Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹52,817.31Admitted-Fee/PreQual/Technical/Finance B N R KALI MANDIR ALKUSA DHANBAD JHARKHAND 828117 | DHANBAD | DHANBAD | JHARKHAND | 828117 | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹73,796.41+₹20,979.10 (39.7%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹77,150.80+₹24,333.49 (46.1%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹67,088
Closing Date
4 Nov 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ACE, Bastacolla Area
Civil Deptt., Bastacolla Area
Cleaning and Repairing of Chhat Talab and Ghat at Singh Nagar under Bastacolla Area
2026_BCCL_368000_1
BCCL/Civ/BA/26-27/eNIT34/1081
Open Tender
Civil Works - Others
Percentage
7 days
Civil Department Bastacolla Area
Please refer Tender documents.
4 documents required · 4 mandatory
5 Nov 2026
31 Oct 2026
5 Nov 2026
31 Oct 2026
4 Nov 2026
31 Oct 2026
31 Oct 2026 - 2 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil. | 203.05 | M3 | 154.9 | ₹31,452.07 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil.+ Extra rates for quantities of works, executed:In or under water and/or liquid mud, including pumping out water as required. | 73.17 | M3 | 185.88 | ₹13,601.43 |
| 3 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 1,347.05 | M2 | 5.35 | ₹7,206.72 |
| 4 | Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in Foundation & Plinth in :Cement mortar 1:4 (1 cement : 4 coarse sand). | 0.48 | M3 | 5,203.35 | ₹2,484.92 |
| 5 | 12 mm thick c.p.of mix (1:4) with n.c.p. do-do complete job. | 7.32 | M2 | 288.25 | ₹2,108.8 |
| 6 | Total impact of GST for the purpose of CTC | 1 | Nos. | - | - |
stage.html
html • 0.02 MB
finance_380974.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.47 MB
BOQ_380974.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .