing Eave board
2020_HED_402012_1
HED/EE/25/2020-21e-T/s
Open Tender
Civil Works - Buildings
Item Rate
Vellayil
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,975
Yes
₹32,800
Yes
28 Jan 2021
23 Dec 2020
5 Jan 2021
23 Dec 2020
1 Jan 2021
23 Dec 2020
23 Dec 2020 - 29 Dec 2020
Amount
Flooring and Providing Eave board
11.41.2 : Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm.
14.72 : Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
50.10.1 : Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
12.26.2 : Providing and fixing plain Multipurpose Cement board (High Pressure steam cured) as per IS : 14862, with suitable screws for fibre cement board in ceiling etc. complete (frame work to be paid separately) :6 mm thick Cement bonded wood particle board as per IS:14276
13.26 : Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
13.47.1 : Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:New work (Two or more coats applied @ 1.43 ltr/ 10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm)
13.52.1 : Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On steel work
2.31 : Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
30.2.2 : Supplying and stacking of good earth at site including royalty and carriage upto 5 k.m. lead complete (earth measured in stacks will be reduced by 20% for payment).
30.2.11 : Renovating lawns including weeding, cheeling the grass, forking the ground, top dressing with sludge or manure, mixing the same with forked soil, watering and maintaining the lawn for 30 days or more till the grass forms a thick lawn free from weeds and fit for mowing and disposal of rubbish as directed, including supplying good earth if needed but excluding the cost of sludge or manure (the good earth shall be paid for separately).
od1840/2020_2021 : Engaging Man mazdoor for Watchman cum Gardner
ganeshan
BALAKRISHNAN P V
MYTHREE CONSTRUCTIONS
Bidder Name
MYTHREE CONSTRUCTIONS
ganeshan
biju p v
BALAKRISHNAN P V
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_571601.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .