Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAccepted-AOC | ₹1.7 L | L1 | Accepted-AOC first bidder |
| 2 | L2₹1.7 L+₹5,014 (2.95%)Rejected-AOC | ₹1.7 L+₹5,014 (2.95%) | L2 | Rejected-AOC second bidder |
| 3 | L3₹1.9 L+₹21,504 (12.7%)Rejected-AOC | ₹1.9 L+₹21,504 (12.7%) | L3 | Rejected-AOC Third bidder |
| 4 | L4₹1.9 L+₹24,222 (14.3%)Rejected-AOC | ₹1.9 L+₹24,222 (14.3%) | L4 | Rejected-AOC forth bidder |
| Sl No | Description | Qty | Unit | T BINU KUMAR L3 | REVATHY CONSTRUCTIONS L4 | Joji L1 | RAJAMONY T L2 |
|---|---|---|---|---|---|---|---|
| 1.00cleaning work | |||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 988.35 | sqm | 17.05 ₹16,851.37 | 17.29 ₹17,088.57 | 15.13 ₹14,953.74 Lowest | 15.58 ₹15,398.49 |
| 1.00 | OD7258/2026-2027:Removal of all floating organic and inorganic wastes such as cloth wastes, bottles, electronic wastes,<br>electric wastes, wooden branches of trees, thermocols, hotel wastes, poultry waste, plastic wastes,<br>kitchen utensils, leafs and other dumped wastes Using any type of departmental/ contractors own<br>machinery including disposal of removed materials by the contractor at his own means without causing<br>damage to environment and society including all leads lifts etc complete as departmental officers in<br>charge. for 1m2 area cleaning | 905.5 | sqm | 70.25 ₹63,611.38 | 71.25 ₹64,516.88 | 62.36 ₹56,466.98 Lowest | 64.2 ₹58,133.1 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 55 | each | 354 ₹19,470 | 359.02 ₹19,746.1 | 314.24 ₹17,283.2 Lowest | 323.5 ₹17,792.5 |
| 1.00 | OD7257/2026-2027:Excavating the river deposits comprising of solid wastes,organic and inorganic wastes inc plastic wastes , silt , earth etc by mechanical/manual means lead up to 50 m and lift up to 1.5 m as per the direction of Engineer in charge | 378.89 | cum | 241.49 ₹91,498.15 | 244.92 ₹92,797.74 | 214.37 ₹81,222.65 Lowest | 220.69 ₹83,617.23 |
Tender Value
₹2.1 L
EMD Value
₹5,219
Closing Date
19 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer
o/o the AEE Irrigation South Subdivision Tvpm
GENERAL-Karkidaka Vavu Bali festival 2026-Maintenance and cleaning of various bali tharpan ghats constructed by the department prior and during Karkidaka Vavu Bali rituals 2026-General Civil Work
2026_Irrig_855975_1
IRR/IA/TR/3348/2026_5_2_1/1
Open Tender
Civil Works - Others
Item Rate
120 days
karamana
please refer tender documents
11 documents required · 11 mandatory
₹555
Yes
₹5,219
Yes
16 Jul 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
19 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1cleaning work | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | OD7258/2026-2027:Removal of all floating organic and inorganic wastes such as cloth wastes, bottles, electronic wastes,<br>electric wastes, wooden branches of trees, thermocols, hotel wastes, poultry waste, plastic wastes,<br>kitchen utensils, leafs and other dumped wastes Using any type of departmental/ contractors own<br>machinery including disposal of removed materials by the contractor at his own means without causing<br>damage to environment and society including all leads lifts etc complete as departmental officers in<br>charge. for 1m2 area cleaning | - | sqm | - | - |
| 1.003 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.004 | OD7257/2026-2027:Excavating the river deposits comprising of solid wastes,organic and inorganic wastes inc plastic wastes , silt , earth etc by mechanical/manual means lead up to 50 m and lift up to 1.5 m as per the direction of Engineer in charge | 1 | cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1446743.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
sbd.pdf
Tender Documents • 1.64 MB
BOQ_1446743.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .