Tender ID
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-Finance | L1 | Accepted-Finance LOWEST BIDDER | |
| 2 | L2₹2.7 L+₹1,488.98 (0.55%)Rejected-Finance | L2 | Rejected-Finance HIGHER BIDDER | |
| 3 | L3₹2.7 L+₹3,519.40 (1.30%)Rejected-Finance | L3 | Rejected-Finance HIGHER BIDDER |
Tender Value
₹2.7 L
EMD Value
₹5,414
Closing Date
16 Feb 2026, 2:00 pmClosed
ASSISTANT ENGINEER RANAGHAT SUB_DIVISION PHE Dte.
PHE Complex (Bhander), A2 Market Rail Gate, Shiv Mandir, Ward No. 15, Kalyani
Arrangement for valve operation and protection of pipeline at Dakshinpara Zone-I PWSS under Ranaghat Sub-Division under Nadia Division P.H.E Dte.
2026_PHED_997568_4
WBPHE_05_RSD_2025-26_SL NO_1 TO 4
Open Tender
CIVIL WORKS
Percentage
15 days
KALYANI
Please refer Tender documents
5 documents required · 5 mandatory
₹5,414
18 Mar 2026
2 Feb 2026
18 Feb 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc. Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
I) For structural members of specified sections weighing less than
22.5 Kg./m | 0.37 | MT | 72,603 | ₹26,503.73 |
| 2 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed.
i) 100 mm diameter | 69 | Mtr. | 96 | ₹6,624 |
| 2.1 | ii) 125 mm diameter | 51 | Mtr. | 145 | ₹7,395 |
| 2.2 | iii) 150 mm diameter | 486 | Mtr. | 217 | ₹1,05,462 |
| 3 | Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles
i) 100 mm diameter | 35 | Mtr. | 83 | ₹2,905 |
| 3.1 | ii) 150 mm diameter | 324 | Mtr. | 105 | ₹34,020 |
| 4 | Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus- bullah as ties and runners including necessary nails, bolts and nuts.. | 85 | Mtr. | 20.6 | ₹1,751 |
| 5 | Supply of Second hand empty cement bags in good condition. | 825 | Each | 3.3 | ₹2,722.5 |
| 6 | Labour for filling Gunny bags with dry earth, stitising the bag carrying and placingin position all complete | 825 | cu.m. | 3.5 | ₹2,887.5 |
| 7 | Earth work in filling in compound tank low land, ditches etc. with good earth in layer not exceeding 150mm. including breaking clods & consolidating the same by ramming & dressing complete.( Payment will be made on profile measurement before and after the work).
(ii) With carried earth arranged by the contractor within a radius exceeding 3 km. but not exceeding 5 km. including the cost of carried earth. | 75 | cu.m. | 491.79 | ₹36,884.25 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_2442629.xls
BOQ • 0.31 MB
WBF_2911.pdf
Additional Documents • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .